San Mateo iktatan500kW dry type transformerApplication in the protection industry

2022-08-08 13:09:05

Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.San Mateo iktatan,In fact, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.How much is the power transformerBenemerita-de-San-Cristobal,The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, voltage transformer, automobile relay, AC, etc.) operates normally. According to the AC current,San Mateo iktatanInspection items of oil immersed transformer, the winding transformer core will send out a symmetrical rhythm and a certain tone & ldquo; Buzz buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.management,The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Common problems of tap changer of power transformer


San Mateo iktatan500kW dry type transformerApplication in the protection industry



If you want to check the activated carbon fiber for the hanging cover first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, center of gravity and Jack. After everything is normal,San Mateo iktatanRecycling of old box transformer, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.details,Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.San Mateo iktatan,The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.In the case of dry-type transformer operation there is more noise,San Mateo iktatanOil immersed transformer capacity, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.

404 Not Found

404 Not Found


nginx

Related articles

San Mateo iktatan500kW dry type transformerDistortion problem

San Mateo iktatan500kW dry type transformerDistortion problem

Power transformerOn load commissioning:San Mateo iktatan,In fact, apart from the application of the...

评论列表

416HP186602172
2022-08-08 14:59:06

The logistics is very fast, look forward to working together again

409HP184720764
2022-08-08 14:57:51

Haha, San Mateo iktatan500kW dry type transformer received! It's too late to confirm, sorry, the boss is very fashionable!

984HP143755493
2022-08-08 15:02:07

The first time I found what I wanted San Mateo iktatan500kW dry type transformer, I was in a good mood! Boss, come on, I hope to continue to make good products.

263HP145816628
2022-08-08 13:44:58

Let me talk about the quality of the goods first: San Mateo iktatan500kW dry type transformer Overall it is good, and the packaging is tight. Let’s talk about business services: Like it. Last review express: delivery is fast. The other is to thank the store for discounts, after all, cheap and good products are more real. I hope that the store will give more discounts and notify old customers in time to promote repurchase. I wish business prosperous.

709HP180518493
2022-08-08 14:43:07

San Mateo iktatan500kW dry type transformer The quality is very good, I bought it for the second time, the goods are good, the boss is very good

632HP195506591
2022-08-08 14:42:00

Your company San Mateo iktatan500kW dry type transformer has a very good service attitude, thank you, and like you.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。