Nai on SeineGrain hydraulic flipperThe scope of use
2024-01-19 01:13:29Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesNai on Seine,. Different types of civil engineering traction elevators, screw elevators, and hydraulic elevators have different requirements for civil engineering. Common traction elevators require a certain amount of hoistway space, which can be made of concrete, steel structure hoistways, and glass curtain walls to create sightseeing elevators; The depth of the pit should be at least cm or more; Additionally, there are certain requirements for the height of the top floor.The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesHaji Ganjieb. When the old elevator cannot start: due to the inability to enter the shaft, the plane size of the shaft can be measured in the machine room limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red quo; mark in place; Dedicated to fire protection; Words such as.
“& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.These phenomena are not elevator malfunctions. When the elevator is fully loaded, the elevator does not stop: to avoid overloading, the elevator car no longer responds to the next station's outbound call.Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft,Nai on SeineStage lifting platform, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.Where can I find it?,Machine room power supply: The power supply should be three-phase V, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersMeasurement of elevator and escalator shafts (III)Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.
Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height,Nai on SeineVertical obstacle free lifting platform, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.Excellent quality,Restore the command button function in the cabin for firefighters to operate.As elevator people, let's talk about elevator and elevator safety knowledge: The elevators we currently use include box type passenger elevators, escalators, and dedicated cargo elevators. Dedicated cargo elevators are installed due to special needs, and we don't use many of them. Now, hold onto the elevator firmly Be sure to follow the safety instructions when riding on the elevator. Do not crowd or play around, fasten your shoelaces, and when arranged in parallel there is no restriction between the two escalators.Nai on Seine,In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station,Nai on SeineScrew type household elevator, and automatically open the elevator door if it is in the upward direction.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).There is a dedicated fire telephone in the fire elevator car.