ScottsdaleGrouting small conduitHow to select the slice spacing
2022-12-30 03:51:35The grouting pipe is used to pad the bottom of the horseshoe, change the cooperation specification of the mold, and adjust the cooperation space between the lower tire and the horseshoe.Consolidation Prevent landslide Reduce ground subsidence Improve foundation bearing capacity Backfill Reinforcement materials: cement slurry, chemical slurry, mixed slurry object: rock grouting, gravel grouting clay grouting, coal body grouting coal and rock mass grouting : anti-seepage grouting, reinforcement grouting,Scottsdale32lead small conduit, foundation underpinning grouting, water blocking reinforcement grouting, sealing filling grouting mechanism: filling grouting, splitting and vein grouting, bedrock crack grouting, seepage grouting Interface grouting, concrete crack grouting, compaction grouting pressure: static pressure grouting, high-pressure jet grouting ceramic technology; It is divided into high-pressure grouting and ordinary grouting injection grouting.It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in ChinaMarketing Department, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, clean the reserved groove, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place, and the grouting pipe device in Hainan shall be kept clean when pouring concrete.It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in China It is safe and does not need to be welded on site.
The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission,ScottsdaleSmall catheter, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption, it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better.Where can I find it?The longitudinal overlapping width of grouting pipe and grouting pipe shall not be less than cm, and the transverse overlapping width shall not be less than cm. The former shall be placed on the latter according to the asphalt paving direction. After laying the glass fiber grouting pipe fix the glass fiber grouting pipe with high-quality cement nails and fixed iron sheets with a size of mm, mm and a thickness of .mm. The fixed spacing can be determined according to the actual construction situation.Advantages of disposable grouting pipe: simple installation, complete set. No special installation equipment is required, and the cut-off length can be prepared on the construction site according to the actual requirements of the joint (the longest grouting pipe length is recommended not to exceed m), and the grouting time can be arbitrarily selected.When the grouting pipe is installed, the axis deviation shall be ≤ cm and the bearing capacity of the support joint shall meet the design requirements. When connecting the grouting pipes, bolts must be installed symmetrically and tightened in sequence. Meanwhile, in order to prevent excessive deflection of the grouting pipes when axial force is applied, the deflection must be corrected to the horizontal before axial force is applied.Scottsdale,Disposal method: the grouting pipe shall be shortened according to the specification.In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.Answer: Yes, the elastic extension speed of the grouting pipe can be defined within a certain range in the design, but for a grouting pipe that has been designed, its elastic extension speed is certain.