Santo DomingoParameters of 500 KVA oil immersed transformerHow to install and operate reasonably

2022-06-07 10:06:03

The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.Santo Domingo,Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.Sig,When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation,Santo DomingoOil type transformer structure, the good model is the solid model of infinite transformer core column, but there are many calculation methods.Fault judgment of power transformer


Santo DomingoParameters of 500 KVA oil immersed transformerHow to install and operate reasonably



If the oil immersed transformer is burned by the cover of the transformer, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.The secondary inductive equipment of the distribution station (such as transformer, voltage transformer, automobile relay, AC, etc.) operates normally. According to the AC current,Santo DomingoPower system transformer, the winding transformer core will send out a symmetrical rhythm and a certain tone & ldquo; Buzz, buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults,When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.


Santo DomingoParameters of 500 KVA oil immersed transformerHow to install and operate reasonably



When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and its power circuit includes an inductance and vertical capacitance, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.Promise and keep promise,It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.The grounding resistance of, high voltage and bottom voltage shall not be less than % (m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed %, which shall not exceed % compared with the last accurate measurement result.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.Santo Domingo,The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized,Santo DomingoHow much is a 160 power transformer, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.The input and output three-phase power lines shall be connected to phase a phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.Careless maintenance and insulation damage

404 Not Found

404 Not Found


nginx

Related articles

Larosh on the Yonghe RiverPlatform styleWin the market

Larosh on the Yonghe RiverPlatform styleWin the market

In terms of welding machine technology, it is necessary to achieve smooth welding, and the marks wil...

ZunhuaElectric elevator 6 metersProfession is king

ZunhuaElectric elevator 6 metersProfession is king

Fixed elevators are a type of transportation equipment that directly lifts and unloads goods from th...

sonnetCirculating hot water pipeline pumpHow to distinguish the rotation direction

sonnetCirculating hot water pipeline pumpHow to distinguish the rotation direction

  There are many types of submersible slurry pumps available in the market, and different pump model...

Boden townSelf priming slurry pump wholesaleDo you know how to use

Boden townSelf priming slurry pump wholesaleDo you know how to use

  The vertical sand pump is generally a submersible slurry pump. Its main application method is that...

seaportLifting hydraulic lifting platform platformBig analysis of the purpose of

seaportLifting hydraulic lifting platform platformBig analysis of the purpose of

The brakes of the rail -type lifting cargo ladder need to be often checked. On the friction surface,...

MesaLifting operation platform elevatorWhat are the impacts of environmental protection on the market?

MesaLifting operation platform elevatorWhat are the impacts of environmental protection on the market?

In campus, various physical protective equipment needs to be installed. In this case, hydraulic elev...

评论列表

409HP184720764
2022-06-07 11:28:02

Santo DomingoParameters of 500 KVA oil immersed transformer Very good, I will order yours for the next batch.

122HP117294921
2022-06-07 10:32:11

After receiving the goods, I feel that the quality Santo DomingoParameters of 500 KVA oil immersed transformer is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics company’s service attitude is very good, and the delivery speed is very fast. In general, this This is a very satisfying purchase, thank you to the seller.

709HP180518493
2022-06-07 11:32:36

I'm busy, I forgot, I'm sorry, what else can I say~~ This Santo DomingoParameters of 500 KVA oil immersed transformer is really good, lucky enough.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。