Campechuela22hollow composite anchor manufacturerPrecautions before startup

2023-10-07 12:36:52
965HP113924865Building materials102

However, not all grouting pipe products can achieve this effect. Some inferior grouting pipe products not only fail to achieve the expected effect in use, but also have problems such as low grouting efficiency, pipe burst and pipe bending, which seriously affect the grouting effect of the grouting pipe and the progress of the whole project. The quality of grouting effect comes from the selection of high-quality grouting pipe products. Shengpeng grouting pipe is a good choice for you to choose grouting pipe products because of its high strength,CampechuelaTunnel leading small conduit and pipe shed, awesome, simple connection and high cost performance! Grouting pipe the grouting pipe is a kind of geosynthetic material formed by ultrasonic welding, which is composed of a steel plastic composite reinforced belt (built-in high-strength carbon spring steel wire (stress material) and wrapped with polyethylene resin (protective material) and arranged at right angles to the plane longitude and latitude. It is a comprehensive product of existing rigid reinforcement (flat steel strip, ribbed steel strip, galvanized steel strip, stainless steel strip, reinforced concrete strip, etc.) and flexible reinforcement (polypropylene strip, plastic grouting pipe, warp knitted grouting pipe, etc.). Because of its high tensile strength, low elongation (≤ %), small creep, and strong interlocking and occlusive effect on the soil, it can effectively treat the soft soil foundation, restrict the lateral displacement of the soil, overcome the uneven settlement of the soil, greatly enhance the bearing capacity of the foundation and improve the overall performance of the foundation; It can be widely used in road engineering, railway engineering, retaining structure, dam engineering, water conservancy engineering and tunnel engineering; It has remarkable safeguard effect and good social and economic benefits against rutting and pavement cracking.Can the stretching speed of grouting pipe be defined?Campechuela, According to the experimental results, optimize the specific parameters and determine the grouting materials and pressure. Cement grouting material cement slurry ordinary portland cement is the most commonly used cement grouting material. Its advantages are: wide source of raw materials, low cost, non-toxic, simple and convenient construction process. The disadvantages are: poor stability of cement slurry, easy precipitation and water precipitation, long setting time, the injection capacity is often limited to micro cracks []. It has good air tightness, strong sealing and no leakage.Kamphaeng Phet,The grouting pipe can be divided into unconstrained grouting pipe and constrained grouting pipe according to whether it can absorb the pressure thrust (blind plate force) generated by the medium pressure in the pipe; According to the displacement type of the grouting pipe it can be divided into axial grouting pipe, transverse grouting pipe, angular grouting pipe and pressure balance grouting pipe. The grouting pipe cannot bear load and should be hoisted separately; In addition to the pre deformation required by the design for pre stretching or cold tightening, it is forbidden to adjust the installation deviation of the pipeline by deforming the grouting pipe; During installation, welding slag is not allowed to splash onto the surface of grouting pipe and suffer other mechanical damage; All movable components of the grouting pipe shall not be jammed by external components or restrict the normal operation of its movable parts. Most of the failure of the grouting pipe is caused by the external environment corrosion. Therefore, in the structural design of the grouting pipe, the contact between the external corrosion medium and the grouting pipe can be considered. For example, for the external pressure axial grouting pipe, a packing sealing device can be added between the outlet end ring and the outlet pipe, which is equivalent to the sleeve grouting pipe. It can not only resist the invasion of external corrosive media, but also add a safety barrier to the grouting pipe. Even if the grouting pipe is damaged, the grouting pipe can also play a compensation role and avoid the failure of the grouting pipe. The use of grouting pipes has been indispensable in modern building construction. In the s, but they were fastener grouting pipes. In the s, China began to develop advanced grouting pipes with multiple s. With the continuous development of China&#;s construction industry in modern times, the construction industry has become increasingly mature and perfect in China, and the bamboo wood grouting pipe has been eliminated by the market. Grouting pipe has become the mainstream form of grouting pipe and is more widely used in construction.The glass fiber grouting pipe has the characteristics of easy construction, high temperature resistance, corrosion resistance, low elongation, high elastic modulus, no long-term creep meeting the requirements of environmental protection, and the tensile strength can reach kn / m and has high tensile strength in the transverse and longitudinal directions. The strength to weight ratio of glass fiber is larger than that of steel which provides sufficient strength to prevent reflection cracks. When it breaks, its elongation is less than %, it has high deformation resistance and good compatibility with asphalt mixture.There are many forms of grouting pipes that can be improved and applied. Although the engineering pipeline system is very complex, any complex pipe system can be divided into several relatively simple individual pipe sections through the setting of fixed pipe racks. When selecting the corrugated grouting pipe, the deformation compensation of the pipe system can be determined according to these relatively simple pipe sections, so as to select the grouting pipe.


