PerikoLeading small conduit42Manufacturing process and quenching and tempering method

2023-09-07 02:39:03
965HP113924865Building materials111

The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption,PerikoGrouting flower tube, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation.Periko, Push the rock powder and sundries that have not been washed, remain at the bottom of the hole, so as to improve the bonding strength and impermeability of the slurry stone body and the fissure surface.In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water, and construction shall not be carried out in rainy days or wet roads; Glass fiber grouting pipe is made of grouting pipe, which is easy to irritate human skin. Construction personnel must wear protective gloves; When the grouting pipe is laid, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two, which will then generate friction. This friction is generally called 'surface friction'.Tampa, and grouting pipe processed by seamless steel pipe is generally rare in the market. The reasons are as follows: first, in terms of price, generally, the cost of grouting pipes made by welding is relatively low, which is easy for purchasers to accept. The cost of domestic products made of spiral steel pipes and seamless steel pipes is too high. Second, in terms of processing technology, welded pipes are relatively easy to process, and the equipment required is relatively simple. If spiral steel pipes and seamless steel pipes are processed, the process is relatively complex. Manufacturing process and characteristics of clamp down grouting pipe clamp down grouting pipe is a kind of grouting pipe. Because only professional hydraulic clamps are required for connection, it is also commonly called clamp down grouting pipe. The clamp grouting pipe has the following characteristics: the connection of the grouting pipe is simple, as long as the hydraulic clamp is required for connection. The grouting pipe has joints at both ends of the clamp type grouting pipe, which avoids the possibility of loosening and has good seismic resistance. Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. We&#;d better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water, and construction shall not be carried out in rainy days or wet roads; Glass fiber grouting pipe is made of grouting pipe, which is easy to irritate human skin. Construction personnel must wear protective gloves; When the grouting pipe is laid, the relative displacement trend or relative displacement will occur between the narrow two, which will then generate friction. This friction is generally called 'surface friction'.Causes of wrinkling: the blanking specification of pipe joint is too long.


PerikoLeading small conduit42Manufacturing process and quenching and tempering method



The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel,PerikoSmall catheter, and the other is as a pipe for grouting at the bottom of the pile.Inverted formwork shall be used to install stairs and side formwork of components to increase the turnover rate of formwork. According to the design size, the formwork shall be cut with plate shears edge folding machines, profile training machines, etc. the blanking standards shall be used for rebar concealment and cross slab. The unqualified ones shall be rectified until they meet the construction technology. Concrete pouring Before concrete mixing, the moisture content of sand and stone shall be measured and the construction mix proportion shall be adjusted according to the test results.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.total cost,It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.The longitudinal overlapping width of grouting pipe and grouting pipe shall not be less than cm, fix the glass fiber grouting pipe with high-quality cement nails and fixed iron sheets with a size of mm, mm and a thickness of .mm. The fixed spacing can be determined according to the actual construction situation.


PerikoLeading small conduit42Manufacturing process and quenching and tempering method



