JamaicaGrouting hollow anchor manufacturerProduction and function of products

2024-04-04 01:22:05
965HP113924865Building materials40

Appropriate measures shall be taken to prevent surface water,JamaicaSmall catheter, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.Jamaica, Display and record the time history curve of the received signal in real time. It is safe and does not need to be welded on site.Son Tay,The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality, but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, you should explain it in detail to the manufacturer in the order. The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end, which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe. Low cost, fast time, no loss, free from climate and place constraints.In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water, and construction shall not be carried out in rainy days or wet roads; Glass fiber grouting pipe is made of grouting pipe, which is easy to irritate human skin. Construction personnel must wear protective gloves; When the grouting pipe is laid, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two,JamaicaGrouting pipe leading small conduit, which will then generate friction. This friction is generally called 'surface friction'.


JamaicaGrouting hollow anchor manufacturerProduction and function of products



Grouting pipe at tensioning end: the grouting pipe installed at the end of the grouting pipe reinforcement and capable of tensioning is also called grouting pipe grouting pipe. The so-called grouting pipe is a grouting pipe in post tensioning structure or component to maintain the tension of the grouting pipe reinforcement and transmit it to the mixed tension; Fixed end grouting pipe: a grouting pipe installed at the end of the grouting pipe reinforcement and usually buried in the concrete without tensioning. The standard of the grouting pipe used for the grouting pipe reinforcement is the national standard of the people&#;s Republic of China (GB / T -, which ensures that the products manufactured by our company conform to the product quality law of the people&#;s Republic of China and the standard law of the people&#;s Republic of China Grouting pipe is the only acoustic pipe specially used for ultrasonic testing in the market. The grouting pipe is made of cold and hard steel pipe after professional molding, and is connected by clamp pressure connection, screw connection, flange connection and other methods. It has a reliable anti-seepage effect during concrete pouring. Two convex grooves are planned at the end of the bell end of the high-strength double seal clamp type acoustic measuring pipe, and the convex grooves are equipped with sealing rings. When installing the device, the socket end of the product is stabbed into the bell end by cm, and then the two convex grooves are kneaded together with special hydraulic pliers. The pipe at the kneaded part is shortened and deformed after being stressed, and the outer pipe between the two convex grooves is deeply immersed into the inner pipe, and then the reliable connection of the product is completed; After being kneaded the rubber sealing ring deforms and fits between the two layers of pipes, playing an excellent double safety sealing effect.Features of reusable grouting pipe: with one-way switch . Good anti blocking property and no backflow of slurry.Among the many imported projects, the development of the production technology of automobile door and window sealing strips is the most representative. Through the introduction of sealing strip production lines from Japan, Germany, Italy, Britain and other countries, up to now, domestic manufacturers have introduced more than sealing strip production lines. In addition to pure rubber sealing strips, sealing strips of various composite structures, the overall level of China&#;s sealing strip production technology has basically reached the level of foreign countries in the s rubber and plastic composite sealing strips can be produced. At present, and has become a grouting pipe. Because some projects are not easy to detect when they are manufactured, and the quality of the grouting pipe as a channel for testing instruments has become crucial. If the quality of the grouting pipe is poor, it will bring many hidden dangers. Steel grouting pipe material, which has the characteristics of thin pipe wall, steel saving, is generally used for post tensioned reserved holes in prestressed structures. When the grouting pipe is used, it can be directly bound to the reinforcement framework. Because the grouting pipe is very light, attention should be paid to the balance of its axis during installation.market price,The arrangement of the strain gauge shall be installed before the prestressing force is applied, and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, clean the reserved groove, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place, and the grouting pipe device in Hainan shall be kept clean when pouring concrete. The overhead type is a special rack installed at the bottom of the driving head and connected with the wellhead tensioning equipment.


JamaicaGrouting hollow anchor manufacturerProduction and function of products



The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern, and is also a grid like integral geo reinforced material, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, a large deformation modulus and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways, because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress, increase the deformation modulus of the soil, effectively enhance the strength of the soil, and achieve the effect of stabilizing the project and long-term use.Affordable price,At the same time, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple fast construction and low investment. Classified according to the grout materials used for grouting Cement grouting: the grout materials are mainly cement, including the addition of other additives. It is safe and does not need to be welded on site.Jamaica,The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, molding, punching, stretching, shaping,JamaicaSupport small conduit, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight, high strength, isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.The grouting pipe diffuses the load on it. When the reinforced soil is loaded, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, greatly improving the bearing capacity of the soil.When the grouting pipe is installed, the axis deviation shall be ≤ cm, and the bearing capacity of the support joint shall meet the design requirements. When connecting the grouting pipes, bolts must be installed symmetrically and tightened in sequence. Meanwhile, in order to prevent excessive deflection of the grouting pipes when axial force is applied, the deflection must be corrected to the horizontal before axial force is applied.


404 Not Found

404 Not Found


nginx

Related articles

JamaicaGrouting hollow anchor manufacturerProduction and function of products

JamaicaGrouting hollow anchor manufacturerProduction and function of products

The grouting pipe is used as the pipe for grouting at the bottom of the pile. The test shows that t...

评论列表

695HP135175170
2024-04-04 09:56:57

Yes, I hope to cooperate next time. Thank you boss~~ Fast delivery, JamaicaGrouting hollow anchor manufacturer basically satisfied.

914HP134131469
2024-04-04 08:29:18

The logistics of JamaicaGrouting hollow anchor manufacturer is a bit slow. Overall it's good, I hope I have a chance to cooperate next time

224HP159430236
2024-04-04 10:12:22

JamaicaGrouting hollow anchor manufacturer The quality is very good, the transfer has been received, the boss is troubled, thank you very much!

416HP186602172
2024-04-04 10:08:01

JamaicaGrouting hollow anchor manufacturer The quality is very good, the transfer has been received, the boss is troubled, thank you very much!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。