GizaWhere is the cold storage project installedWhat are the pre assembly methods on site

2022-10-24 00:41:31
632HP195506591energy241

Technical assurance measures for the installation of cold storage: during production in the production workshop,GizaInstallation of freezer, the production shall be carried out in strict accordance with the operation rules specified in ISO quality operation, self inspection and inspection application shall be carried out to ensure that the factory pass rate is, and unqualified products are not allowed to leave the factory.Commissioning cold storage. After all parts of the cold storage are installed and connected, the cold storage can be started for cold storage commissioning. According to the needs of customers, adjust the value of the cold storage, the cold storage can reach the predetermined temperature, the cooling speed and the operation of the cold storage are normal, and the cold storage can be delivered for use. The cold storage installation unit shall also provide the cold storage user with training on cold storage use and management knowledge, as well as some after-sales training.Giza,The high temperature and high pressure of the compressor of the wholesale condenser of the fresh-keeping warehouse as the heat sink and heat exchanger needs to be dissipated and heat exchanged through the condenser, mainly to condense the refrigerant. The high-pressure temperature can reach Baidu, and the temperature will drop to degrees after condensation.When the cold storage is built, the diffusion of water vapor and the infiltration of air shall be prevented. When outdoor air invades, it will not only increase the cold consumption of the cold storage, but also bring moisture into the warehouse. Moisture condensation will damp the heat insulation structure and freeze and damage the cold storage structure. Therefore, it is necessary to set moisture-proof and heat insulation layer, professional cold storage installation, cold storage construction, fruit fresh-keeping cold storage, medical cold storage and other products, which have a complete variety, sell well at home and abroad, and have a long service life! Products lead the wire industry. Welcome to inquire, so that the cold storage building has good sealing moisture-proof and steam isolation performance.Astacus,The assembled cold storage body often adopts double-sided color steel plate of polyurethane thermal insulation material, which has excellent thermal insulation performance, storage and circulation effect and reduces operation energy consumption. Of course, more important is the choice of refrigeration system. For example, at present, the refrigeration system of fluorine refrigerant is still the mainstream, but when selecting the type and power of cooling equipment, it is necessary to calculate the data for the installation of cold storage, and then make a high-quality choice.Cold storage has good water tightness. Polyurethane rigid foam has low water absorption, disconnected and closed porosity of more than %. It is a dense microporous foam material foam holes, which is more dense than air surface, and is not easy to permeate. It belongs to hydrophobic materials.The spacing of pull rivets at inner and outer corners is mm and mm respectively; After the polystyrene library is installed, the wall panel joints shall be evenly sealed and decorated with silicone sealant.


GizaWhere is the cold storage project installedWhat are the pre assembly methods on site



The spacing of pull rivets at inner and outer corners is mm and mm respectively; After the polystyrene library is installed, the wall panel joints shall be evenly sealed and decorated with silicone sealant.Precautions for fruit delivery: it is the same as warehousing. It should be gradually adapted during delivery to avoid condensation on the fruit surface dark color, affecting the taste and causing decay. The temperature should be ~ ℃ higher than the fruit temperature each time, and the relative humidity should be % ~ %, When the temperature rises to ~ ℃ different from the external temperature, it can be delivered from the warehouse.Thermal insulation rigid polyurethane has low thermal conductivity and good thermal performance. When the density of rigid polyurethane is ~ kg / m, which is the lowest among all thermal insulation materials at present.Quality department,Frozen and refrigerated storage began to change to shelf and pallet storage to complete the goods according to & ldquo; First in first out & rdquo; It is conducive to improve the quality of commodity storage and reduce loss.Artificial refrigeration keeps the room at a constant temperature. The walls, floors and flat roofs of large cold storages are laid with thermal insulation materials with a certain thickness to reduce the incoming heat from the outside. In order to reduce the absorption of solar radiation, the surface of the external wall of the cold storage is painted white or light color.What should be considered in building a cold storage? In these aspects, meets the needs of refrigeration technology, convenient production, energy saving and cost reduction. What problems should be considered in the construction of food cold storage?


GizaWhere is the cold storage project installedWhat are the pre assembly methods on site



Generally, in the actual operation of the refrigeration system, because the temperature conditions are constantly changing, only by relying on the careful operation of the cold storage management personnel and accurately adjusting the operation of the refrigeration equipment of the cold storage, can the refrigeration system always be in the ideal working state and achieve the effect of energy saving.Quality assurance,The machine room of ammonia refrigeration system shall be equipped with exhaust assembly; The exhaust fan shall adopt anti motor. When the power supply is cut off due to unexpected refrigeration, vibration will continue to cause loosening or cracking of the upper connecting pipe of the generator unit. If abnormal noise is found during the whole operation of the equipment, it shall be shut down for inspection before operation. The maintenance functions of the refrigeration unit have been set and do not need to be adjusted.Install the library body. Generally, the warehouse body can be divided into small warehouse body and large warehouse body. The small warehouse body is basically a combined cold storage assembled with warehouse plate. The large warehouse body is mostly a civil cold storage. The assembled or constructed warehouse body is generally required to be flat, compact and solid without hollow feeling, load-bearing antifreeze, moisture-proof, etc.Giza,During the installation of long-span top warehouse plate, if the supporting steel beam has been installed in the warehouse, the top warehouse plate and the supporting steel beam shall be fixed with pull rivets during the installation of each warehouse plate, and each top warehouse plate shall be riveted in two rows; If the lifting point type is adopted, the installation and construction of the lifting layout shall be realized before the installation and construction of the top silo plate, so as to ensure that each lifting point can be installed at the same time during the installation of the top silo plate; The lifting point shall ensure that there are at least two points along the width direction of each warehouse plate.Relative humidity maintenance of quick-frozen warehouse: humidification of quick-frozen warehouse is very important,GizaPrice of medical cold storage, from centrifugal humidification to high-pressure micro fog humidification, gas-water mixed humidification, to the current ultrasonic humidifier. The utility model has the advantages of small particles, uniform humidification, no freezing and blocking,GizaWhich is a good cold storage installation manufacturer, and no dirty blocking. The air conditioning humidifier we produce is specially designed for all kinds of vegetable and fruit quick freezing warehouses, which is essentially different from other humidifiers in the market: fully closed circulation, that is, take the gas in the warehouse, return to the warehouse through the humidifier and isolate it from the outside air.The butt joint between the top warehouse plate and the end of the top warehouse plate shall be treated to prevent air leakage and cold running. After all the top warehouse plates are installed, the butt joint shall be filled with foaming material, and the mm wide color steel plate shall be sealed at the butt joint with pull riveting.

404 Not Found

404 Not Found


nginx

Related articles

GizaWhere is the cold storage project installedProduction supply

GizaWhere is the cold storage project installedProduction supply

As a coolant, make it evaporate under low pressure and mechanical conditions to absorb the heat in t...

评论列表

35HP162657470
2022-10-24 07:49:35

After receiving the goods, I feel that the quality GizaWhere is the cold storage project installed is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics company’s service attitude is very good, and the delivery speed is very fast. In general, this This is a very satisfying purchase, thank you to the seller.

409HP184720764
2022-10-24 08:31:34

After looking for the GizaWhere is the cold storage project installed from your family for a long time, I mustered up the courage and the quality of the inspection was very good.

256HP158312377
2022-10-24 08:11:21

GizaWhere is the cold storage project installed Give me a discount next time, I wish you a lot of money

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。