NangongProduction of simple lifting cargo elevatorsThree basic points of homework

2024-01-05 00:30:22
779HP136589660Building materials80

Unscrew the screw on the dust-proof hole outside the flange of the elevator, adjust the PCS system ring to align the side hole with the dust-proof hole, and tighten the inner hexagon. After that, we need to check the foundation to see if there is any water accumulation, and check whether the grounding system meets the requirements. We also need to check how the structural bolts of the frame are fastened and whether there are any cracks in the welds. We need to follow the instructions to set it up. In mechanical transmission, it can be divided into two types: open type and closed type. Of course, the lift also has a lot of safety equipment.Nangong, which is simple and easy to operate. The models are divided into fixed and mobile forks, supermarket retail merchandise placement, scratches, small rocks on the driving tires, there may also be a peeling paint spot, and a small rust will appear after a long time. Because most of these scars are small, they are easy to ignore. Therefore, check regularly, the engine compartment cover and its surroundings, and once found, go to a professional beauty shop for processing.Palpala,NangongWorkshop lifting cargo elevator,Secondly there must be no dirt on the friction surface. If there is dirt, it needs to be washed off with gasoline or thinner; the gear box, gearbox, external gear and other parts of the equipment and the hydraulic oil must be in accordance with the requirements in the table; Correctly maintain the hydraulic guide rail lift. Regularly check whether the wire ropes in each part are broken or loose. If this phenomenon is found,NangongRail freight elevator, replace them in time. If there is any looseness it should be tightened in time. The connecting bolts of the equipment should be checked for tightness when the body is under pressure. All connecting shafts should be equipped with cotter pins; check whether each mechanism is operating normally, whether there is noise or failure , to eliminate all faults in a timely manner; when installing, dismantling and adjusting the slewing mechanism of the equipment, and the appropriate meshing gap; conduct a comprehensive inspection of the equipment regularly whether the wires and cables are If there is damage, whether the motor is overheated, replace it in time and continue to run after troubleshooting; ensure that the bearings of the motor, each box, distribution box and brushes must be kept clean, and the travel switch points of each safety device must be safe and reliable.Brake operators of various mechanisms on the equipment should regularly check and adjust the gap between the brake shoe and the brake wheel to ensure flexibility and reliability. Long-term promotion of freight elevator factory, old brand,Nangong8-meter cargo elevator, price advantage, quality guaranteed!In addition, during installation it is strictly forbidden to use hammers, etc. to prevent damage to bearings or gears due to excessive axial force or radial force. Be sure to tighten the mounting bolts before tightening the force bolts. Before installation, clean the anti-rust oil on the motor input shaft, the positioning boss and the connection parts of the elevator with gasoline or zinc and sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, and to prevent unnecessary wear and tear.


NangongProduction of simple lifting cargo elevatorsThree basic points of homework



The hydraulic lifting platform is mainly the pressure transmission of hydraulic oil to realize the lifting function. Its scissor mechanical structure makes the lift stable, and the wide operating platform and high carrying capacity make the high-altitude operation wide and suitable for many people work at the same time. It makes high-altitude operations efficient and secure.It is easy for the chassis parts to cause oil deterioration in the process of wading especially in the steering, transmission and other systems, the chassis should be disassembled and inspected. When the elevator enters the water, everyone must pay attention to it and need to check clearly. The point must not be ignored.Before using the aerial work platform, it is necessary to confirm whether the outriggers are well supported, refer to the level beads on the equipment to judge and debug, and then proceed with the operation; the rollers and slideways confirm whether the roller slideways of the hydraulic lifting platform are dry, and if there is When drying the site, an appropriate amount of butter should be added to ensure the smoothness during operation and to avoid head-to-head wear between mechanical parts.Executive standard,The load of this series of products is divided into . to . tons, and can also be customized according to user requirements, with a load of up to tons.Safety performance: The lifting structure is made of high-strength manganese steel rectangular tube, and the scissor-type mechanical mechanism is easy to maintain, with strong stability and high carrying capacity. The maximum lifting height is about meters, and the maximum load is about tons. .Precautions for elevator installation Keep the access road of the external construction elevator smooth and have enough parking space for equipment. When it is necessary to use a steam crane for auxiliary installation, it should be fully considered whether the site environment meets the operating conditions of the steam crane.


