GibalaAdvanced small conduit processingWhat kinds can it be divided into

2023-09-26 10:08:03
965HP113924865Building materials101

The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced,Gibala50lacrimal duct, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.Gibala, The installation is simple, fast and firm. At least one part of the grouting conduit buried in the concrete shall be firmly bound with the structural reinforcement; The length of the grouting duct leading out of the concrete shall not be less than mm; The leading end of the grouting conduit shall be set at a convenient and accessible position. No part of the grouting conduit shall be flattened or bent to avoid affecting the flow of grout. The opening end of the conduit shall be temporarily blocked to prevent foreign matters from entering. The damaged part of the grouting pipe shall be cut off, and the grouting pipe with the installed grouting pipe shall be re set at the cut-off part, and shall be overlapped with the original grouting pipe at both ends.When binding or welding reinforcement near the grouting pipe, temporary shielding measures shall be taken to protect the grouting pipe. The calculation of the reserved expansion amount of the grouting pipe and the bridge expansion joint changes all the year round. With the change of temperature and the change of vehicle live load, the bridge will shrink and deform. The grouting pipe and the bridge expansion joint play a major role at this time. The expansion amount of the grouting pipe and the expansion joint must be calculated accurately. The installation and construction of the grouting pipe and the expansion joint need to ensure the quality. We should select the model and type of grouting pipe and bridge expansion joint, and determine the installation time, installation season and temperature of grouting pipe and expansion joint. Calculate the large and small preload of grouting pipe and expansion joint.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap,GibalaPipe shed and small conduit, such as greatly improving the pile side friction resistanceOuazzane,In limestone area, the punching is not good and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.The grouting pipe at the tensioning end has good anchoring energy and self anchoring energy. Grouting pipe is generally used for tensioning. The grouting pipe at the tensioning end is composed of four parts: clip, anchor plate, anchor base plate and spiral reinforcement. The clip is the key part of the anchoring system. It is two-piece and made of high-quality alloy steel. It has good air tightness, low gas permeability, strong sealing and no leakage.


GibalaAdvanced small conduit processingWhat kinds can it be divided into



Answer: Yes, it can be protected. The piston rod can be protected by adding plastic hoses or bellows within the travel range.The reusable grouting pipe is used for waterproof sealing of concrete joints and can be used for multiple times of grouting.In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.demand,The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.It is laid in the soil, and through the bite and interlock between the grouting pipe mesh and the soil, it forms an efficient stress transmission mechanism, so that the local load can quickly and effectively spread to the large area of soil, so as to reduce the local failure stress and improve the service life of the project. The convex joint steel plastic grouting pipe is an upgraded product of the ordinary steel plastic grouting pipe, which changes the shortcomings of the ordinary grouting pipe, such as the small peeling force of the joint (n), the easy cracking of the welding point, the difficulty of construction, and the reduction of the role of side displacement prevention. Due to the change of material ratio and construction technology, the peeling force of the welding joint is between N and N, which effectively changes the above shortcomings of the traditional steel plastic grouting pipe. Because of the protruding joints at the welding position,GibalaDouble layer small conduit advance support, it is called convex joint steel plastic grouting pipe, and its academic name is node reinforced steel plastic grouting pipe. The steel plastic grouting pipe is made of high-strength steel wire (or other fibers) through special treatment, polyethylene (PE) and other additives, and is extruded to form a composite high-strength tensile strip. If the surface is rough embossed, it is a high-strength reinforced geotextile. This single belt is woven or sandwiched at a certain distance longitudinally and horizontally, and the drawn out pipe forms a spring shape and stretches automatically. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur.The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass.


GibalaAdvanced small conduit processingWhat kinds can it be divided into



After the two pipes are connected by using the deformation of the grouting pipe, the kneading part of the joint is large at both ends and small in the center, so that the joint is stuck at one time, avoiding the possibility of loose union. The grouting pipe has proper, stable and excellent s in terms of tensile pull-out and torque resistance, and the protrusion is circular arc with small protrusion, which is useful to avoid collision with conduits, vibrators, etc.Application process,Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage? The inner core of the grouting pipe is rigid, which can ensure that it will not be crushed under the concrete pressure. The non-woven filter cloth layer outside the framework only allows water and grouting fluid to pass through, and other materials such as cement slurry in concrete are blocked outside the grouting pipe to fully ensure the smooth use of the whole section of the grouting pipe.The grouting pipe at the tensioning end has good anchoring energy and self anchoring energy. Grouting pipe is generally used for tensioning. The grouting pipe at the tensioning end is composed of four parts: clip, anchor plate, anchor base plate and spiral reinforcement. The clip is the key part of the anchoring system. It is two-piece and made of high-quality alloy steel.Gibala,When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Common problems and answers of grouting pipe what is the pressure inside the grouting pipe?Can the stretching speed of grouting pipe be defined?


404 Not Found

404 Not Found


nginx

Related articles

GibalaAdvanced small conduit processingWhat kinds can it be divided into

GibalaAdvanced small conduit processingWhat kinds can it be divided into

The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the m...

评论列表

605HP153695373
2023-09-26 10:55:45

Haha, GibalaAdvanced small conduit processing received! It's too late to confirm, sorry, the boss is very fashionable!

323HP155335083
2023-09-26 10:28:54

GibalaAdvanced small conduit processing How much is the minimum, can it be wholesale

391HP142030639
2023-09-26 10:45:04

I finally received what I needed GibalaAdvanced small conduit processing, the stuff is very good, the price is good and the price is cheap, thank you boss! To be honest, this is my most satisfying shopping experience. Whether it is the attitude of the store or the items, I am very satisfied. The attitude of the store is very professional and enthusiastic, answering all questions, and the response is very fast. I asked a lot of questions, and he did not feel annoying, and he would answer me seriously. For this, I would like to express my sincere respect to you. There are not many good stores like this. .

535HP136858825
2023-09-26 10:48:49

After my personal experience, the reputation of this store is quite good. GibalaAdvanced small conduit processing The quality is more like a diamond. Thank you so much!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。