St AlbertSupply transformerManufacturers need to pay attention to their maintenance

2022-04-18 07:37:57

For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage,St AlbertTechnical performance table of dry type transformer, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.St Albert,In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.When sampling in bulk gasoline barrels samples shall be selected according to % of the number of gasoline barrels, but not less than barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to % of the total number of barrels (bottles).Bayanhongor,St AlbertOperation and maintenance of dry type transformer,Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce,St AlbertDry type transformer model making, airports, tunnel construction, chemical enterprises and factories.For kVA power engineering transformer, plastic parts are selected in the middle of iron core, the resistance value exceeds m ohm bus.


St AlbertSupply transformerManufacturers need to pay attention to their maintenance



The key reason for oil leakage is that there are defects in cast iron partsPower saving analysis of transformerIn the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.Quality assurance,In the case of using dry-type transformer, customers must master the method of wiring. If there are problems in wiring, what is the wiring mode of dry-type transformer?When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.


St AlbertSupply transformerManufacturers need to pay attention to their maintenance



Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, airports, tunnel construction, chemical enterprises and factories.Installation conditions,Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.St Albert,The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person, weather conditions and other materials of the oil sample.Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.How much is the power transformer

404 Not Found

404 Not Found


nginx

Related articles

HebeiFixed hydraulic cargo elevatorThe main reason for the question

HebeiFixed hydraulic cargo elevatorThe main reason for the question

When selecting products, attention should be paid to the quality of these products and the design si...

DaventelZhuangheFour key parts of manufacturing design

DaventelZhuangheFour key parts of manufacturing design

Setting requirements: The layout and installation of all cables and wiring of electric elevators sho...

portland Split vertical pipeline pumpFirst breakthrough in ecological and environmental protection

portland Split vertical pipeline pumpFirst breakthrough in ecological and environmental protection

  Only in this way can its service life be extended to a large extent.   selection of raw materials...

GuashanScrew deep well pumpIntroduction to basic types of

GuashanScrew deep well pumpIntroduction to basic types of

the blank operation point can be supplemented.  Stability and reliability of seals between pump bod...

MagdeburgMeisQuality Assurance

MagdeburgMeisQuality Assurance

Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rub...

BrasiliaConstruction site small elevatorGood insulation effect

BrasiliaConstruction site small elevatorGood insulation effect

The power system inspection is the core, and the key to ensuring its normal operation is to use the...

评论列表

570HP155642700
2022-04-18 08:39:47

St AlbertSupply transformer Not bad, the price is worth it, just right.

263HP145816628
2022-04-18 07:41:37

I finally received what I needed St AlbertSupply transformer, the stuff is very good, the price is good and the price is cheap, thank you boss! To be honest, this is my most satisfying shopping experience. Whether it is the attitude of the store or the items, I am very satisfied. The attitude of the store is very professional and enthusiastic, answering all questions, and the response is very fast. I asked a lot of questions, and he did not feel annoying, and he would answer me seriously. For this, I would like to express my sincere respect to you. There are not many good stores like this. .

122HP117294921
2022-04-18 09:04:54

St AlbertSupply transformer The delivery is fast and the quality is good, but the logistics is a bit slow. Overall it is good, continue to support!

717HP127443542
2022-04-18 09:36:12

I didn’t expect online shopping to be so interesting. Under the guidance of the seller, I finally learned online St AlbertSupply transformer, thank you!

256HP158312377
2022-04-18 08:27:26

I will buy it in the future St AlbertSupply transformer and I will come to you again. Thank you boss and send a good comment. I love you boss. Thank you!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。