Cinotramanufacturer of composite anchor rodResearch and development of on-line thickness and diameter measuring equipment based on

2023-12-18 02:32:40
965HP113924865Building materials76

It has good flexibility. The pipes can be coiled when they are produced, so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles, and is convenient for construction.The following aspects shall be paid attention to during the construction of grouting pipe: when the construction personnel are binding reinforcement and erecting formwork, reliable fixation measures must be taken for the buried grouting pipe to avoid displacement during concrete pouring and ensure the correct position of the grouting pipe in the concrete. When fixing the grouting pipe, only the allowable part of the grouting pipe can be perforated, and the body part shall not be damaged. The grouting pipe shall be fixed according to the construction specifications required by the design. The common fixing methods are: using additional reinforcement; Fixed with special fixtures; Fix with lead wire and formwork. No matter what fixing method is adopted, the grouting pipe must be positioned accurately, so as to facilitate concrete pouring and tamping. During the construction of the grouting pipe, there are many sharp stones and sharp edged reinforcement in the concrete, so when pouring, vibrating and positioning the grouting pipe, attention should be paid to the impact force of pouring and vibrating,Cinotra50lacrimal duct,After the grouting hole is drilled, the grouting pipe, grout stopper, mixer and other facilities in the hole shall be installed and lowered. Sometimes the grouting pipe is overlaid on the two sides of the horseshoe surface. Adjust the cooperation specifications of the grouting pipe at the distribution nozzle. How to avoid grout leakage during installation of grouting pipe?Wanjin-City,The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern, and is also a grid like integral geo reinforced material, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, a large deformation modulus, and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress increase the deformation modulus of the soil, effectively enhance the strength of the soil, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.It is necessary to comprehensively consider the selection and configuration of grouting pipes, and correct selection is very important. Only in this way can the design of the piping system be safe, reliable and economical.?


Cinotramanufacturer of composite anchor rodResearch and development of on-line thickness and diameter measuring equipment based on



The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.● features: the grouting pipe is divided into disposable grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe) Action mechanism of grouting pipe: the grouting pipe is a flexible material. Under the action of soil load, it is a mechanism of dispersing the force on each hole belt and forming a resultant force.Inspection basis, After the two pipes are connected by using the deformation of the grouting pipe, the kneading part of the joint is large at both ends and small in the center, so that the joint is stuck at one time, avoiding the possibility of loose union. The grouting pipe has proper, stable and excellent s in terms of tensile pull-out and torque resistance, and the protrusion is circular arc with small protrusion, which is useful to avoid collision with conduits, vibrators, etc.In the process of using the acoustic pipe, it is necessary to have a detailed understanding of its installation method, so that it can be used normally and improve the application quality of the grouting pipe. In the process of installing Jiangsu acoustic measuring tube, we should pay attention to the orientation of the installation hole. As long as the device is installed in a correct hole, the Jiangsu acoustic tube can be used normally in the process of application, and the service life of Jiangsu acoustic tube can be improved. This is also the most important factor in the process of application in the future. If the hole fault is bragged about in the process of the device, the resistance of Jiangsu acoustic pipe will appear in the process of application resulting in its damage. There is a great relationship between the accuracy of the hole and the quality after construction. In the process of construction, it is necessary to use the device according to the planned paper so that it can be used normally and improve the quality of use.In the process of application, because there will be many Jiangsu acoustic measurement pipes in the process of construction. In this way, the phenomenon of uneven stress will be formed. In the process of application, the phenomena of conflict and unusable will be formed. In order to prevent the phenomenon of surrounding each other, it is necessary to pay attention to the method of the device in the process of the device so that it can be used normally. The grouting pipe manufacturer introduced that the product quality of the grouting pipe is relatively stable, and when the mold is finalized, it is not easy to show defects. Most of the defects of the grouting pipe appeared in the trial production period, and most of them were formed due to the unreasonable planning structure of the mold. The grouting pipe manufacturer will briefly introduce the treatment methods of defects as follows: wrinkle appearance and treatment methods. The so-called wrinkle refers to that there is a convex edge on the circular arc surface of the grouting pipe, and there is a concave appearance on the adjacent side. This kind of wrinkle is mostly in the shape of sharp ridges, some of which are straight to the nozzle, and often occur symmetrically at both ends of the center line, in the shape of 'eight'. Chengdu grouting pipe manufacturers mostly occur on the inner arc surface, and some occur on the outer arc surface.The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass.


Cinotramanufacturer of composite anchor rodResearch and development of on-line thickness and diameter measuring equipment based on



Answer: Yes, the elastic extension speed of the grouting pipe can be defined within a certain range in the design, but for a grouting pipe that has been designed, its elastic extension speed is certain.middleman,The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe,CinotraGrouting pipe leading small conduit, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness. ultra fine cement slurry and cement grouting materials have been applied since in Thomson tunnel, England. In practice, it has been found that ordinary cement has a large particle size and limited permeability, which can only penetrate into cracks and pores larger than . mm, while the grouting effect for micro cracks is poor. In order to improve the injectability of cement slurry in low permeability media, ultra-fine cement grouting materials have become a research hotspot at home and abroad. As early as the early s, Japan took the lead in developing ultra-fine cement grouting materials, and the United States and Russia also successfully developed this product []. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.Cinotra,Before the installation of the grouting pipe, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.Disposal method: the grouting pipe shall be shortened according to the specification.When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times,CinotraGrouting hollow anchor manufacturer, core drilling inspection shall be carried out in due time. Other uses of grouting pipe introduction the grouting pipe of pile foundation refers to the steel pipe that needs to be embedded when testing the quality of pile foundation. Generally, it is bound in the reinforcement cage and lowered into the hole together with the reinforcement cage before pouring concrete! There are many reasons for the grouting pipe to gamble on the pipe most of which are due to the leakage of slurry caused by the pipe joint not being welded well during processing, and also due to the pipe mouth not being closed well and falling debris, the pipe is blocked! To put it bluntly, the pipe is blocked by sundries! The role of the grouting pipe is to inject clean water into the grouting pipe and put the transducer into the grouting pipe for testing when the integrity of the pile foundation is tested by ultrasonic wave. If the grouting pipe is blocked, the transducer can not be put in, so it is impossible to comprehensively test the whole pile and judge the quality of the pile foundation!


404 Not Found

404 Not Found


nginx

Related articles

Cinotramanufacturer of composite anchor rodResearch and development of on-line thickness and diameter measuring equipment based on

Cinotramanufacturer of composite anchor rodResearch and development of on-line thickness and diameter measuring equipment based on

In the process of using the acoustic pipe, it is necessary to have a detailed understanding of its i...

评论列表

237HP184976196
2023-12-18 11:20:29

Cinotramanufacturer of composite anchor rod Very good, I will order yours for the next batch.

60HP184127502
2023-12-18 10:55:20

Cinotramanufacturer of composite anchor rod The price is very high, and the quality is very good if you can buy it at such a price.

35HP162657470
2023-12-18 10:58:55

I will buy it in the future Cinotramanufacturer of composite anchor rod and I will come to you again. Thank you boss and send a good comment. I love you boss. Thank you!

717HP127443542
2023-12-18 09:36:06

I have almost never seriously evaluated it before. I bought yours Cinotramanufacturer of composite anchor rod and will visit it next time. It is so convenient that I can’t stop at all. It’s a genuine product with fast logistics. I like it for you.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。