k-girls Construction and installation cost of cold storageInject fresh blood
2022-09-10 01:08:56The installation of top warehouse plate should be carried out alternately with the installation of wall plate, and the wall plate should leave a gap for withdrawing construction equipment; During the installation of the top warehouse plate the end steel sheet at the overlap with the wall plate shall be disconnected for mm to prevent the cold bridge from running cold; Two layers of foaming materials shall be evenly and continuously punched on the joint surface between each top warehouse plate. Rivets shall be pulled and fixed at the internal and external lap joints of the steel plate, and the rivet spacing shall be mm; According to the design drawings, if there are supporting beams, columns and supporting steel frames in the warehouse, the setting out and positioning shall be carried out and accurate and clear marks shall be made according to the requirements of the design drawings; Weld or install the support beam, column support steel frame, etc., and the welded junction shall be moisture-proof and treated according to the drawing requirements.The exhaust temperature of the compressor in the fresh-keeping warehouse can be read out from the thermometer on the exhaust pipeline. It is related to the adiabatic index, compression ratio and suction temperature of refrigerant. The higher the suction temperature, the greater the compression ratio, the higher the exhaust temperature, and vice versa.Install the library body. Generally, the warehouse body can be divided into small warehouse body and large warehouse body. The small warehouse body is basically a combined cold storage assembled with warehouse plate. The large warehouse body is mostly a civil cold storage. The assembled or constructed warehouse body is generally required to be flat, compact and solid, without hollow feeling, load-bearing, antifreeze, moisture-proof, etc.Affordable price,In fact, there are some unique installation skills when installing the cold storage? The cold storage installed according to these skills is often short in both effect and quality, and the specific installation skills of the cold storage will also make some relatively detailed introduction for you in the following article. When installing the cold storage, you should install it from the corner first. Later, according to the height of the cold storage,k-girls Cold storage installation Co., Ltd,k-girls Precautions for medical cold storage, and tighten the angle iron parts until there is a hole on the insulation boardCore tip: in the cold storage project, only with sufficient cold storage installation skills can we ensure that the cold storage is more energy-saving and power-saving after installation, and is not prone to failure, convenient use and management and long service life.The structure of contemporary cold storage is in the development trend of prefabricated building cold storage. It is made into prefabricated components of cold storage including steam barrier and heat insulation plate to ensure on-site assembly. Its advantage is that the project construction is convenient, rapid and movable, but the project cost is relatively high.
Reasonable space: the power consumption of the cold storage is calculated according to the cold consumption of the cold storage, which usually includes two parts: the cold consumption during cargo cooling and refrigeration; It is the cooling consumption of the refrigeration room itself and operation management.Product line, use a hammer to pad the wood on the polyurethane warehouse board between the two warehouse boards so as to make the boards closely close to each other. Two sets of connecting pieces shall be wedged between the wall panel and the wall panel, and the two sets of connecting pieces shall be fixed on the upper, outer and lower sides of the gap between the wall panel and the wall panel respectively. The lower connecting piece shall be as close as possible to the lower side, so that the post cast concrete can cover the connecting piece. After the gap between the plate and the plate ground is wedged with a connector, it shall be about mm wide. If it does not meet the requirements, remove the plate, trim the plate edge, and then reinstall it to make the plate joint meet the requirements. When fixing the adapter, pay attention to fix the two parts of the adapter on the edges of the convex and concave library plates respectively, and fix them with rivets. The spacing of the adapter should be able to tension the two library plates. When wedging the wedge iron, the hammer shall be perpendicular to the wedge iron to prevent damaging the warehouse plate. The ground wedge iron at the upper and lower parts shall be wedged at the same time, and the wedge iron shall be fixed with rivets.Conduit installation shall be beautiful and firm.Other aspects: in the design process of food cold storage, it is also necessary to consider the cooperation between the cold storage and on-site fire fighting, ventilation, water and electricity systems. It should meet the requirements of safety, the drainage problem must be considered, and the following points should be paid attention to during redesign and installation.k-girls ,Connect the refrigeration system. Wires and copper pipes shall be used to connect the refrigeration unit, electric control system and other components of the cold storage. The connecting pipes shall be closely connected, and corresponding thermal insulation and protection measures shall be taken.It is required to set up a special tally room (area), and the temperature of the tally area is usually controlled at ~ + ℃.For the ground insulation of large cold storage, we can that the ground insulation of medium-sized cold storage is more complex than that of small cold storage, and the ground insulation operation of large cold storage with larger warehouse area will be more complex. The common operations are as follows: first lay the ventilation pipe to prevent the ground from freezing drum cracking,k-girls How much is the general cold storage installation, then lay the XPS extruded plate (staggered laying is required when laying the extruded plate), then lay the moisture-proof and vapor barrier on the upper and lower sides of the extruded plate, and then make the emery floor or epoxy floor according to the requirements. Among them, the XPS extruded plate is also laid according to the warehouse temperature. For example, the XPS extruded plate with thickness of ~ mm needs to be laid in the general low-temperature cold storage, while the XPS extruded plate with thickness of ~ mm can be laid in the high-temperature cold storage.