which is mainly composed of compressor, condenser, throttle valve and evaporation pipe. According to the way of evaporation pipe device, it can be divided into direct cooling and indirect cooling. Direct cooling the evaporation pipe is installed in the refrigerated warehouse. When the liquid coolant passes through the evaporation pipe it will directly absorb the heat in the warehouse and cool down.k-girls ,The ventilation device is adopted, which also produces heat exchange with the outside air, resulting in & amp; quot; Heat leakage & amp; quot;, Energy is wasted, so an air scrubber is required. Washing, amino, activated carbon, sieve etc.Cold storage has good fire and flame resistance. After adding flame retardant, polyurethane is a kind of flame retardant and self extinguishing material. If it is burned by fire, it can be carbonized, unlike flow burning and flashover like extruded board, which can effectively prevent fire spread. In particular, it can be closed as a whole after fire prevention treatment to form non combustible products.Quatre Bornes,When the cold storage is used for the first time or shut down for a long time, it is strictly prohibited to stack goods in the warehouse. The warehouse must be slowly reduced to the required temperature. For the low-temperature warehouse, it needs to be cooled in stages to avoid sudden changes in the temperature difference inside and outside the warehouse, resulting in the warehouse body.The construction of small cold storage is widely used in life, manufacturing industry, etc. since cold storage is so widely used, do you know cold storage? Especially the construction process and steps of cold storage. Understanding the construction process and steps of cold storage is helpful for all links of cold storage maintenance.Commissioning cold storage. After all parts of the cold storage are installed and connected, the cold storage can be started for cold storage commissioning. According to the needs of customers, adjust the value of the cold storage, the cold storage can reach the predetermined temperature, the cooling speed and the operation of the cold storage are normal, and the cold storage can be delivered for use. The cold storage installation unit shall also provide the cold storage user with training on cold storage use and management knowledge, as well as some after-sales training.


k-girls Construction and installation cost of cold storageInject fresh blood



The installation of top warehouse plate should be carried out alternately with the installation of wall plate, and the wall plate should leave a gap for withdrawing construction equipment; During the installation of the top warehouse plate the end steel sheet at the overlap with the wall plate shall be disconnected for mm to prevent the cold bridge from running cold; Two layers of foaming materials shall be evenly and continuously punched on the joint surface between each top warehouse plate. Rivets shall be pulled and fixed at the internal and external lap joints of the steel plate, and the rivet spacing shall be mm; According to the design drawings, if there are supporting beams, columns and supporting steel frames in the warehouse, the setting out and positioning shall be carried out and accurate and clear marks shall be made according to the requirements of the design drawings; Weld or install the support beam, column support steel frame, etc., and the welded junction shall be moisture-proof and treated according to the drawing requirements.The exhaust temperature of the compressor in the fresh-keeping warehouse can be read out from the thermometer on the exhaust pipeline. It is related to the adiabatic index, compression ratio and suction temperature of refrigerant. The higher the suction temperature, the greater the compression ratio, the higher the exhaust temperature, and vice versa.Install the library body. Generally, the warehouse body can be divided into small warehouse body and large warehouse body. The small warehouse body is basically a combined cold storage assembled with warehouse plate. The large warehouse body is mostly a civil cold storage. The assembled or constructed warehouse body is generally required to be flat, compact and solid, without hollow feeling, load-bearing, antifreeze, moisture-proof, etc.Affordable price,In fact, there are some unique installation skills when installing the cold storage? The cold storage installed according to these skills is often short in both effect and quality, and the specific installation skills of the cold storage will also make some relatively detailed introduction for you in the following article. When installing the cold storage, you should install it from the corner first. Later, according to the height of the cold storage,k-girls Cold storage installation Co., Ltd,k-girls Precautions for medical cold storage, and tighten the angle iron parts until there is a hole on the insulation boardCore tip: in the cold storage project, only with sufficient cold storage installation skills can we ensure that the cold storage is more energy-saving and power-saving after installation, and is not prone to failure, convenient use and management and long service life.The structure of contemporary cold storage is in the development trend of prefabricated building cold storage. It is made into prefabricated components of cold storage including steam barrier and heat insulation plate to ensure on-site assembly. Its advantage is that the project construction is convenient, rapid and movable, but the project cost is relatively high.


