TarangaSeamless hot dip galvanized pipetechnological innovation

2023-04-29 01:15:05
256HP158312377Building materials159

The reason why the surface of fake and shoddy materials is easy to crack is that its blank is adobe with many air holes. During the cooling process, the adobe has cracks due to the action of thermal stress, and there are cracks after rolling.For improper stamping direction, simulation software shall be used in the initial stage of design to ensure that the direction of stamping parts is analyzed, and when the high-quality requirements of components require the re development of molds, the direction shall be adjusted to seamless square tubes. The square tube manufacturer introduces the forming, bending and bending of square tubes. As the name suggests, the bending is compacted, and the inner and outer rollers are double with the inner and outer walls of tube billets during actual bending Compact towards the.Taranga,Use classification square tubes are divided into: square tubes for decoration, square tubes for machine tool equipment, square tubes for mechanical industry, square tubes for chemical industry, square tubes for steel structure, square tubes for shipbuilding, square tubes for steel beams and columns, and square tubes for special purposes. special shaped square pipe is the general name of square pipes with other cross-section shapes except circular pipe. According to the different cross-section shape and size of steel pipe, it can be divided into special-shaped square pipe with equal wall thickness (code D), special-shaped square pipe with unequal wall thickness (code BD) and special-shaped seamless steel pipe with variable diameter (code D) These special-shaped large-diameter qb square tubes are widely used in various structural parts, tools and mechanical parts. Compared with circular tubes, and have large bending and torsion resistance, which can greatly reduce the structural weight and save steel. Square tubes are an indispensable part of construction workFrankfurt Airport,B. spring steel C. bearing steel tool steel: A. carbon tool steel; b. Alloy tool steel; c. High speed tool steel.Square tube plays an important role in the rapid economic development. The functions of square tube are different, and its characteristics are also different. Square tube has strict standards. There are many welding processes and advantages of square tube. Let me show you the welding process and advantages of lower tube.At this time, if the welding wire of the same material is used for spot welding where the thickness is insufficient, ground and sandblasted, and repair welding shall be adopted where there are cracks, even if the steel pipe with another large opening can be made up at one time.


TarangaSeamless hot dip galvanized pipetechnological innovation



Strength refers to the performance of metal materials under static load (excessive plastic deformation or fracture). Since the action modes of load include tension, compression, bending and shear, the strength is also divided into tensile strength,TarangaGalvanized large diameter square pipe, compressive strength, tensile strength is used as the basic strength indicator. Appropriate sites and warehouses shall be selected. The sites or warehouses for storing steel pipes shall be in clean and unobstructed places, away from factories and mines that produce harmful gas or dust. Weeds and sundries shall be removed on the site to keep the steel pipe clean; In the warehouse, it is not allowed to stack with acid, alkali, salt, cement and other materials that are corrosive to the steel pipe. Different types of steel pipes shall be stacked separately to prevent confusion and corrosion; Large section steel, rail, steel plate, large-diameter steel pipe, forging, etc. can be stacked in the open air; Small and medium-sized section steel, wire rod, reinforcement, medium diameter steel pipe, steel wire and steel wire rope can be stored in a well ventilated shed, but they must be covered and padded; Some small steel pipes, steel sheets, steel strips, silicon steel sheets, or thin-walled steel pipes, all kinds of cold-rolled and cold drawn steel pipes and high and corrosive metal products can be stored in the warehouse; The warehouse shall be selected according to geographical conditions, and generally adopts ordinary closed warehouse, that is, the warehouse with roof, enclosure, tight doors and windows and ventilation devices; The warehouse is required to pay attention to ventilation in sunny days, close and damp proof in rainy days, and often maintain a suitable storage environment. The principle of reasonable stacking and first in first stacking is to stack according to varieties and specifications under the condition of stable stacking and ensuring safety. Materials of different varieties shall be stacked separately to prevent confusion and mutual corrosion; It is forbidden to store articles that have corrosive effect on steel pipes near the stacking position; The bottom of the stack shall be padded high,TarangaHow much is a ton of galvanized square tube, firm and flat to prevent the material from moisture or deformation; The same kind of materials shall be stacked according to the warehousing order, so as to facilitate the implementation of the principle of first in, first out; The section steel stacked in the open air must be provided with wooden mats or strip stones. The stacking surface is slightly inclined to facilitate drainage. Pay attention to the straightness of the material placement to prevent bending and deformation; The stacking height shall not exceed m for manual operation m for mechanical operation, and m for stacking width; A fixed channel shall be reserved between stacks, generally .m, and the access channel is generally ~ om depending on the size of materials and transportation machinery; The bottom of the stack shall be padded up. If the warehouse is cement floor it can be padded up by .M; If it is muddy ground, it must be padded . ~ .m high. If it is an open site, the cement ground shall be padded with O & middot; ~O· m, . ~ . m higher than the sand and mud surface, the angle steel and channel steel shall be stacked in the open air, i.e. the mouth shall face down, which is an important measure to prevent material corrosion. Attention shall be paid to protection during transportation, loading and unloading and shall not be damaged, The storage period of materials can be extended, the warehouse shall be kept clean and the maintenance of materials shall be strengthened. Before warehousing, materials shall be prevented from being drenched or mixed with impurities. Materials that have been drenched or contaminated shall be wiped according to their properties, such as steel wire brush for high hardness and cloth cotton and other materials for low hardness; The materials shall be regularly after warehousing. If there is corrosion, the corrosion layer shall be removed; Generally, the steel pipe surface does not need to be coated with oil after being cleaned but for high-quality steel, alloy steel sheet, thin-walled pipe, alloy steel pipe, etc., the internal and external surfaces need to be coated with anti rust oil before storage; Steel pipes with serious corrosion shall not be kept for a long time after rust removal and shall be used as soon as possible. With the development of economy, all kinds of square tubes, rectangular tubes, seamless square tubes galvanized square tubes and galvanized tubes have been recognized by the majority of customers for a long time. There are more and more counterfeit products on the market. In order to prevent being deceived when you are in square tubes, you need to know some knowledge about how to judge the authenticity of square tubes: & ldquo; We can judge by observing the surface and flatness of the square tube. If the surface of the square tube is relatively flat, it can reflect that the square tube is good. On the contrary, if the surface is not goodThe normal process flow is as follows: the round steel is perforated to form a tube embryo, then pickling is carried out, the black skin on the outer surface is washed off, and then grinding is carried out. After passing the inspection, the rolling mill or cold drawing and cold drawing are carried out. Annealing is required for wall reduction, but not for air drawing. After forming, annealing and straightening are carried out, and pickling is tested and stored in the warehouse. Basically, these are the processes. Better manufacturers will perform whitening treatment during annealing to make the surface treatment more beautiful. The narrow blank of square pipe can produce welded pipe with larger diameter, and the blank of the same width can also produce welded pipe with different diameter. However, compared with the straight seam square pipe with the same length, and the production speed is low. Square pipes with large or thick diameter are usually made of steel blank directly, while small welded pipes and thin-walled welded pipes only need to be directly welded with steel strip. Then after simple polishing, wire drawing is OK. Therefore, straight seam welding is mostly used for relatively welded pipes, and spiral welding is mostly used for large-diameter welded pipes.The advantage of empty bending is that it can bend the side length when the real bending cannot be carried out, such as synchronous bending and finishing of the upper side and side of qb square tube. Empty bending can also bend the inner corner of r.t without breaking the tube wall.Which one is better,Among them, qb square tube is divided into: (a) by process & mdash& mdash; Arc welded square pipe, resistance welded square pipe (high frequency and low frequency) gas welded square pipe and furnace welded square pipe (b) are divided by weld & mdash& mdash; Straight seam welded square pipe, spiral weldingSo flat, and the size and thickness are not standardized, it can reflect that this square tube is a poor product& rdquo;Derusting: This is an important process for galvanized square pipes and components before coating, and it is the key to the quality of galvanized square pipes. Thorough derusting can improve the adhesion of antirust paint and prolong the service life of galvanized square pipe.


