KuliakanAdvance support of small conduitNew trends in industry development

2024-04-25 00:25:45
965HP113924865Building materials40

In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection,KuliakanTunnel leading small conduit and pipe shed, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.The grouting pipe at the tensioning end has good anchoring energy and self anchoring energy. Grouting pipe is generally used for tensioning. The grouting pipe at the tensioning end is composed of four parts: clip, anchor plate, anchor base plate and spiral reinforcement. The clip is the key part of the anchoring system. It is two-piece and made of high-quality alloy steel.Kuliakan,After checking that the formwork installed by the grouting pipe is tight and seamless, the reserved groove can be cleaned, and then the concrete can be poured and vibrated tightly. The concrete shall have at least the same strength as the structural concrete at this place. The grouting pipe device in Hainan shall be kept clean when pouring concrete.Two convex grooves are planned at the end of the bell end of the double seal clamp grouting pipe, and the convex grooves are equipped with sealing rings. During installation, the spigot end of the product is stabbed into the bell end. The grouting pipe then kneads the two convex grooves together with a special hydraulic clamp, and the pipe at the kneaded part is shortened and deformed after being stressed. The outer pipe between the two convex grooves is deeply embedded into the inner pipe, and then the connection of the product is completed; After being kneaded, a rubber sealing ring is deformed and pasted between two layers of pipes, which plays a double safety sealing effect.Guarda,The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness.It is laid in the soil, and through the bite and interlock between the grouting pipe mesh and the soil, it forms an efficient stress transmission mechanism, so that the local load can quickly and effectively spread to the large area of soil, so as to reduce the local failure stress and improve the service life of the project. The convex joint steel plastic grouting pipe is an upgraded product of the ordinary steel plastic grouting pipe, which changes the shortcomings of the ordinary grouting pipe, such as the small peeling force of the joint (n), the easy cracking of the welding point, the difficulty of construction, and the reduction of the role of side displacement prevention. Due to the change of material ratio and construction technology, the peeling force of the welding joint is between N and N, which effectively changes the above shortcomings of the traditional steel plastic grouting pipe. Because of the protruding joints at the welding position, it is called convex joint steel plastic grouting pipe, and its academic name is node reinforced steel plastic grouting pipe. The steel plastic grouting pipe is made of high-strength steel wire (or other fibers) through special treatment, and is extruded to form a composite high-strength tensile strip. If the surface is rough embossed, and is formed by welding its junction with the fusion welding technology of special reinforcement bonding. The grouting pipe is set out from the inner ring tap in the vertical setting out state, and the drawn out pipe forms a spring shape and stretches automatically. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur.The Xiaobian of prestressed machines and tools reminds us that there are many forms of grouting pipes, which can be distinguished from different angles, including the following. According to the type of reinforcement of the grouting pipe, it can be divided into the grouting pipe of thick reinforcement of the grouting pipe, the grouting pipe of parallel reinforcement (wire) bundle of the grouting pipe, and the grouting pipe of steel strand bundle of the grouting pipe. For thick reinforcement, one grouting pipe is generally used to anchor one reinforcement. For tendons and steel strands, a grouting pipe must anchor several steel bars or steel strands at the same time, which are often arranged in a ring or circle, or in a rectangle. Obviously due to the different number and arrangement of prestressed reinforcement, the form and structure of grouting pipe will also be different. According to the principle of grouting pipe and transmitting pretension, it can be divided into grouting pipe relying on bearing pressure, grouting pipe relying on friction and grouting pipe relying on adhesion.


KuliakanAdvance support of small conduitNew trends in industry development



The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?Process flow: the drilling machine is in place → drilling → mud injection → casing running → continuing drilling → slag removal → hole cleaning → lifting and placing the reinforcement cage → bottom cleaning by water injection → inserting the concrete conduit → pouring concrete → pulling out the conduit → inserting the pile top reinforcement. There are single liquid silicification, double liquid silicification, aerated silicification and electric double liquid silicification. It is safe and does not need to be welded on site.Home page recommendation, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.However, not all grouting pipe products can achieve this effect. Some inferior grouting pipe products not only fail to achieve the expected effect in use,KuliakanAdvance small conduit for tunnel, but also have problems such as low grouting efficiency, pipe burst and pipe bending, simple connection and high cost performance! Grouting pipe the grouting pipe is a kind of geosynthetic material formed by ultrasonic welding, which is composed of a steel plastic composite reinforced belt (built-in high-strength carbon spring steel wire (stress material) and wrapped with polyethylene resin (protective material) and arranged at right angles to the plane longitude and latitude. It is a comprehensive product of existing rigid reinforcement (flat steel strip, ribbed steel strip galvanized steel strip, reinforced concrete strip stainless steel strip etc.) and flexible reinforcement (polypropylene strip, plastic grouting pipe, warp knitted grouting pipe, etc.). Because of its high tensile strength, low elongation (≤ %), small creep, and strong interlocking and occlusive effect on the soil, it can effectively treat the soft soil foundation, restrict the lateral displacement of the soil, overcome the uneven settlement of the soil, greatly enhance the bearing capacity of the foundation and improve the overall performance of the foundation; It can be widely used in road engineering, railway engineering, retaining structure, dam engineering, water conservancy engineering and tunnel engineering; It has remarkable safeguard effect and good social and economic benefits against rutting and pavement cracking.In limestone area, the punching is not good and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.