NangongProduction of simple lifting cargo elevatorsThree basic points of homework



Check the limit switch to see if all the limit switches are loose. If so, please tighten them. Pay special attention to the ultra-high protection stroke of the hydraulic lifting platform to avoid accidents caused by the equipment exceeding the high safety height; check the pins (ear pins and center pins) Check whether the nuts, nuts, screws, etc. are loose, if any, should be reinforced immediately; ensure that the hydraulic lifting platform rises and falls smoothly; outriggers (for high-altitude operating platform)For more, please check,Before using the aerial work platform, it is necessary to confirm whether the outriggers are well supported, refer to the level beads on the equipment to judge and debug, and then proceed with the operation; the rollers and slideways confirm whether the roller slideways of the hydraulic lifting platform are dry, and if there is When drying the site, an appropriate amount of butter should be added to ensure the smoothness during operation and to avoid head-to-head wear between mechanical parts.The load capacity of the goods and the tonnage of the goods transported at one time also affect the lifting speed. Reaching the excellent value of the lifting platform for transporting goods is the guarantee of speed. If the goods are too heavy, the speed will be affected. If the goods are too light, the normal delivery time will also be affected.The safety device of the guide rail hydraulic lifting platform The mechanical part of the guide rail hydraulic lifting platform mainly includes the hydraulic system and the mechanical device.Nangong,The wrong connection of the motor of the elevator When a coil, coil group or one-phase winding is reversed, it will cause a serious imbalance in the three-phase current and cause the winding to overheat.It is strictly forbidden to switch the electric control switch with wet hands. Many people tend to ignore this detail. Although the safety voltage of the hydraulic lifting platform is below V, if you touch the power supply with your hands, it may cause lifting failure in light cases, or electric shock accidents in severe cases.The wrong connection of the motor of the elevator When a coil, coil group or one-phase winding is reversed, it will cause a serious imbalance in the three-phase current and cause the winding to overheat.


404 Not Found

404 Not Found


nginx

Related articles

AjakshawGuide rail hydraulic lifting cargo elevatorCost support is high

AjakshawGuide rail hydraulic lifting cargo elevatorCost support is high

What is the new price of fixed lifts? Fixed lifts are currently very popular in the market. Due to d...

ComayaguaStainless steel heat exchange tubeProfessional custom

ComayaguaStainless steel heat exchange tubeProfessional custom

Continuous casting shall be adopted for stainless steel pipe fittings, so as to improve the comprehe...

Tulaba304 stainless steel plateIntroduction to usage specifications

Tulaba304 stainless steel plateIntroduction to usage specifications

In view of the current overall price difference, the local copper bar price continued to rise at a h...

Nostalier201 stainless steel plateAll employees

Nostalier201 stainless steel plateAll employees

The price of tube billets was adjusted and lowered mainly due to the production restriction of envir...

RaleighCold rolled stainless steel coilDoes continuous development and innovation have a big impact?

RaleighCold rolled stainless steel coilDoes continuous development and innovation have a big impact?

Voids, etc., atom diffusion becomes easier, dislocations will be generated in the material. Under th...

MoreliaHow many inches is welded pipe 273How to deal with technical service contracts

MoreliaHow many inches is welded pipe 273How to deal with technical service contracts

I-beam is mainly divided into ordinary I-beam, light I-beam and wide flange I-beam. According to the...

评论列表

78HP121928405
2024-01-05 08:15:23

After receiving the goods, I feel that the quality NangongProduction of simple lifting cargo elevators is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics company’s service attitude is very good, and the delivery speed is very fast. In general, this This is a very satisfying purchase, thank you to the seller.

530HP141750488
2024-01-05 07:59:23

The packaging NangongProduction of simple lifting cargo elevators looks very good, the packaging is very careful, I believe the goods must be very good, thank you! Good value, huh, come again next time.

258HP138990173
2024-01-05 07:43:04

NangongProduction of simple lifting cargo elevatorsHow much is the best price, and I will give you a comment, can NangongProduction of simple lifting cargo elevators be cheaper?

881HP198728332
2024-01-05 08:32:20

When NangongProduction of simple lifting cargo elevators offer discount points for activities, contact me when there are discounts

965HP113924865
2024-01-05 08:57:29

I’ve been too busy lately, it’s too late to confirm, NangongProduction of simple lifting cargo elevators is very good, like the boss.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。