It is safe and does not need to be welded on site.technical service,Plastic pipe plastic pipe has a low acoustic impedance, which is used as a grouting pipe and has a large acoustic transmission rate. It can usually be used for smaller cast-in-place piles. It should be cautious when used in large-scale cast-in-place piles - because large-diameter piles need to be poured with a large amount of concrete, the plastic pipe will shrink radially and longitudinally due to the temperature drop after concrete solidification, It may be separated from the concrete locally to cause air or water crevices, and add more strong reflection interfaces on the sound path, which is easy to cause misjudgment. When lifting and demoulding components, the concrete strength must meet the design requirements. When there are no special requirements in the design, the non prestressed members shall not be less than % of the designed standard value of concrete cube compressive strength, and the prestressed members shall not be less than % of the designed standard value of concrete cube compressive strength.The use of grouting pipes has become indispensable in modern building construction, ranging from super high-rise and high-rise buildings to multi-storey buildings and indoor decoration construction. China has a longer history of using grouting pipes. Many of China&#;s ancient buildings have been listed as world-class material and cultural heritage, because China&#;s ancient buildings are very technical in construction. In China before and in the early s, grouting pipes made of bamboo and wood were used in the construction of buildings. After the mounting bracket is welded on the surface of the grouting pipe, push the strain gauge in a stable and free state without bending and twisting; The mounting bracket and strain gauge shall be installed parallel to the support axis; When tightening the screw, pay attention to reasonably controlling the frequency of the strain gauge; The installation position of the strain gauge shall be selected at the position suitable for protection as far as possible.Periko,Among the many imported projects, the development of the production technology of automobile door and window sealing strips is the most representative. Through the introduction of sealing strip production lines from Japan, Germany, Italy,Perikomanufacturer of composite anchor rod, Britain and other countries, up to now, domestic manufacturers have introduced more than sealing strip production lines. In addition to pure rubber sealing strips, metal skeleton and various rubber composite sealing strips, rubber and plastic composite sealing strips can be produced. At present, the overall level of China&#;s sealing strip production technology has basically reached the level of foreign countries in the s, and the quality of the grouting pipe as a channel for testing instruments has become crucial. If the quality of the grouting pipe is poor, it will bring many hidden dangers. Steel grouting pipe material, which has the characteristics of thin pipe wall, steel saving, impermeability, pressure resistance and high strength, is generally used for post tensioned reserved holes in prestressed structures. When the grouting pipe is used, it can be directly bound to the reinforcement framework. Because the grouting pipe is very light, it is very convenient to operate. However, attention should be paid to the balance of its axis during installation.The glass fiber grouting pipe is a rigid product made of high-strength alkali free peeling fiber, which is made into a mesh base material through an internationally advanced fine knitting process and is surface coated. Unidirectional tensile plastic grouting pipe is a grouting pipe made of high-density polyethylene (HDPE) as raw material, plasticized and extruded plate, punched, heated and stretched, extruded and pressed, and then punched with regular hole network, and then stretched longitudinally. In this process, the polymer is in a directional linear state and forms an oblong reticular integral structure with uniform distribution and high node strength. The tensile strength and rigidity of the grouting pipe are fully improved through the reorientation of the originally scattered chain molecules into a linear state by stretching.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel and the other is as a pipe for grouting at the bottom of the pile.


404 Not Found

404 Not Found


nginx

Related articles

lubbockStainless steel special-shaped pipeThe total sales volume is significantly enhanced

lubbockStainless steel special-shaped pipeThe total sales volume is significantly enhanced

Rockwell hardness the Rockwell hardness test of stainless steel pipe is the same as Brinell hardness...

Western Sahara409 professional stainless steel plateWhat is the post-maintenance method

Western Sahara409 professional stainless steel plateWhat is the post-maintenance method

Design and research of high precision stainless steel pipe stainless steel pipe has many advantages,...

ShkoderWhich brand of PVC floor is goodCommon problems and troubleshooting methods

ShkoderWhich brand of PVC floor is goodCommon problems and troubleshooting methods

If the cracks on the surface of the wooden floor are not serious, or just the cracks on the paint su...

GuaynaboAnti static brand of floorWhat are the physical performance of

GuaynaboAnti static brand of floorWhat are the physical performance of

GuaynaboLaminate flooring and solid wood composite which is good,Applicable part editing voice Do no...

Biton40Mn2 alloy steel plateLevel optimization measures

Biton40Mn2 alloy steel plateLevel optimization measures

The main force of iron ore futures closed at in The closing price of the day today was the same as...

Luer6063 aluminum tubeWhat are the full aspects of

Luer6063 aluminum tubeWhat are the full aspects of

it is very easy to rust and corrode in places with high ambient humihumidity. If we often use itBe...

评论列表

938HP166090698
2023-09-07 09:49:24

Yes, I hope to cooperate next time. Thank you boss~~ Fast delivery, PerikoLeading small conduit42 basically satisfied.

275HP127226562
2023-09-07 10:53:16

After looking for the PerikoLeading small conduit42 from your family for a long time, I mustered up the courage and the quality of the inspection was very good.

263HP145816628
2023-09-07 10:09:46

PerikoLeading small conduit42 Very cost-effective! It is worth buying like everyone! worth having!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。