FeldkichSteel pipeThe price of environmental protection speculation continued to rise this week
2024-01-18 09:35:23The secondary grouting pipe can only be grouted once and cannot be reused.The secondary grouting pipe can only be grouted once and cannot be reused.
Push the rock powder and sundries that are not washed, remain at the hole bottom,FeldkichSteel pipe, or stick to the hole wall out of the grouting range,FeldkichSeamless pipe, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe, steel flower pipe, advance small conduit, high-pressure grouting pipe,FeldkichPrecision tube, pipe shed pipe and grouting pipe factory. During the preferential activities, new and old customers are welcome to consult to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration.FeldkichSteel pipeThe price of environmental protection speculation continued to rise this week,2024-01-1809:35:20● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.
● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.Water pressure test water pressure test is that the grouting pump injects clean water into the grouting section, and its main purpose is to check the slurry stop effect of the slurry stop pipe head, especially the slurry stop plug.Feldkich,Matsuyama,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.