2022-04-28 07:36:23Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method,SanheSteel pipe, double liquid silicification method, aerated silicification method and electric double liquid silicification method.Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer old brand, the pipe core and the outer wall of the pipe shall be washed clean.
Push the rock powder and sundries that are not washed,SanheSeamless pipe, remain at the hole bottom, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.Compared with sleeve valve pipe grouting method, the common disadvantages of grouting pipe grouting method,SanheGrouting pipe, flower pipe grouting method and drill pipe grouting method are that it is easy to emit slurry along the pipe wall and the grouting layering effect is poor. These disadvantages are particularly prominent when using slurry with good fluidity and long initial setting time; The utility model has the advantages of simple equipment and process good flexibility, fast construction speed, and is more suitable for situations requiring rapid response.SanheGrouting pipeJinjiu may have a small rise, a small earthquake and a small fall,2022-04-2807:38:28Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.
The secondary grouting pipe can only be grouted once and cannot be reused.After the grouting hole is drilled, install and lower the grouting pipe, grout stop plug, mixer and other facilities in the hole.Sanhe,Greenland,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.