idiot35kV energy saving power transformerAn important means to prevent or delay wear

2022-05-22 00:10:33

When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken if you work again, turn on the photo flash when it's light,idiotPower transformer price, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.idiot,The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as mA analog quantity. If it is to be far away (the distance can reach m, the electronic computer can be equipped with an electronic computer socket, and transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt thermistor sensor, so as to further improve the stability of the temperature maintenance system software.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Chakowitz,Dry type transformer companyThe representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.Falling foreign matters and piercing


idiot35kV energy saving power transformerAn important means to prevent or delay wear



Due to careless transportation of the transformer and the thin high-voltage conductor,idiotDry type transformer sample, the transformer was disconnected by vibration (but there was no grounding device).The efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the smaller the output power, the lower the efficiency.The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?Which one is better,Analysis of common faults of oil immersed transformer:When sampling in bulk gasoline barrels samples shall be selected according to % of the number of gasoline barrels, but not less than barrels. When sampling in batches of small and medium-sized pails or bottles, it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.


idiot35kV energy saving power transformerAn important means to prevent or delay wear



The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person,idiotOil immersed transformer temperature, weather conditions and other materials of the oil sample.consumption,After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.The rate of transformer is: n = P / pxo%, that is, when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore, the load of transformer is: = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about %, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.idiot,In specific daily life, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?When the transformer is put into operation, if the tap changer is not in time a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.Power transformer plant

404 Not Found

404 Not Found


nginx

Related articles

AsperniVertical obstacle free lifting platformSignificance of pollution control

AsperniVertical obstacle free lifting platformSignificance of pollution control

During the use of elevators, some elevator users seek temporary workers or unqualified companies for...

AlajuelaState Grid transformerThe manufacturer teaches you how to improve work efficiency

AlajuelaState Grid transformerThe manufacturer teaches you how to improve work efficiency

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt an...

DublinMobile lifting hydraulic boarding bridgeQuality level

DublinMobile lifting hydraulic boarding bridgeQuality level

Looking back at the normal logistics industry, the potential demand for material handling equipment...

MILUSChain hydraulic lifting platformSelection of storage place

MILUSChain hydraulic lifting platformSelection of storage place

Regularly check the connection of each ministry. If there is a loose, it should be tightened. The co...

Xie DezeWorkshop second floor elevatorWhat knowledge is worth learning

Xie DezeWorkshop second floor elevatorWhat knowledge is worth learning

The main categories of aluminum alloy elevators in the Chinese market are based on the structural fo...

NaplesLogistics boarding bridgeWhat are the key points of the design plan for the effective number of turns

NaplesLogistics boarding bridgeWhat are the key points of the design plan for the effective number of turns

Operation degree: There are two types of operations that can be used to raise and lower the boarding...

评论列表

35HP162657470
2022-05-22 08:08:33

I’ve been too busy lately, the confirmation is late, the quality is good, idiot35kV energy saving power transformer genuine, good quality and cheap, haha.

409HP184720764
2022-05-22 07:16:09

Cooperation with you is really good, idiot35kV energy saving power transformer good quality, come to our company again if you have time.

984HP143755493
2022-05-22 08:21:51

The first time I found what I wanted idiot35kV energy saving power transformer, I was in a good mood! Boss, come on, I hope to continue to make good products.

122HP117294921
2022-05-22 08:16:46

I finally waited until I bought it idiot35kV energy saving power transformer. At first, I was still wondering whether to buy it. I liked it a little bit. I was a little scared to read the comments. I was afraid that the quality was not good. It was not a genuine product. It was a bit different from the picture. However, everything is wrong, the things are good, authentic, the boss is good, and the logistics are good.

709HP180518493
2022-05-22 08:50:11

I'm quite satisfied, and the quality and workmanship are even worse. Look back and introduce to friends

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。