ChenandegaProfessional cold storage installationStatistics

2024-01-14 00:46:17
632HP195506591energy81

Anti odor floor drain shall be set on the pavement of refrigeration room and refrigeration unit room, electronic pit and other places convenient for drainage shall be provided with drainage and equipment to avoid backflow of water.Installation of unit electrical box: the unit electrical box shall be installed near the unit; Vertical installation. If the unit is installed on the top of the warehouse, the distance between the box bottom and the top of the warehouse must be & amp; gt; mm; The electrical box can be fixed on the building wall or on the angle steel frame.Chenandega,The volume of the controlled atmosphere warehouse the size of the controlled atmosphere warehouse shall be calculated according to the volume occupied by the storage products stacked in the controlled atmosphere warehouse, plus the aisle between rows, the space between the stack and the wall and ceiling, and the gap between the packaging. After determining the capacity, the length and temperature of the controlled atmosphere warehouse shall be determined. The design of the controlled atmosphere warehouse shall also consider the necessary auxiliary buildings and facilities, such as workshop Packing and sorting room, tool warehouse and loading and unloading platform, so that the quality of controlled atmosphere warehouse can be guaranteed.When installing polyurethane insulation board, ensure that its surface is smooth and flat without scratch and warpage.Orlova, the horizontal and vertical of the warehouse shall be designed according to the refrigeration, refrigeration equipment, transportation and stacking conditions. The selection of insulation board is very important for Guangdong cold storage. At present, the vast majority of cold storage use polyurethane insulation board. What are the characteristics and advantages of polyurethane insulation board?For the flushing (thawing) drainage pipe in the cold room with different temperature, an exhaust valve equipment shall be set before connecting the flushing (thawing) drainage pipe.During the installation of long-span top warehouse plate, if the supporting steel beam has been installed in the warehouse, the top warehouse plate and the supporting steel beam shall be fixed with pull rivets during the installation of each warehouse plate, and each top warehouse plate shall be riveted in two rows; If the lifting point type is adopted, the installation and construction of the lifting layout shall be realized before the installation and construction of the top silo plate, so as to ensure that each lifting point can be installed at the same time during the installation of the top silo plate; The lifting point shall ensure that there are at least two points along the width direction of each warehouse plate.