Campechuela22hollow composite anchor manufacturerPrecautions before startup



The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.[] the technical scheme adopted by the utility model to solve the above technical problems is described as follows: [] a fast cutting device in the hole of a underground grouting pipe, the fast cutting device in the hole mainly consists of a fixed cutting device, a tension blade device and a cutting rotation device, [] the tension blade device is sleeved in the cutting rotation device, Screw threads are respectively arranged on the outer surface of the cutting rotating device and the upper end of the tension blade device. The tension blade device and the cutting rotating device are connected by threads. The end of the tension blade device protruding from the cutting rotating device is provided with a tension blade nut. The fixed cutting device is mainly composed of a cutting blade and a pulley. The cutting blade and the pulley are respectively connected on both sides of the cutting rotating device through slots, A flange plate and a bearing are arranged on the outer surface of the cutting rotating device, the quick cutting device in the hole is installed in the grouting pipe hole through the flange plate, and the fixed cutting device is connected with the grouting pipe flange plate through bolts. The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface.market, The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold, the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall.It is necessary to comprehensively consider the selection and configuration of grouting pipes, because there are many types of expansion joints, and correct selection is very important. Only in this way can the design of the piping system be safe, reasonable, reliable and economical.?Causes of wrinkling: the blanking specification of pipe joint is too long.


Campechuela22hollow composite anchor manufacturerPrecautions before startup



The arrangement of the strain gauge shall be installed before the prestressing force is applied, and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.project, The grouting pipe is specially used as a channel for the depth detection of pile foundation and for structural stress calculation. The grouting pipe is a small pipe, it can measure it and accurately reflect the data on the computer or sound receiver. During the concrete pouring of cast-in-place pile, a channel that allows the ultrasonic probe to be normally placed at the pile bottom is reserved, which is not considered in the structural stress calculation. When each formwork is in place, lay the steam probe at the bottom of the formwork, and adjust the profiling after installation. According to the actual needs, the shaped reinforcement on both sides of m shall be installed,CampechuelaPipe shed and small conduit,CampechuelaAdvance support of small conduit, and the well shall be upgraded and placed and marked.It is necessary to comprehensively consider the selection and configuration of grouting pipes, because there are many types of expansion joints, and correct selection is very important. Only in this way can the design of the piping system be safe reasonable, reliable and economical.?Campechuela,The arrangement of the strain gauge shall be installed before the prestressing force is applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, and the other is as a pipe for grouting at the bottom of the pile.The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption, it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better.


404 Not Found

404 Not Found


nginx

Related articles

Campechuela22hollow composite anchor manufacturerPrecautions before startup

Campechuela22hollow composite anchor manufacturerPrecautions before startup

Disposal method: the grouting pipe shall be shortened according to the specification.They shall be...

评论列表

938HP166090698
2023-10-07 13:49:31

Campechuela22hollow composite anchor manufacturer The goods have arrived, much better than what you see in the picture!

535HP136858825
2023-10-07 13:17:27

The manager is nice! Campechuela22hollow composite anchor manufacturer is also real.

717HP127443542
2023-10-07 14:25:41

Happy cooperation, give your company support and wish business prosperous.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。