BedgoshSemi-automatic reclaimerWhat tests should be done before use

2024-04-04 01:22:00

b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), door opening width, then consider the non-standard design of the elevator.Bedgosh,. Different types of civil engineering traction elevators, screw elevators, and hydraulic elevators have different requirements for civil engineering. Common traction elevators require a certain amount of hoistway space, which can be made of concrete, steel structure hoistways, and glass curtain walls to create sightseeing elevators; The depth of the pit should be at least cm or more; Additionally, there are certain requirements for the height of the top floor.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth top floor height,BedgoshMobile reclaimer,BedgoshHome elevator villa self built house, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.Netivot,Electrical components are roughly divided into screens, electrical switches for each safety circuit etc. It is the brain of the elevator and the central nervous system of the elevator. The movement, operation, and door opening and closing of the elevator are all controlled by it, so it must be treated as a top priority in daily maintenance work. Do not short circuit the elevator circuit inside the screen during work. When the elevator door system malfunctions, someone shorts the elevator door for convenience in order to find the fault. This is very dangerous, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward, the elevator happens to run up or down to this point, and the hall door is shorted, the elevator cannot stop, so an accident is highly likely to occur. So in our daily maintenance work, we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover, after maintenance or urgent repairs are completed, we must promptly remove the short-circuit wire. Professional household elevator manufacturer with a large quantity and excellent quality at a reasonable price. It is fire-resistant, waterproof, high-temperature resistant, sturdy and durable, safe and reliablePlease note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel there is no restriction between the two escalators.The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degrees


BedgoshSemi-automatic reclaimerWhat tests should be done before use



Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.The braking system of the elevator is usually closed, which means it is in the braking state when there is no power, and only when it needs to be turned on, the brakes closed and the elevator was braked in mid air. When the elevator descends abnormally, cut off the power and the elevatorRestore the command button function in the cabin for firefighters to operate.demand,There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.The call button on each floor is no longer working,BedgoshMobile reclaimer, and the call is cut off.For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform,The front room of the fire elevator is equipped with Class B fireproof doors or fireproof rolling shutters with stopping function.The gantry elevator is used in the door legs of large gantry cranes to transport workers and maintenance components inside the gantry cranePlease note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.Bedgosh,The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.The requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise, but there should be no protruding foreign objects.Restore the command button function in the cabin for firefighters to operate.


404 Not Found

404 Not Found


nginx

Related articles

Jade SpringHousehold hydraulic lifting platformPre-sale plan process

Jade SpringHousehold hydraulic lifting platformPre-sale plan process

it is necessary to raise the lower arm to a certain height before starting the rotation. The rotati...

RotterdamHydraulic small lifting platformThe question temperature plays an important role

RotterdamHydraulic small lifting platformThe question temperature plays an important role

The concept of hydraulic boarding bridge is the power system of the boarding bridge. The large oil c...

TeneyFixed scissor lift tableStart a new marketing model

TeneyFixed scissor lift tableStart a new marketing model

one should be able to understand and pay attention to its automation, as well as understand its inn...

MalapiXinxiang hydraulic lifting platformPrecautions and tips for use

MalapiXinxiang hydraulic lifting platformPrecautions and tips for use

What are the advantages of elevators being loved and widely used by both new and old customers? What...

portland Small cargo elevatorThe construction follows the principle of trouble

portland Small cargo elevatorThe construction follows the principle of trouble

Brand. A first or second tier brand is sufficient, while a first tier selling brand also has good qu...

DusseldorfBoarding axle moving hydraulic pressurePrecautions for product use

DusseldorfBoarding axle moving hydraulic pressurePrecautions for product use

After the boarding bridge work is completed, the workbench should be lowered to a low position.Reaso...

评论列表

237HP184976196
2024-04-04 08:31:48

The seller is really good, BedgoshSemi-automatic reclaimer is the same as the introduction, honest seller

750HP120486450
2024-04-04 09:45:58

Good seller, BedgoshSemi-automatic reclaimer things are very good. Come back in the future. You can buy with confidence.

570HP155642700
2024-04-04 09:44:47

You BedgoshSemi-automatic reclaimer are okay, give a discount next time you buy, and buy your company's BedgoshSemi-automatic reclaimer

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。