k-girls Construction and installation cost of cold storageInject fresh blood



Reasonable space: the power consumption of the cold storage is calculated according to the cold consumption of the cold storage, which usually includes two parts: the cold consumption during cargo cooling and refrigeration; It is the cooling consumption of the refrigeration room itself and operation management.Product line, use a hammer to pad the wood on the polyurethane warehouse board between the two warehouse boards so as to make the boards closely close to each other. Two sets of connecting pieces shall be wedged between the wall panel and the wall panel, and the two sets of connecting pieces shall be fixed on the upper, outer and lower sides of the gap between the wall panel and the wall panel respectively. The lower connecting piece shall be as close as possible to the lower side, so that the post cast concrete can cover the connecting piece. After the gap between the plate and the plate ground is wedged with a connector, it shall be about mm wide. If it does not meet the requirements, remove the plate, trim the plate edge, and then reinstall it to make the plate joint meet the requirements. When fixing the adapter, pay attention to fix the two parts of the adapter on the edges of the convex and concave library plates respectively, and fix them with rivets. The spacing of the adapter should be able to tension the two library plates. When wedging the wedge iron, the hammer shall be perpendicular to the wedge iron to prevent damaging the warehouse plate. The ground wedge iron at the upper and lower parts shall be wedged at the same time, and the wedge iron shall be fixed with rivets.Conduit installation shall be beautiful and firm.Other aspects: in the design process of food cold storage, it is also necessary to consider the cooperation between the cold storage and on-site fire fighting, ventilation, water and electricity systems. It should meet the requirements of safety, the drainage problem must be considered, and the following points should be paid attention to during redesign and installation.k-girls ,Connect the refrigeration system. Wires and copper pipes shall be used to connect the refrigeration unit, electric control system and other components of the cold storage. The connecting pipes shall be closely connected, and corresponding thermal insulation and protection measures shall be taken.It is required to set up a special tally room (area), and the temperature of the tally area is usually controlled at ~ + ℃.For the ground insulation of large cold storage, we can that the ground insulation of medium-sized cold storage is more complex than that of small cold storage, and the ground insulation operation of large cold storage with larger warehouse area will be more complex. The common operations are as follows: first lay the ventilation pipe to prevent the ground from freezing drum cracking,k-girls How much is the general cold storage installation, then lay the XPS extruded plate (staggered laying is required when laying the extruded plate), then lay the moisture-proof and vapor barrier on the upper and lower sides of the extruded plate, and then make the emery floor or epoxy floor according to the requirements. Among them, the XPS extruded plate is also laid according to the warehouse temperature. For example, the XPS extruded plate with thickness of ~ mm needs to be laid in the general low-temperature cold storage, while the XPS extruded plate with thickness of ~ mm can be laid in the high-temperature cold storage.

Related articles

GranbyCold storage installation enterpriseWhat acceptance work should be done

GranbyCold storage installation enterpriseWhat acceptance work should be done

For cold storage, it is very common in our production and life. Cold storage is very important for f...

AzkapozarkoInstallation price of fresh-keeping cold storageThe industry needs to be based on technical talents

AzkapozarkoInstallation price of fresh-keeping cold storageThe industry needs to be based on technical talents

Judge the operating sound of the compressor, cooling tower, compressor, fan and other equipment. In...

CorollaMedicine frozen warehouseReliable use

CorollaMedicine frozen warehouseReliable use

The quick-frozen warehouse is easy to load and unload. All the plates and walls of the quick-frozen...

Santa CruzUltra low temperature cold storage installation companyHow to improve the overall efficiency

Santa CruzUltra low temperature cold storage installation companyHow to improve the overall efficiency

During the installation of long-span top warehouse plate, if the supporting steel beam has been inst...

SeattleCold storage installation and maintenanceFour points are required in the application of

SeattleCold storage installation and maintenanceFour points are required in the application of

Install the electric control system. The electric control system of the cold storage mainly includes...

VegaWhich cold storage company is easy to installCurrent situation of the industry

VegaWhich cold storage company is easy to installCurrent situation of the industry

The cooking materials and foods refrigerated in the quick-frozen warehouse contain a certain amount...

评论列表

466HP159575805
2022-09-10 09:58:23

Haha, k-girls Construction and installation cost of cold storage received! It's too late to confirm, sorry, the boss is very fashionable!

416HP186602172
2022-09-10 09:49:47

k-girls Construction and installation cost of cold storage Very satisfied, good quality.

35HP162657470
2022-09-10 09:50:05

k-girls Construction and installation cost of cold storage The quality is very good, I bought it for the second time, the goods are good, the boss is very good

409HP184720764
2022-09-10 10:03:34

The first online purchase k-girls Construction and installation cost of cold storage. I use my personal experience to tell everyone that your service attitude is very good. The quality of the goods is also very good. I like you!

632HP195506591
2022-09-10 09:06:06

k-girls Construction and installation cost of cold storage Delivery is really fast, too efficient, the product has been received, give you a good comment.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。