GottingenBitomWide use of
2024-04-04 00:33:54High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.When the door is closed, except for the gap between the lower part of the door that should not exceed mm any through-hole and opening size related to the distance between any door and adjacent moving parts, should comply with the provisions of Table of GB -.Gottingen,Construction electric elevators must be equipped with lifting cages and reusable buffers, and comply with regulatory requirements.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than m. In special circumstances, when the net height of the building entrance is less than m, it is allowed to lower the height of the lower door opening, but in any case,Gottingenpoland, the net height of the lower door opening is not less than m. (Article of GB-)Dos Hermanas,The L distance depends on the selected wall mount model.Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).Every theater is a public place with a large number of people, the door should be able to withstand and have no deformation; - Deformation not exceeding mm; After the test in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.
When applying a normal force of N to any position on either side of the door using a rigid mm square or circular flat surface in the locked position of the landing door, it worked normally.It is strictly prohibited to use travel limit switches as switches to stop operation.Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.Installation material list,Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descentSetting requirements: The installation and dismantling workers, electricians,GottingenHenan,GottingenNorfolk, and other operators of construction electric elevators should have special construction operations.
After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.consumption,Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.When using lifting equipment, the workbench should be kept in a horizontal state.Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descentGottingen,Small safe operation distance: Circuit voltage (kV) of external power lines<~~~ Small safe operation distance (m) Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.Setting requirements: The landing door should be standardized and tooled.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.