Los Angeles International Airportmanufacturer of composite anchor rodCategory comparison of industries

2022-12-19 00:00:19
965HP113924865Building materials191

It is laid in the soil, and through the bite and interlock between the grouting pipe mesh and the soil, so that the local load can quickly and effectively spread to the large area of soil, so as to reduce the local failure stress and improve the service life of the project. The convex joint steel plastic grouting pipe is an upgraded product of the ordinary steel plastic grouting pipe, which changes the shortcomings of the ordinary grouting pipe, such as the small peeling force of the joint (n), the easy cracking of the welding point the difficulty of construction, and the reduction of the role of side displacement prevention. Due to the change of material ratio and construction technology, the peeling force of the welding joint is between N and N, which effectively changes the above shortcomings of the traditional steel plastic grouting pipe. Because of the protruding joints at the welding position, it is called convex joint steel plastic grouting pipe, and its academic name is node reinforced steel plastic grouting pipe. The steel plastic grouting pipe is made of high-strength steel wire (or other fibers) through special treatment, polyethylene (PE) and other additives and is extruded to form a composite high-strength tensile strip. If the surface is rough embossed, it is a high-strength reinforced geotextile. This single belt is woven or sandwiched at a certain distance longitudinally and horizontally, and is formed by welding its junction with the fusion welding technology of special reinforcement bonding. The grouting pipe is set out from the inner ring tap in the vertical setting out state, and the drawn out pipe forms a spring shape and stretches automatically. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur.?Los Angeles International Airport, the flange plate is used to fix the utility model and the flange plate of the underground grouting pipe, the bolt is rotated with a tool, the cutting blade is adjusted to a certain position by the screw on the bolt, and then fixed, and then the screw cap of the blade is rotated and tightened to make the cutting blade and the pulley contact the inner surface of the grouting pipe with a certain contact force, that is neither loose nor tight. The cutting blade and the pulley are directly inserted into the concave groove of the rotating device through the slot, and the cutting rotating device is fastened and rotated by a wrench or a tooth wrench, and the pulley and the blade are driven to rotate by the rotation of the bolt,Los Angeles International AirportAdvance small conduit and pipe shed, thereby rotating the casing. The pulley is located on the other side of the rotating device, corresponding to the blade. It is mainly used to reduce the friction between the rotating device and the casing wall, and fix the position of the blade in the casing so as to prevent the blade on one side from shifting during cutting, failing to achieve the cutting purpose, or even damaging the blade. The fastening bolt is rotated by a wrench or tooth wrench, so as to drive the pulley and blade to rotate. The cutting rotating device cuts the casing. When the casing is cut to a certain depth, the blade nut is tightened again and the cutting continues until the casing wall is cut through. It has the characteristics of - times higher work efficiency than manual cutting and lower labor intensity of workers.In recent years, there have been frequent natural disasters, such as mountain slides, floods, fires, etc. we are so small in the face of natural disasters that we can only devote our efforts to normal prevention and post disaster rescue. The grouting pipe can reduce the damage caused by these natural disasters.Grouting pipe is an expert in road construction. It can connect the subgrade as a whole and improve the bearing capacity of the subgrade. When encountering natural disasters, the subgrade will not be greatly damaged due to natural disasters, so that we can save more people in the rescue work. The grouting pipe can also play a great role in slope protection. The use of the grouting pipe can well prevent the landslide of mountain soil and debris flow disasters. Through many years of practical experience, it has been proved that the roads that usually use the grouting pipe are far more than the same period of projects in terms of service life and quality. Thus reducing the casualty rate. Grouting pipe is a kind of excellent geosynthetics used for Pavement Reinforcement, old road reinforcement, subgrade reinforcement and soft soil foundation reinforcement. It has become an irreplaceable material in the application of asphalt pavement reflection crack treatment. This product is a semi-rigid product made of high-strength alkali free grouting pipe, which is made of mesh base material through internationally advanced warp knitting process and surface coating treatment. It has high tensile strength and low elongation in both longitude and latitude, and has excellent properties such as high temperature resistance, low cold resistance, aging resistance and corrosion resistance. It is widely used in asphalt pavement, cement pavement and subgrade reinforcement railway subgrade, embankment slope protection, airport runway, sand prevention and control projects. Grouting pipe laying and fixing of grouting pipe laying of glass fiber grouting pipe can be carried out by special equipment refitted from tractors or automobiles, or manually.Porto Velho,Los Angeles International AirportLeading small conduit42,The main elastic element of the grouting pipe is the stainless steel grouting pipe, which compensates the axial, lateral and angular direction of the pipe by the expansion and bending of the grouting pipe. Glass fiber grouting pipe is a semi-rigid product made of glass fiber as raw material, high-strength alkali free glass fiber through a certain warp knitting process, and fiber filament coated on both sides.The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, molding, punching, stretching, shaping, coiling and other processes. Compared with metal textile mesh and plastic woven mesh,Los Angeles International AirportAdvanced small conduit factory, it has light weight, high strength, isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.


