PedrigalS11 technical parameters of power transformerMain economic and technical indicators are stable and improving

2022-11-16 01:04:14

Due to careless transportation of the transformer and the thin high-voltage conductor,PedrigalAdvantages of oil immersed transformer, the transformer was disconnected by vibration (but there was no grounding device).Protective measures for damping of dry-type transformerPedrigal,During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.Haradok,Solenoid insulation deteriorationIf the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Seal oil leakage


PedrigalS11 technical parameters of power transformerMain economic and technical indicators are stable and improving



In specific daily life, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?Protection mode for type selection of dry-type test transformerTurn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.total cost,The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, etc. with flexible connection,PedrigalInspection contents of dry-type transformer, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.


PedrigalS11 technical parameters of power transformerMain economic and technical indicators are stable and improving



Power transformer plantretailer,What is the wiring mode of dry-type transformer?It should be said that after the development trend of these years, the overall level of China's transformer industry at this stage is basically international and the quality level is no different from that of overseas goods& rdquo; The person in charge of the transformer Federation of China Household Appliance Industry Association said.A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.Pedrigal,The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.Fault judgment of power transformerThe switching power supply lacks one phase of power;

404 Not Found

404 Not Found


nginx

Related articles

PedrigalS11 technical parameters of power transformerMaterial is the key to determining the degree of adjustment

PedrigalS11 technical parameters of power transformerMaterial is the key to determining the degree of adjustment

After no-load test run is normal for h, it can be transferred to on-load operation, and the load sha...

评论列表

965HP113924865
2022-11-16 09:18:44

Yes, PedrigalS11 technical parameters of power transformer good quality and great value for money

466HP159575805
2022-11-16 09:36:18

Cooperation with you is really good, PedrigalS11 technical parameters of power transformer good quality, come to our company again if you have time.

717HP127443542
2022-11-16 09:36:39

The level of the seller MM is very high, and the people are very patient. I saw a lot of PedrigalS11 technical parameters of power transformer, but I feel that you have the strength and bought yours. I didn’t expect it to be like this. Sellers like this are already online Rarely. I have asked a lot of sellers, but they can't do it, seller MM has done it. And the price is low. I am really happy.

256HP158312377
2022-11-16 08:44:22

Since searching and shopping online, you never have to go out and wander around. Your PedrigalS11 technical parameters of power transformer quality is guaranteed, logistics and delivery are fast, big brands are better than offline stores, and I will review them if necessary in the future!

632HP195506591
2022-11-16 09:13:13

In anticipation, I finally waited for my beloved PedrigalS11 technical parameters of power transformer, I wish the boss a prosperous business and wealth!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。