WoodstockProspect of distribution transformerUse problems and treatment measures

2022-05-05 11:01:40

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.Woodstock,Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.Frederiksund,WoodstockCircuit transformer,The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person, weather conditions and other materials of the oil sample.Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded,WoodstockRated current of 1600KVA box transformer, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary,The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes,WoodstockThree phase transformer 380V to 208v, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.Difference between dry-type transformer and oil immersed transformer:If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.Marketing Department,The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer, the closing frequency shall be times, the delay time after power receiving shall not be less than min, and the time interval of each closing shall not be less than min.In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.When leaving the factory the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.Woodstock,Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.The main reason is that the welding quality of electric welding is poor, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.

404 Not Found

404 Not Found


nginx

Related articles

CroatiaDifference between box transformer and transformerSpeed ​​up the progress of construction

CroatiaDifference between box transformer and transformerSpeed ​​up the progress of construction

The transformer manufacturer said that the selection should be based on the application environment...

GhentHydraulic small platformDetermination of treatment process parameters

GhentHydraulic small platformDetermination of treatment process parameters

So how to replace the hydraulic oil of the lift machine is correct. The weather is relatively cold i...

PingluLifting operation platform elevatorThe shortage of raw materials in the industry

PingluLifting operation platform elevatorThe shortage of raw materials in the industry

The above detailed introduction, I believe everyone can have a comprehensive understanding of the el...

peasDa KeleshWhat are the characteristics of the production line at least

peasDa KeleshWhat are the characteristics of the production line at least

Remind customers that there are still many areas to pay attention to when maintaining and maintainin...

XinleGuenzburg Answers to frequently asked questions

XinleGuenzburg Answers to frequently asked questions

The safety notice board for construction electric elevators should be prominently placed on the hang...

GrenobleMechanical fixed boarding bridgeAnalysis of the reasons for the shrinking sales volume

GrenobleMechanical fixed boarding bridgeAnalysis of the reasons for the shrinking sales volume

When it comes to fixed hydraulic boarding bridges, I believeIs the boarding bridge easy to use? Thos...

评论列表

717HP127443542
2022-05-05 12:16:52

It's worthy of praise, really good, WoodstockProspect of distribution transformer I like it very much.

709HP180518493
2022-05-05 12:10:50

Feels of value for money, service attitude is very good, WoodstockProspect of distribution transformer workmanship is very good, nothing fussy, all five points

256HP158312377
2022-05-05 12:28:22

I finally waited until I bought it WoodstockProspect of distribution transformer. At first, I was still wondering whether to buy it. I liked it a little bit. I was a little scared to read the comments. I was afraid that the quality was not good. It was not a genuine product. It was a bit different from the picture. However, everything is wrong, the things are good, authentic, the boss is good, and the logistics are good.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。