Los Angeles International Airportmanufacturer of composite anchor rodCategory comparison of industries



The arrangement of the strain gauge shall be installed before the prestressing force is applied, and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.The installation will not affect the characteristics of the building grouting pipe itself; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; If there is no leakage, grouting is not allowed; Ccll-y series grouting pipe: grouting once, not reusable ccll-d series grouting pipe: multiple times of grouting, grouting is not limited by time.It is applicable to waterproof joints of subway, tunnel and basement. If there is water leakage, grout can be injected into the pipe body to fill and seal. It is very suitable to install grouting pipes between the joints of new and old concrete. Various materials such as cement slurry, the joint can be sealed by injecting slurry into the PVC port or spring skeleton port set on the surface. The proper grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way.The glass fiber grouting pipe has the characteristics of easy construction, high temperature resistance, corrosion resistance, low elongation, high elastic modulus, no long-term creep, meeting the requirements of environmental protection, and has high tensile strength in the transverse and longitudinal directions. The strength to weight ratio of glass fiber is larger than that of steel, and the tensile strength can reach kn / m, which provides sufficient strength to prevent reflection cracks. When it breaks, it has high deformation resistance and good compatibility with asphalt mixture.Installation materials,The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern, and is also a grid like integral geo reinforced material, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, a large deformation modulus, and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways, because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress, increase the deformation modulus of the soil, effectively enhance the strength of the soil, and achieve the effect of stabilizing the project and long-term use.How heavy is a grouting pipe? It has good flexibility. The pipes can be coiled when they are produced so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles and is convenient for construction.


Los Angeles International Airportmanufacturer of composite anchor rodCategory comparison of industries



It has good air tightness, low gas permeability, strong sealing and no leakage.Market trend,Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. We&#;d better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.:. High pressure jet grouting: the slurry is transported by a high-pressure pump, and generates a jet flow with huge kinetic energy through a special nozzle. It cuts the bottom layer, mixes with gravel and sand particles and coagulates. This is called high-pressure jet grouting.The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness.Los Angeles International Airport,The following aspects shall be paid attention to during the construction of grouting pipe: when the construction personnel are binding reinforcement and erecting formwork, reliable fixation measures must be taken for the buried grouting pipe to avoid displacement during concrete pouring and ensure the correct position of the grouting pipe in the concrete. When fixing the grouting pipe, only the allowable part of the grouting pipe can be perforated, and the body part shall not be damaged. The grouting pipe shall be fixed according to the construction specifications required by the design. The common fixing methods are: using additional reinforcement; Fixed with special fixtures; Fix with lead wire and formwork. No matter what fixing method is adopted, the grouting pipe must be positioned accurately, without damaging the effective part of the grouting pipe, so as to facilitate concrete pouring and tamping. During the construction of the grouting pipe, so when pouring, vibrating and positioning the grouting pipe, attention should be paid to the impact force of pouring and vibrating, so as to avoid piercing the grouting pipe due to excessive force.?Answer: Yes, but for a grouting pipe that has been designed, its elastic extension speed is certain.The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality, but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, you should explain it in detail to the manufacturer in the order. The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end, which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.


404 Not Found

404 Not Found


nginx

Related articles

Los Angeles International Airportmanufacturer of composite anchor rodCategory comparison of industries

Los Angeles International Airportmanufacturer of composite anchor rodCategory comparison of industries

Answer: it varies according to the model and elasticity of the grouting pipe, and its internal press...

评论列表

965HP113924865
2022-12-19 07:48:37

Good seller, thank you. My colleagues like Los Angeles International Airportmanufacturer of composite anchor rod very much. Come again next time!

416HP186602172
2022-12-19 07:41:54

Los Angeles International Airportmanufacturer of composite anchor rod Very good, good quality and low price, express delivery is also fast, and inspection is also very standard.

35HP162657470
2022-12-19 08:30:30

Make an advertisement for you, friends: This Los Angeles International Airportmanufacturer of composite anchor rod product is great value.

709HP180518493
2022-12-19 07:42:02

It’s really a test and waiting. I finally waited for 3 days Los Angeles International Airportmanufacturer of composite anchor rod to arrive, the opening quality is very good

256HP158312377
2022-12-19 08:24:15

Follow you Los Angeles International Airportmanufacturer of composite anchor rod for a long time, but this is the first time to start. It should be said to be pretty good. I bought it for the second time, and the shop is better than I expected. The boss praised it.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。