BelvilleGrouting pipeIndustry system
2022-05-27 00:27:49Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method,BelvilleSteel pipe, aerated silicification method and electric double liquid silicification method.Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, grouting pipe manufacturer old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.
A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.The grouting equipment, grouting pump and the lowered grouting pipe are connected for grouting,BelvillePrecision tube, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section, move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.BelvilleGrouting pipeIndustry system,2022-05-2700:30:17The secondary grouting pipe can only be grouted once and cannot be reused.The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.
Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.Push the rock powder and sundries that are not washed,BelvilleGrouting pipe, remain at the hole bottom, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.Belville,Evler,Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, the pipe core and the outer wall of the pipe shall be washed clean.