Grand kleshHigh altitude reclaimerShare the way of development with distributors

2024-04-27 01:02:29
limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Grand klesh,. Different types of civil engineering traction elevators, screw elevators and hydraulic elevators have different requirements for civil engineering. Common traction elevators require a certain amount of hoistway space, which can be made of concrete, steel structure hoistways, and glass curtain walls to create sightseeing elevators; The depth of the pit should be at least cm or more; Additionally, there are certain requirements for the height of the top floor.For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.Cacheu,Measurement of elevator and escalator shafts (III)To implement the arrangement of escalators and provide feedback, in order to determine the configuration of certain shared devices, the order of shipment, and the alignment of handrail turns during continuous arrangement.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.


Grand kleshHigh altitude reclaimerShare the way of development with distributors



The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall,Grand kleshElectric high-altitude reclaimer, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, while recording the measurement (safety must be paid attention to,Grand kleshHousehold villa elevator manufacturer, and special attention should be paid to moving parts such as counterweights and wire ropes).When wearing high heels, be careful not to step on the gap between the pedals, as not wearing shoes is more likely to be pinched by the toothed plate.Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator,There is a dedicated fire telephone in the fire elevator car.Maintenance of elevator hall doors and car doors. Elevator malfunctions usually occur on the elevator hall and car doors, so attention should be paid to the maintenance of the hall and car doors. One is to refuel the fuel on the upper sill of the door and keep it in good condition, so that the elevator will not make unpleasant noises during operation and the opening of the door. Pay attention to the inspection of the safety contact plate or light curtain type contact plate switch wire of the elevator, as the frequency of opening and closing the door in the elevator is high, which can cause damage to the switch wire. This requires maintenance personnel to inspect it every time they work, and replace it in advance to avoid users having doubts about the quality of the elevator product due to door issues.The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.


Grand kleshHigh altitude reclaimerShare the way of development with distributors



The front room of the fire elevator is equipped with Class B fireproof doors or fireproof rolling shutters with stopping function.management,Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.Passengers wearing long skirts and strapping sandals when riding on the escalator should try to stand slightly in the middle of the escalator to prevent shoes and clothing from being drawn into the escalator and causing danger, and to prevent skirts or pants from getting stuck.There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.Grand klesh,The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder, strictly speaking, the lifting height of a ladder is the vertical distance between the finished ground at the upper and lower support beams. When using the suspension line method to measure, attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors) and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size,Grand kleshVertical hydraulic elevator, door opening width, etc.), then consider the non-standard design of the elevator.The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.


404 Not Found

404 Not Found


nginx

Related articles

Navara100 box type transformerCommon manufacturing process methods in the industry

Navara100 box type transformerCommon manufacturing process methods in the industry

In the case of using dry-type transformer, it is easy to cause common faults in application. So, wha...

Jaruco Vertical centrifugal slurry pumpProduct quality shall be strictly controlled

Jaruco Vertical centrifugal slurry pumpProduct quality shall be strictly controlled

   The fixing method of the impeller is changed from screw thread to key clamp to prevent the impell...

lush mountainBuilding elevatorsStandard of living

lush mountainBuilding elevatorsStandard of living

Prepare the foundation according to the basic plan, leveling, and aligning points, and ensure the le...

PapenderchtHydraulic lifting table smallWhat to pay attention to when using

PapenderchtHydraulic lifting table smallWhat to pay attention to when using

The hydraulic oil used in the system has the same brand, and after each cleaning, the system should...

QinghaiGuide rail type lifting platformCompany knowledge

QinghaiGuide rail type lifting platformCompany knowledge

These devices are also relatively easy to operate during use and should be able to achieve goals and...

ShaanxiSmall curved arm elevatorWhat is the benefit if you complete the work in one go?

ShaanxiSmall curved arm elevatorWhat is the benefit if you complete the work in one go?

When using equipment, people will consider different information and situations, and reference them...

评论列表

258HP138990173
2024-04-27 09:18:37

I want to change a supplier and see you on the Internet, can I give a detailed explanation Grand kleshHigh altitude reclaimer

323HP155335083
2024-04-27 08:27:59

Dear, Grand kleshHigh altitude reclaimer I received it, I love it very much, the workmanship is nothing to say, haha, the service attitude is also super good, a very caring seller, I will frequent it in the future.

391HP142030639
2024-04-27 08:19:31

Can you give me a discount next time I buy it, Grand kleshHigh altitude reclaimer The quality is good, and I will live up to the boss

466HP159575805
2024-04-27 10:00:29

The logistics is very fast, look forward to working together again

632HP195506591
2024-04-27 08:24:53

Grand kleshHigh altitude reclaimer The quality is very good, the transfer has been received, the boss is troubled, thank you very much!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。