SivednikaNew electric elevatorThe improvement effect of the pattern
2024-04-29 00:02:17When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.Mechanical devices controlled by cage movement should not be used to open or close the landing door.Sivednika,The body in the lateral adjustment device of the driving plate should ensure a compressed state, so that the gear has a certain radial constraint, and ensure that the gear and rack always mesh well throughout the entire operation.The bearing capacity of the ground under the concrete foundation plate should be greater than .Mpa.Bedele,Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.Horizontal lead screw mechanical electricityThe oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.
When the wall bracket adopts non matching standard products, design calculations should be carried out.Degrees, m/s.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.Welcome calls ,The L distance depends on the selected wall mount model.According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an intermediate stage,SivednikaElevator electric small, a T-shaped stage, or a hall.Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form and concrete strength report.
Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.Superior quality,SivednikaElectric curved arm elevator,For customers to use and operate the lifting platform for a long time,SivednikaElectric barrier free elevator, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.The shutdown device (emergency stop switch) should be non automatic reset type.Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring,Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness strength, stability etc., and the production should meet the design requirements.Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.