Abu DhakaGrouting flower tubeWhat points should be paid attention to in seasonal work

2024-03-29 04:40:27
965HP113924865Building materials60
which can be distinguished from different angles, including the following. According to the type of reinforcement of the grouting pipe, the grouting pipe of parallel reinforcement (wire) bundle of the grouting pipe, one grouting pipe is generally used to anchor one reinforcement. For tendons and steel strands, a grouting pipe must anchor several steel bars or steel strands at the same time which are often arranged in a ring or circle, or in a rectangle. Obviously, the form and structure of grouting pipe will also be different. According to the principle of grouting pipe and transmitting pretension, it can be divided into grouting pipe relying on bearing pressure, grouting pipe relying on friction and grouting pipe relying on adhesion.Abu Dhaka, The system allows grouting at relatively low pressure.The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, and the size matches the flange of the Christmas tree wellhead.Phongsali,How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place, and the grouting pipe device in Hainan shall be kept clean when pouring concrete.At the same time, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.Advantages: It is connected with special hydraulic tongs, does not require preparations outside the construction site, does not require any equipment, is convenient and fast ( times faster than the traditional welding method) is simple to fix the grouting pipe to the reinforcement cage, and is not affected by the bad weather.


Abu DhakaGrouting flower tubeWhat points should be paid attention to in seasonal work



The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.In addition, the water corrosion test results of the grouting material simulating the fresh water erosion environment show that the strength of the stone body of the grouting material does not lose under the condition of water corrosion for days, while the strength loss of the cement water glass grouting material reaches %, which shows that the water corrosion resistance durability of the water glass industrial waste two liquid grouting material is better than that of the cement water glass two liquid grouting material []. The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface.Process inspection, It is safe and does not need to be welded on site.Disposal method: the grouting pipe shall be shortened according to the specification. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.


Abu DhakaGrouting flower tubeWhat points should be paid attention to in seasonal work



The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, molding, punching, stretching, shaping, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight, high strength, isotropy, and antistatic,Abu DhakaGrouting small conduit,Abu DhakaTunnel combined hollow anchor manufacturer, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.offer,The glass fiber grouting pipe has the characteristics of easy construction, high temperature resistance, corrosion resistance, low elongation, high elastic modulus, no long-term creep, meeting the requirements of environmental protection, and has high tensile strength in the transverse and longitudinal directions. The strength to weight ratio of glass fiber is larger than that of steel, and the tensile strength can reach kn / m which provides sufficient strength to prevent reflection cracks. When it breaks, its elongation is less than %, it has high deformation resistance and good compatibility with asphalt mixture. The installation will not affect the characteristics of the building grouting pipe; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; If there is no leakage, grouting is not allowed. The key construction process flow of grouting pipe installation is as follows: table formwork processing installation - grouting pipe processing - spring reinforcement framework, mesh binding - grouting pipe and installation of embedded reserved side formwork installation - process acceptance - concrete pouring - concrete curing - m data thickness to ensure the integrity of the table formwork, the steel plate joint weld shall be uniform.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.Abu Dhaka,The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass. The grouting pipe is used to pad the bottom of the horseshoe, change the cooperation specification of the mold, and adjust the cooperation space between the lower tire and the horseshoe.The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness.


404 Not Found

404 Not Found


nginx

Related articles

Calle Blancos Hotel40Cr seamless pipe factoryPotential development

Calle Blancos Hotel40Cr seamless pipe factoryPotential development

I-beam can only be used for beam, while H-beam can be used for load-bearing column of structure.Whet...

JacksonvillePrice of stainless steel pipeWhat are the matters needing attention in installation

JacksonvillePrice of stainless steel pipeWhat are the matters needing attention in installation

AUSTENITIC FERRITIC duplex stainless steel on the basis of austenitic stainless steel, appropriately...

FajadoWelding technology of galvanized square pipeHow to maintain 191029

FajadoWelding technology of galvanized square pipeHow to maintain 191029

as the name suggests, is to compact the bending. During real bending, the inner and outer rollers a...

AndorraHow much is No. 14 I-beam per tonGrowth trend

AndorraHow much is No. 14 I-beam per tonGrowth trend

After determining the reasonable pickling agent and polishing solution,AndorraHow much is 120 I-beam...

Kansas CityHow much is the waste reinforcement at the construction siteNew product

Kansas CityHow much is the waste reinforcement at the construction siteNew product

What are the uses of I-beam? The defects can be removed by grinding with sand wheel, but the remaini...

Vicente nobleHigh pressure alloy pipeWhat are the levels of homework?

Vicente nobleHigh pressure alloy pipeWhat are the levels of homework?

Its heat sealing effect is remarkable. It can be directly buried immediately, but also reduce consum...

评论列表

695HP135175170
2024-03-29 12:25:03

I will buy it in the future Abu DhakaGrouting flower tube and I will come to you again. Thank you boss and send a good comment. I love you boss. Thank you!

47HP158935852
2024-03-29 11:48:23

Haha, Abu DhakaGrouting flower tube received! It's too late to confirm, sorry, the boss is very fashionable!

391HP142030639
2024-03-29 12:41:08

Abu DhakaGrouting flower tubeHow much is it, can I transfer the goods?

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。