RemidosSteel pipeSurface treatment process
2022-08-27 00:39:26Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price, service,RemidosSeamless pipe, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, sectional upward and sub full depth grouting. The segmented downward type is to start from the ground grouting can be divided into sectional downward, drill section holes from top to bottom and inject section slurry. After each injection section, continue to extend the drilling and grouting, so as to alternately carry out until the designed final grouting depth,RemidosPrecision tube, and then carry out re grouting from bottom to top; The sectional upward pattern is that the grouting hole is drilled to the final grouting depth at one time. All kinds of grouting pipes, steel flower pipes, advance small conduits, high-pressure grouting pipes, and then conduct secondary grouting for the full depth.A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.RemidosSteel pipeSurface treatment process,2022-08-2700:39:26Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method double liquid silicification method, aerated silicification method and electric double liquid silicification method.The secondary grouting pipe can only be grouted once and cannot be reused.
The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.Remidos,Manukau,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, aerated silicification method and electric double liquid silicification method.