KuliakanAdvance support of small conduitNew trends in industry development



The Xiaobian of prestressed machines and tools reminds us that there are many forms of grouting pipes, which can be distinguished from different angles including the following. According to the type of reinforcement of the grouting pipe, it can be divided into the grouting pipe of thick reinforcement of the grouting pipe, the grouting pipe of parallel reinforcement (wire) bundle of the grouting pipe, and the grouting pipe of steel strand bundle of the grouting pipe. For thick reinforcement, one grouting pipe is generally used to anchor one reinforcement. For tendons and steel strands, a grouting pipe must anchor several steel bars or steel strands at the same time, which are often arranged in a ring or circle, or in a rectangle. Obviously, due to the different number and arrangement of prestressed reinforcement, the form and structure of grouting pipe will also be different. According to the principle of grouting pipe and transmitting pretension, it can be divided into grouting pipe relying on bearing pressure, grouting pipe relying on friction and grouting pipe relying on adhesion.High quality and low price,The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, complete supply; The grouting pipe can be cut at the construction site according to the actual required length of the joint (it is recommended that the longer grouting outlet length should not exceed m); No special installation equipment is required; Grouting time can be arbitrarily selected; When grouting is carried out internally under proper pressure, the grouting pipe fluid can keep filling the whole pipe evenly; The system allows grouting under relatively low pressure; The grouting pressure is .-.mpa; The installation will not affect the characteristics of the building grouting pipe; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; If there is no leakage, grouting is not allowed.When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Other uses of grouting pipe introduction the grouting pipe of pile foundation refers to the steel pipe that needs to be embedded when testing the quality of pile foundation. Generally, it is bound in the reinforcement cage and lowered into the hole together with the reinforcement cage before pouring concrete! There are many reasons for the grouting pipe to gamble on the pipe, most of which are due to the leakage of slurry caused by the pipe joint not being welded well during processing, and also due to the pipe mouth not being closed well and falling debris, the pipe is blocked! To put it bluntly, the pipe is blocked by sundries! The role of the grouting pipe is to inject clean water into the grouting pipe and put the transducer into the grouting pipe for testing when the integrity of the pile foundation is tested by ultrasonic wave. If the grouting pipe is blocked, the transducer can not be put in, or can not be placed at the bottom of the pile,In the process of using the acoustic pipe, it is necessary to have a detailed understanding of its installation method, so that it can be used normally and improve the application quality of the grouting pipe. In the process of installing Jiangsu acoustic measuring tube we should pay attention to the orientation of the installation hole. As long as the device is installed in a correct hole, the Jiangsu acoustic tube can be used normally in the process of application, and the service life of Jiangsu acoustic tube can be improved. This is also the most important factor in the process of application in the future. If the hole fault is bragged about in the process of the device, the resistance of Jiangsu acoustic pipe will appear in the process of application, resulting in its damage. There is a great relationship between the accuracy of the hole and the quality after construction. In the process of construction, it is necessary to use the device according to the planned paper so that it can be used normally and improve the quality of use.In the process of application, because there will be many Jiangsu acoustic measurement pipes in the process of construction. In this way, the phenomenon of uneven stress will be formed. In the process of application the phenomena of conflict and unusable will be formed. In order to prevent the phenomenon of surrounding each other, it is necessary to pay attention to the method of the device in the process of the device, so that it can be used normally. The grouting pipe manufacturer introduced that the product quality of the grouting pipe is relatively stable, and when the mold is finalized, it is not easy to show defects. Most of the defects of the grouting pipe appeared in the trial production period, and most of them were formed due to the unreasonable planning structure of the mold. The grouting pipe manufacturer will briefly introduce the treatment methods of defects as follows: wrinkle appearance and treatment methods. The so-called wrinkle refers to that there is a convex edge on the circular arc surface of the grouting pipe, and there is a concave appearance on the adjacent side. This kind of wrinkle is mostly in the shape of sharp ridges, some of which are straight to the nozzle, in the shape of 'eight'. Chengdu grouting pipe manufacturers mostly occur on the inner arc surface, and some occur on the outer arc surface.At the same time, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.However, not all grouting pipe products can achieve this effect. Some inferior grouting pipe products not only fail to achieve the expected effect in use, but also have problems such as low grouting efficiency, pipe burst and pipe bending, which seriously affect the grouting effect of the grouting pipe and the progress of the whole project. The quality of grouting effect comes from the selection of high-quality grouting pipe products. Shengpeng grouting pipe is a good choice for you to choose grouting pipe products because of its high strength, awesome,KuliakanExpanded shell hollow grouting anchor manufacturer, simple connection and high cost performance! Grouting pipe the grouting pipe is a kind of geosynthetic material formed by ultrasonic welding, which is composed of a steel plastic composite reinforced belt (built-in high-strength carbon spring steel wire (stress material) and wrapped with polyethylene resin (protective material) and arranged at right angles to the plane longitude and latitude. It is a comprehensive product of existing rigid reinforcement (flat steel strip, ribbed steel strip, galvanized steel strip, stainless steel strip, reinforced concrete strip, etc.) and flexible reinforcement (polypropylene strip plastic grouting pipe, warp knitted grouting pipe, etc.). Because of its high tensile strength, low elongation (≤ %), small creep, and strong interlocking and occlusive effect on the soil, it can effectively treat the soft soil foundation, restrict the lateral displacement of the soil, overcome the uneven settlement of the soil, greatly enhance the bearing capacity of the foundation and improve the overall performance of the foundation; It can be widely used in road engineering, railway engineering, retaining structure, dam engineering, water conservancy engineering and tunnel engineering; It has remarkable safeguard effect and good social and economic benefits against rutting and pavement cracking.