ChenandegaProfessional cold storage installationStatistics



For the flushing (thawing) drainage pipe in the cold room with different temperature, an exhaust valve equipment shall be set before connecting the flushing (thawing) drainage pipe.Fix the wires of electrical components with binding wires.The cooking materials and foods refrigerated in the quick-frozen warehouse contain a certain amount of fat, protein and starch. The existence of these nutrients will make molds and bacteria multiply and grow in large numbers. In order to do a good job in the hygienic management of cold areas and ensure the refrigeration quality of food and cooking raw materials, it is necessary to carry out the hygienic disinfection of cold areas regularly.market,Disadvantages of multi-layer cold storage: the vertical transportation volume of the warehouse is large, and the goods in and out and operation management are not as convenient as single-layer cold storage; With the development of the floor load capacity, the floor area ratio of each cold room is low; When the multi-storey cold storage is built on the foundation with poor ground resistance, the foundation construction is complex. High cost; When prefabricated components are used, large construction equipment is required and the construction period is long.Proper protective measures shall be taken during transportation to prevent plate from being strangled and scratched.The efficiency of the compressor is low, and the refrigerating capacity can not meet the load requirements of the warehouse: due to the long-term operation of the compressor,ChenandegaCold storage professional installation, the cylinder sleeve, ring and other parts are seriously worn the long-term cold storage installation, installation, construction, fruit preservation, medical cold storage and other brand products, the designated products are complete, the quality is guaranteed, and the sealing performance will be reduced accordingly with the increase of the matching clearance, The gas transmission coefficient of the compressor will also be reduced, and the refrigeration capacity will be reduced. When the refrigerating capacity is less than the heat load of the warehouse, and those with very low gasification temperature are used as coolant to evaporate under low pressure and mechanical conditions, so as to absorb the heat in the warehouse, so as to achieve the purpose of cooling and reduction.system,Installation of refrigeration equipment. The refrigeration system of the cold storage includes evaporator and units outside the cold storage. All equipment shall be installed in accordance with the construction specifications,ChenandegaCold storage and fresh storage, and corresponding protection measures shall be taken for the installed equipment.For those large-scale fresh-keeping warehouse wholesalers, if the equipment fails due to long-term neglect of maintenance, the loss can not be ignored. Therefore, we should do a good job in the maintenance of fresh-keeping warehouse wholesalers in the process of daily use.Thermal insulation performance of thermal insulation materials for food cold storage the requirement of polyurethane thermal insulation materials for cold storage is thermal insulation performance, and the quality of thermal insulation performance cannot be observed before it is really put into use. It is too late to observe the difference between power consumption. In this large number of experimental tests, strict material selection is carried out in order to achieve this goal: using structural amine ether to reduce thermal conductivity and improve thermal insulation effect; Reduce the water content of various raw materials and formulas as much as possible to avoid deterioration of thermal insulation performance caused by water foaming; Polyether: the product of a large processed factory after strict postprocessing is compared with the polyether of small factory without postprocessing. The foam cell has high uniformity of foam pores and thin wall of foam holes, and its heat preservation performance is obviously better than that of ordinary foam with thick wall and big hole. The use of the tasteless amine catalyst can effectively adjust the balance between foaming and gel reaction, so that the interlayer skin of the sprayed coating is thinner, which is beneficial to the performance of the thermal insulation material of the cold storage. Ordinary polyester polyols are not used.Chenandega,The three-dimensional automatic cold storage adopts a computer, which can complete the loading, unloading and stacking in the storage, the control of storage temperature and the operation of refrigeration equipment.In order to ensure the safety of construction and cold storage operation, the span between the top storage plate supports (lifting points) shall comply with the following provisions: the polystyrene top storage plate (mm thick) has a very large span of M,ChenandegaInstallation of small cold storage, and the polyurethane top storage plate (mm thick) has a span of m.The equipment that needs to be installed in the warehouse and put into the warehouse shall be installed in place or placed in an appropriate position in the warehouse; The wall warehouse board shall be installed from the corner of the warehouse body and the professional cold warehouse shall be installed. The cold warehouse shall be installed. The cold warehouse shall be constructed. The fruit fresh-keeping cold warehouse and medical cold warehouse shall have high pressure rating, good waterproof performance, fire and high temperature resistance, strong overload capacity, corrosion resistance, radiation protection and long service life. The corner shall be temporarily fixed with . color plate angle steel; When installing each wall panel evenly apply two layers of foaming material on the joint surface of male and female groove, and apply one layer of foaming material when installing polystyrene wall panel. The blanking shall be uniform and continuous; After the wallboard is installed in place, pull rivets at the lap joint of the internal and external steel plates of the two wallboards for connection and fixation, the eccentric hook shall be loosened once before installation to ensure reliable locking during installation.

404 Not Found

404 Not Found


nginx

Related articles

ChenandegaProfessional cold storage installationWhat are the technical parameters

ChenandegaProfessional cold storage installationWhat are the technical parameters

ChenandegaCold storage of drugs,Airtight construction of quick freezing storehouse: the modified atm...

评论列表

258HP138990173
2024-01-14 07:58:52

I'm busy, I forgot, I'm sorry, what else can I say~~ This ChenandegaProfessional cold storage installation is really good, lucky enough.

938HP166090698
2024-01-14 08:29:37

Just received the goods, very good, ChenandegaProfessional cold storage installation great value for money! ! Come in the future!

391HP142030639
2024-01-14 08:38:39

After receiving the goods, I feel that the quality ChenandegaProfessional cold storage installation is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics company’s service attitude is very good, and the delivery speed is very fast. In general, this This is a very satisfying purchase, thank you to the seller.

535HP136858825
2024-01-14 08:34:38

I think it’s pretty good. When I bought it, I saw the comments in the comments and I bought it. When I saw the shipment, I was very excited. After ChenandegaProfessional cold storage installation arrived, I was excited and tried it with anticipation, and the result was pretty good! And the customer service lady is also very nice and polite. The customer service lady also answered my questions in seconds, haha, I will repurchase next time.

632HP195506591
2024-01-14 08:33:49

ChenandegaProfessional cold storage installation It can be said to be top-notch, and the details are perfect.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。