San FranciscoAdvance support small conduitFilling materials for the industry

2022-11-17 00:03:42
965HP113924865Building materials207

General treatment method: first, yze what causes the pipe blockage. For the pipe blockage of hard objects, you can poke with steel bars according to the depth, or bind a slightly thicker steel bar with steel wire rope. For the pipe blockage of soft objects, you can use the air compressor pipe to open the air compressor for blowing. Be sure to note that the water in the pipe may rush up like a fountain to pour water all over you! If it is slurry leakage and pipe plugging, there is no way to open it. We can only communicate with the testing personnel to change a testing method, such as low strain and core drilling method! Other uses of the grouting pipe: in addition to being used as a detection channel and replacing part of the reinforcement section, the grouting pipe can also be used as a pipe for grouting at the bottom of the pile. Experiments have proved that the bearing capacity of the cast-in-place pile treated with the grouting at the bottom of the pile can be greatly improved. At the same time, the grouting pipe can also be used as a channel for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch through the pipe at the defective part to be grouted. Grouting pipe is specialized in the production of grouting pipe (ultrasonic detection pipe) for bridge pile foundation inspection. The product conforms to the industrial standard steel thin-walled grouting pipe for concrete cast-in-place pile and its use requirements (JT / T -, which was tried out by the Ministry of communications of the people&#;s Republic of China on April , It can not only meet the requirements of the standard, but also greatly improve each index, and obtain the inspection report of Hebei Road and Bridge Inspection Center.?San Francisco, advantages: Simple installation complete set; The grouting pipe can be intercepted at the construction site according to the actual required length of the joint (it is recommended that the longest grouting outlet length should not exceed m); No special installation equipment is required; fourThe mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, and the other is as a pipe for grouting at the bottom of the pile.Kiboga,Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme. Low cost, fast time, no loss free from climate and place constraints.The glass fiber grouting pipe has the characteristics of easy construction, high temperature resistance, corrosion resistance, low elongation, high elastic modulus, no long-term creep, meeting the requirements of environmental protection, and has high tensile strength in the transverse and longitudinal directions. The strength to weight ratio of glass fiber is larger than that of steel, and the tensile strength can reach kn / m, which provides sufficient strength to prevent reflection cracks. When it breaks, its elongation is less than %, it has high deformation resistance and good compatibility with asphalt mixture.


San FranciscoAdvance support small conduitFilling materials for the industry



How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, clean the reserved groove, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place, and the grouting pipe device in Hainan shall be kept clean when pouring concrete. Installation of grouting pipe the method of installing grouting pipe is to bundle the grouting pipe and add -mm semi-circular flower pipe at the upper end of the reinforcement construction; As the project is a bored pile, the commonly installed grouting pipe is a straight pipe. A diffuser with one-way is set at min below the pipe. The grouting pipe is installed at the end of the reinforcement cage installation and sediment treatment (because the end of the bored pile is cone-shaped, in order to avoid damaging the one-way diffuser at the end of the grouting pipe when lowering the reinforcement cage, it is not appropriate to bundle the grouting pipe on the reinforcement cage and lower it at the same time.) The grouting pipe is set in the diffuser with one-way , and must be wrapped with a special inner tube. After the pipe is lowered, the grouting pipe must be filled with water, and the upper end of the grouting pipe should be blocked.The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating,San Franciscomanufacturer of composite anchor rod, extrusion, molding, punching, stretching, shaping, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight, high strength, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.how much,When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Common problems and answers of grouting pipe what is the pressure inside the grouting pipe?Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. We&#;d better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness.


San FranciscoAdvance support small conduitFilling materials for the industry



The length can be matched according to the construction requirements, without loss.Equipment maintenance,The grouting pipe diffuses the load on it. When the reinforced soil is loaded, the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, greatly improving the bearing capacity of the soil.Advantages of disposable grouting pipe: simple installation, and the cut-off length can be prepared on the construction site according to the actual requirements of the joint (the longest grouting pipe length is recommended not to exceed m), and the grouting time can be arbitrarily selected.The following aspects shall be paid attention to during the construction of grouting pipe: when the construction personnel are binding reinforcement and erecting formwork, reliable fixation measures must be taken for the buried grouting pipe to avoid displacement during concrete pouring and ensure the correct position of the grouting pipe in the concrete. When fixing the grouting pipe, only the allowable part of the grouting pipe can be perforated, and the body part shall not be damaged. The grouting pipe shall be fixed according to the construction specifications required by the design. The common fixing methods are: using additional reinforcement; Fixed with special fixtures; Fix with lead wire and formwork. No matter what fixing method is adopted, the grouting pipe must be positioned accurately without damaging the effective part of the grouting pipe, so as to facilitate concrete pouring and tamping. During the construction of the grouting pipe, there are many sharp stones and sharp edged reinforcement in the concrete, so when pouring, vibrating and positioning the grouting pipe, attention should be paid to the impact force of pouring and vibrating, so as to avoid piercing the grouting pipe due to excessive force.?San Francisco,In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.The grouting pipe without shaft roll packaging is tapped and paid off from the inner ring in the vertical state, otherwise fried dough twist or disorder will occur. Welding is strictly prohibited during use, because the strength of the welding point is much lower than that of the steel itself, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter. It has good air tightness, low gas permeability, strong sealing and no leakage.


404 Not Found

404 Not Found


nginx

Related articles

San FranciscoAdvance support small conduitFilling materials for the industry

San FranciscoAdvance support small conduitFilling materials for the industry

Answer: it varies according to the model and elasticity of the grouting pipe, and its internal press...

评论列表

122HP117294921
2022-11-17 07:19:46

The seller is really good, San FranciscoAdvance support small conduit is the same as the introduction, honest seller

717HP127443542
2022-11-17 07:14:56

Really a good seller. I have to find you if I have this San FranciscoAdvance support small conduit demand in the future!

709HP180518493
2022-11-17 08:38:54

San FranciscoAdvance support small conduit The goods have arrived, much better than what you see in the picture!

632HP195506591
2022-11-17 07:43:12

The quality is very good, exactly the same as the seller’s description, very satisfied, really like it, completely exceeding expectations, the delivery speed is very fast, the packaging is very careful and strict, the logistics company’s service attitude is very good, the delivery speed is very fast, and I am very satisfied One time shopping.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。