TolucaSeamless pipeComplete preferential quotation
2023-08-15 20:33:39● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint,TolucaSeamless pipe, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.
According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, steel flower pipe, advance small conduit, high-pressure grouting pipe, new and old customers are welcome to consult to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration.Push the rock powder and sundries that are not washed, remain at the hole bottom, or stick to the hole wall out of the grouting range,TolucaSteel pipe, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.TolucaSeamless pipeComplete preferential quotation2023-08-1520:33:39Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, aerated silicification method and electric double liquid silicification method.
● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.After the grouting hole is drilled, install and lower the grouting pipe, grout stop plug,TolucaPrecision tube, mixer and other facilities in the hole.Toluca,Malambo,The secondary grouting pipe can only be grouted once and cannot be reused.