AfragolaRail freight elevatorBefore operation, these general machinery manufacturing knowledge still need to be known
2024-02-07 00:04:24The safety device of the guide rail hydraulic lifting platform The mechanical part of the guide rail hydraulic lifting platform mainly includes the hydraulic system and the mechanical device.In the construction elevator, the switch box also has leakage protection equipment. Its wires and cables are well insulated, without leakage, and the metal threaded is not rusted, and its damage is close to zero. His steel wire rope should comply with the corresponding configuration requirements, and there is no problem of broken strands and diameter reduction. Of course the number of broken wires should not exceed the corresponding standard. His pulley movement is very flexible.Afragola,After the inspection, the elevator manufacturer reminds you to use a compressed air machine to dry all the electrical connection parts inside the head compartment, so as to avoid corrosion caused by moisture accumulation in the electrical connection parts.Secondly, there must be no dirt on the friction surface. If there is dirt, it needs to be washed off with gasoline or thinner; the gear box, gearbox, external gear and other parts of the equipment and the hydraulic oil must be in accordance with the requirements in the table; Correctly maintain the hydraulic guide rail lift. Regularly check whether the wire ropes in each part are broken or loose. If this phenomenon is found, replace them in time. If there is any looseness, it should be tightened in time. The connecting bolts of the equipment should be checked for tightness when the body is under pressure. All connecting shafts should be equipped with cotter pins; check whether each mechanism is operating normally, whether there is noise or failure , to eliminate all faults in a timely manner; when installing, dismantling and adjusting the slewing mechanism of the equipment, it is necessary to pay attention to the parallelism between the reducer and the center line of the gear,AfragolaWarehouse elevator, and the appropriate meshing gap; conduct a comprehensive inspection of the equipment regularly, whether the wires and cables are If there is damage, whether the motor is overheated, and the travel switch points of each safety device must be safe and reliable.Palu distribution box and brushes must be kept clean each box,Are the water cooling and air cooling of the hydraulic station the same?The parts such as reduction box, gearbox, external gear and hydraulic oil are all in accordance with the requirements in the table.Avoid working in an environment. In the event of rain, snow and other weather, the use of the hydraulic lifting platform should be stopped to prevent the occurrence of a short circuit, resulting in electric leakage and electric shock; non-professionals are strictly prohibited from disassembling electrical appliances such as hydraulic lifting platforms. In the event of an accident, you can’t disassemble without permission to eliminate the cause. You must report to the manufacturer for repair in time, inform the phenomenon of the accident, and the manufacturer will guide you to complete the inspection or send someone to repair it; do not disassemble the appliance without permission! Professional elevator factory guarantees quality, guarantees service. Guarantees quality. Your satisfaction is our pursuit! Welcome to inquire.
Precautions for using guide rail elevators Precautions for using guide rail elevators: It is strictly forbidden to overload,AfragolaElevating cargo elevator Elevating cargo elevator, transport flammable and explosive products and other products.Pay attention to the lift during use, and place it on a solid and flat ground to prevent it from tipping over during work. Press the 'Up' or 'Down' button to make the workbench go up and down. Always check and maintain the various parts of the elevator. If the workbench does not move, stop it immediately for inspection. When the working pressure of the electric lift is too high or the sound is abnormal, it should be shut down immediately to avoid serious damage to the machine; the working status of the shaft pin should be checked regularly every month. If the shaft pin and screw are found to be loose, they must be locked to prevent the shaft pin from falling off. cause an accident.How to effectively prevent electric shock by using a hydraulic lifting platform It is very common to add a leakage protector, and the cost is not high. It is both affordable and safe, and can effectively prevent electric shock.quality,The daily maintenance of the hydraulic lifting platform in normal use is essential, but even if there is normal maintenance on the equipment, any possible problem cannot be ignored, so in order to ensure that the process of using the hydraulic lifting platform for each operation What aspects do we need to check before operation? Today, the editor will give you a popular science.Guide rail lift (also known as freight elevator) is a non-scissor hydraulic lifting platform, which is mainly used in industrial plants, restaurants, restaurants, warehouses, docks, different materials, different rated loads, and different brand awareness, the prices are also different. The current price of fixed lifts produced in the domestic market: rated load - tons, height of meters, table size mm *mm, the price is about - yuan; the rated load is - tons, the height is meters, the table size is mm*mm, the price is about yuan. Rated load, lift height, table size of each fixed liftDifferent. (Specific bearing capacity and rising height can be customized according to user requirements)
The design of the hydraulic lifting platform is unreasonable. When the designer designs the cylinder barrel and rod, if there is a problem with the design size and angle, then there will definitely be problems in the later stage. Therefore, it is necessary to confirm the technical strength of the manufacturer when working on a hydraulic lifting platform; what is the problem with the sound of the oil cylinder of the hydraulic lifting platform? Design drawings to make, it will cause the friction between the cylinder barrel and the rod, which will cause the sound; the seal quality of the hydraulic lifting platform is different, and the use of different seals will also affect the sound of the oil cylinder, and the seal with excellent material The continuous friction between the parts and the cylinder wall will cause the sound to be very loud, and long-term wear and tear may scratch the oil cylinder and cause oil leakage, so when the hydraulic lifting platform is used, pay attention to ask the manufacturer what brand and material the seal is used; In some cases of mechanical running-in, it is not ruled out that the above three situations are normal and there will still be noises. If there is no problem after investigation, then don’t worry. It’s just a running-in problem between mechanical parts. It will disappear naturally.production costs,Conscientiously write the special construction plan for installation and construction, and make safety technical disclosures to the installers.Novice operation: Since novices do not know much about mobile lifts and other aerial work platforms, they are prone to misoperation and cause equipment failure. Operators in this area need to study patiently and pass the training before they can operate and use.If the motor of the hydraulic lift is overheated, stop the machine in time and continue running after troubleshooting. The motor bearings must be in good condition.Afragola,Ensure good power supply at the installation site, install a separate distribution box and the leakage switch must meet the requirements for construction elevators when used in the distribution box. If the construction elevator installed is frequency conversion, protection device outside the pump station imported from Italy: organ m type, mesh type, iron plate seal type.Ensure good power supply at the installation site, install a separate distribution box, and the leakage switch must meet the requirements for construction elevators when used in the distribution box. If the construction elevator installed is frequency conversion, the leakage switch should be adapted to the frequency converter when selecting the leakage switch .