Xie DezeSelf-propelled lifting platformResearch on the tendency of failure
2024-02-09 00:41:59Knowledge of pressure lifting platforms, boarding bridges, mobile elevators, Jinan. We sincerely welcome colleagues from all walks of life to visit and inspect the factory, cooperate and negotiate, and seek common development. The following maintenance and upkeep are required for the lifting cargo elevator: Maintenance and upkeep: Maintenance and upkeep should be carried out by the equipment operator or full-time personnel of the operating unit. The equipment maintenance and upkeep unit is responsible for supervising and reviewing the maintenance content. The main content of maintenance and upkeep is summarized as follows:; quot; Cross operation method; quot;: Clean tighten, smooth, adjust, and prevent corrosion. Before and at the end of each shift, to minutes before and after each day, inspect all parts and components of the equipment to ensure they are normal. Apply oil smoothly according to rules, and do a good job in cleaning and handover to achieve the goal of clean appearance and normal operation of the equipment. Maintenance and handover records should be made in a fixed form and used for managementEnsure that power cables and electrical circuits are not damagedXie Deze,Heavy load capacity: protective plate form: ° Or ° Interchangeable configuration rocker working angle: ° Drive method: hydraulic power unit drive or screw drive.What are the functions of anti rust primer for warehouse cargo elevators?Si Sa Ket,Xie DezeDouble column aluminum alloy lifting platform,Weekly maintenance: According to the operation instructions, ensure that the elevator is inspected and smooth every dayRegularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated. ?? Hidden danger investigation relies on joint efforts from all aspects:?? Construction enterprises are the main responsibility for identifying hidden dangers in construction elevators. They should strengthen daily inspections and regular inspections, and carefully inspect the steel structure, safety protection devices, electrical devices, and transmission devices of construction elevators
When disassembling the hydraulic oil tank filler cap, filter cover, inspection hole, hydraulic oil pipe and other parts, it is necessary to avoid dust during the system oil passage. The disassembled parts must be thoroughly cleaned before opening. When disassembling the hydraulic oil tank filler cap, first remove the soil around the tank cap. After loosening the tank cap, remove any remaining debris from the joint area (do not rinse with water to prevent water from seeping into the tank). Only after confirming cleanliness can the tank cap be opened. When using materials and hammers materials that do not remove fiber impurities and specialized hammers with rubber attached to the surface should be selected. Hydraulic components and hydraulic hoses should be carefully cleaned, dried with high-pressure air, and then assembled. Choose a well packaged filter element (the inner packaging is damaged, although the filter element is intact, it may also be unclean). When changing the oil,Xie DezeAluminum alloy lifting platform, clean the filter at the same time. Before installing the filter element carefully clean the bottom dirt inside the filter housing with materials.The design of support points for selecting process parameters is to avoid energy consumption and noise generation due to collision between components and supports during vibration. The supports should be arranged near the nodal line,Xie DezeMobile boarding bridge manufacturer, and the layout principle is: when the aspect ratio of the component is greater than , two point supports can be used; When the aspect ratio is close to , especially in the cold sun or rainstorm climate, the reaction speed will be accelerated, so the exterior paint on the warehouse goods elevator will show signs of aging and then fall off every once in a while. Therefore, when maintaining the equipment of the lift table at ordinary times, pay attention to its storage, and try not to leave it outdoors, let alone in cool days or rainstormGood quality,Use a feeler gauge to check the wear condition of the worm gear of the worm gear reducer. Please refer to the instruction manual for specific requirementsOn the contrary, it should be adjusted in the opposite direction; When the meshing backlash of the gear pair is greater than .mm, loosen the connecting nut of the eccentric shaft of the guide roller and the tooth back pressure wheel as shown in , adjust the tooth back pressure wheel to press towards the back plane of the gear rack until the backlash reaches a reasonable range. Otherwise, it should be adjusted in the opposite direction. At this point, the guide roller should be loosened for o and then adjusted according to the adjustment of the guide roller.Check the protective cable condition of the cable guide frame
Lifting and loweringProduct range,Check the oil level of the gearbox and make up for new oil if necessaryOutbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.Clean and inspect the crown wheel frame assembly, correct or replace with new partsXie Deze,Organize, remove rust and repaint the structural components such as the suspension cage and guide rail frame for corrosion, and reinforce the severely corroded load-bearing membersQuarterly maintenance: Check the items checked each month ?? When the construction supervisory department fulfills its safety supervision and inspection responsibilities, it shall order the immediate elimination of potential safety hazards in the production of construction elevators and cargo elevators discovered during the inspection. If safety cannot be guaranteed before or during the elimination of major production safety hazards, it shall be ordered to evacuate workers from the hazardous area or temporarily stop construction. In the work of hazard investigation and control, the investigation shall be serious, the rectification shall be resolute