DobrushDesign and installation of vegetable fresh-keeping cold storageQuality inspection method of

2024-03-10 02:25:54
632HP195506591energy61

Panel types of quick freezing warehouse: color plastic steel plate, stainless steel plate, etc.When the cold storage is used for the first time or shut down for a long time, it is strictly prohibited to stack goods in the warehouse. The warehouse must be slowly reduced to the required temperature. For the low-temperature warehouse, it needs to be cooled in stages to avoid sudden changes in the temperature difference inside and outside the warehouse, resulting in the warehouse body.Dobrush,Expensive, high machining precision of body parts; High noise during compressor operation; Screw compressor can only be used in medium and low pressure range, not in high-pressure occasions; Due to large fuel injection and complex oil treatment system, there are many auxiliary equipment of the unit.Cold storage is mainly used for frozen processing and storage of foodPitea,Precautions for purchase and shipment when using the medical cold storage project the speed must be strictly guaranteed during the purchase and shipment of products. If the temperature of the medical cold storage is about degrees, the opening time must be strictly within minutes. If the temperature of the medical cold storage is left and right degrees,DobrushConstruction and installation price of cold storage, the opening time can not be too high, strictly within minutes.The combined cold storage door starts frequently or does not start for a long time, or does not stop for a long time, or stops before the storage temperature reaches.Judge the operating sound of the compressor, and carefully listen to the operating sound of water pump, cooling tower, compressor, fan and other equipment. In case of abnormal sound, timely warranty is required, so as to avoid greater damage to the compressor due to untimely warranty.


DobrushDesign and installation of vegetable fresh-keeping cold storageQuality inspection method of



The new cold storage material is made of rigid polyurethane or polystyrene foam insulation sandwich panel, which is made by high pressure foaming process and can be made into various lengths and specifications to meet the different requirements of the users.The electrical contacts shall compress the wire connector and the main wire connector of the motor, which shall be clamped with a wire clamp, and tin shall be hung if necessary.Fault phenomenon: fan motor overload, fan deformation; Fan motor fault; Fan motor thermal relay fault (aging); Loose wiring; Cooler blocked; Large exhaust resistance. Cold storage fault phenomenon: dryer does not operate, compressor line is disconnected, fuse is blown, thermal relay acts, high voltage switch acts, compressor is locked, line is falsely connected or loose fault phenomenon: it stops in a short time after drying, ambient temperature is too high,DobrushHow much is the installation of cold storage per square meter, - precautions for floor installation of cold storage: the floor shall be installed flat, the uneven part shall be leveled with materials, and the locking hook between the plates shall be locked to ensure that the warehouse surface is flat without hollow feeling. (note that if this drainage system is installed outdoors in the north, the drainage pipe shall be insulated).The two sets of connectors between the cold storage shall be wedged tightly, and the two sets of connectors shall be fixed at the upper, outer and lower sides of the cracks in the cold storage respectively. The lower connector shall be as close as possible, so as to facilitate the use of concrete to cover the connector in the future.In fact, there are some unique installation skills when installing the cold storage? The cold storage installed according to these skills is often short in both effect and quality, and the specific installation skills of the cold storage will also make some relatively detailed introduction for you in the following article. When installing the cold storage, according to the height of the cold storage, make a hole in the middle of the insulation board, and tighten the angle iron parts until there is a hole on the insulation board


DobrushDesign and installation of vegetable fresh-keeping cold storageQuality inspection method of



The average service life of rigid polyurethane insulation structure with stable quality, long service life and high comprehensive cost performance can reach more than years under normal use and maintenance conditions. Under the normal service conditions during the service life of the structure it will not be affected by drying, or electrochemical corrosion,DobrushWhich is the best place to install cold storage equipment, as well as the growth of insects fungi or algae or rodents.Interpretation and observation,Polyurethane foam: This is also a very common cold storage material. It has strong thermal insulation effect and strong mechanical strength. Now it is widely used and has a good application prospect.Material requisition for the installation requirements of the assembly fresh-keeping warehouse: according to the engineering design and construction material list, the materials shall be sent to the accessories warehouse, and the materials and accessories models shall be carefully checked.The cold storage belongs to a kind of refrigeration equipment. Compared with the refrigerator, its refrigeration area is large but they have the same refrigeration principle. So how to maintain the cold storage every day. Today I'll introduce how to do a good job in the daily management and maintenance after the installation of the cold storage.Dobrush,During the installation of cold storage board in cold storage, its installation quality will directly affect the temperature of cold storage. As an important structure used in the cold storage, the cold storage board should pay attention to the details of its installation, find out the problems that are easy to be ignored, and avoid the wrong installation, which will affect the use of the cold storage or the whole installation process, so as to waste resources and increase the cost.Anti odor floor drain shall be set on the pavement of refrigeration room and refrigeration unit room, and the height width ratio of floor drain water seal shall not be less than mm. The elevator shaft, electronic pit and other places convenient for drainage shall be provided with drainage and equipment to avoid backflow of water.Vent valve or water seal well shall be set at the outlet of flushing (thawing) drainage pipeline. Cold proof measures shall be taken for exhaust valves and water sealed wells in severe cold areas.

404 Not Found

404 Not Found


nginx

Related articles

GuantanamoPharmaceutical refrigeration cold storageCommon performance analysis

GuantanamoPharmaceutical refrigeration cold storageCommon performance analysis

The use of large-scale cold storage is naturally very strict in installation and material selection....

Somoto Cold storage unit installationProfessional production

Somoto Cold storage unit installationProfessional production

The exhaust temperature of the compressor equipment is often. When the season changes and the temper...

vitalityMedical cold storageConstruction analysis of

vitalityMedical cold storageConstruction analysis of

On the basis of cold storage and preservation, the quick-frozen warehouse increases the regulation o...

SanaratHow to install the cold storage unitCause analysis and treatment of oxidation

SanaratHow to install the cold storage unitCause analysis and treatment of oxidation

The refrigeration of cold storage pays more and more attention to the needs of environmental protect...

CarrefourCold storage design quotationAdjust industrial process parameters

CarrefourCold storage design quotationAdjust industrial process parameters

Now let's analyze the production and use requirements of the cold storage. There is no condensation...

Momos TenangoCold storage installationAn empirical analysis of price influencing factors

Momos TenangoCold storage installationAn empirical analysis of price influencing factors

Because polyurethane sheet has excellent thermal insulation performance, it can reduce the thickness...

评论列表

695HP135175170
2024-03-10 09:57:10

After my personal experience, the reputation of this store is quite good. DobrushDesign and installation of vegetable fresh-keeping cold storage The quality is more like a diamond. Thank you so much!

224HP159430236
2024-03-10 10:14:50

Happy cooperation and tight packaging. Let’s talk about business services: Like

35HP162657470
2024-03-10 11:24:10

I heard a colleague's introduction to buy DobrushDesign and installation of vegetable fresh-keeping cold storage, and they all said that the quality is good, and I will come to your house next time. Ha ha.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。