404 Not Found

404 Not Found


nginx

Related articles

JamaicaGrouting hollow anchor manufacturerProduction and function of products

JamaicaGrouting hollow anchor manufacturerProduction and function of products

Appropriate measures shall be taken to prevent surface water,JamaicaSmall catheter, curing water and...

Alta304 stainless steel platePrice adjustment

Alta304 stainless steel platePrice adjustment

The blowing mouth of the welding tool should not be too small to avoid excessive concentration of he...

TrujilloAltoColor of wood floorHow to reduce the exposure time

TrujilloAltoColor of wood floorHow to reduce the exposure time

smell with your nose is not protected by the environment.TrujilloAltoThe second: I can&#;t tell the...

Tunisia301 high quality stainless steel pipeImprove equipment manufacturing level

Tunisia301 high quality stainless steel pipeImprove equipment manufacturing level

Low temperature embrittlement of stainless steel pipe --- in low temperature environment, the deform...

Santa Cruz de elseboSeamless small conduitWhat are the maintenance items

Santa Cruz de elseboSeamless small conduitWhat are the maintenance items

and is also a grid like integral geo reinforced material, so the friction between the grouting pipe...

Sansky most12Cr1MoVG seamless pipe manufacturerPrecautions when using and repairing

Sansky most12Cr1MoVG seamless pipe manufacturerPrecautions when using and repairing

Whether I-section steel is ordinary or light, because the section size is relatively high and narrow...

评论列表

530HP141750488
2024-04-25 08:00:15

After my personal experience, the reputation of this store is quite good. KuliakanAdvance support of small conduit The quality is more like a diamond. Thank you so much!

258HP138990173
2024-04-25 07:57:09

After receiving the goods, I feel that the quality KuliakanAdvance support of small conduit is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics company’s service attitude is very good, and the delivery speed is very fast. In general, this This is a very satisfying purchase, thank you to the seller.

914HP134131469
2024-04-25 09:12:29

Yes, I hope to cooperate next time. Thank you boss~~ Fast delivery, KuliakanAdvance support of small conduit basically satisfied.

416HP186602172
2024-04-25 08:21:01

I want to change a supplier and see you on the Internet, can I give a detailed explanation KuliakanAdvance support of small conduit

409HP184720764
2024-04-25 09:14:03

Just received the goods, very good, KuliakanAdvance support of small conduit great value for money! ! Come in the future!

984HP143755493
2024-04-25 08:07:09

The seller is really good, KuliakanAdvance support of small conduit is the same as the introduction, honest seller

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。