TarangaSeamless hot dip galvanized pipetechnological innovation



After spraying (throwing) derusting it can not only expand the physical adsorption on the pipe surface, but also enhance the mechanical adhesion between the layer and the pipe surface. Therefore, spray (throwing) derusting is an ideal derusting method for pipelines. Generally speaking, shot blasting (sand) is mainly used for the inner surface treatment of the pipe, and shot blasting (sand) is mainly used for the outer surface treatment of the pipe. Several problems should be paid attention to in derusting by spraying (throwing).Test method,Derusting: This is an important process for galvanized square pipes and components before coating, and it is the key to the quality of galvanized square pipes. Thorough derusting can improve the adhesion of antirust paint and prolong the service life of galvanized square pipe.Hardness test is to determine the hardness of seamless qb square pipe by slowly pressing a hard indenter on the sample surface according to the specified conditions, and then testing the indentation depth or size.Brinell hardness (HB), Rockwell hardness (HRC) and Vickers hardness (HV) are commonly used.Taranga,Engaged in square tube, square rectangular tube, seamless square tube, galvanized square tube, galvanized tube, the Demander shall cut off the interface pipe when using it. The weight of short length and non fixed length products shall not exceed % of the total delivery. For qb square pipe with theoretical weight greater than kgm, it shall not exceed % of the total delivery. The bending degree of qb square pipe shall not be greater than mm per meter, and the total bending degree shall not be greater than .% of the total length. Galvanized qb square pipe for low-pressure fluid transmission, with standard number of gbt-. Representative materials: QA, qbqb,TarangaStainless steel 25 square tube, etc. It is mainly used for conveying water, gas, air, oil and heating hot water or steam, and its purpose is limited to general low pressure fluid.The pressurization size and time are the key to the success or failure of welding. If the square tube synthetic material is not pressurized a large number of pores will be caused due to the pores of the material itself and the gas generated in the reaction. It is not allowed to leave the reactants in the weld, so it must be densified, usually pressurized during the reaction.Square tubes are classified by forming: forged steel; Cast steel; Hot rolled steel; Cold drawn steel.

404 Not Found

404 Not Found


nginx

Related articles

TarangaSeamless hot dip galvanized pipeWhat are the types and functions

TarangaSeamless hot dip galvanized pipeWhat are the types and functions

Square pipe welding is suitable for surface treatment of materials. Square pipe welding can be used...

评论列表

416HP186602172
2023-04-29 09:26:52

Can you give me a discount next time I buy it, TarangaSeamless hot dip galvanized pipe The quality is good, and I will live up to the boss

717HP127443542
2023-04-29 09:18:31

Feels of value for money, service attitude is very good, TarangaSeamless hot dip galvanized pipe workmanship is very good, nothing fussy, all five points

709HP180518493
2023-04-29 08:29:02

My colleagues like it very much. Come again next time. It's a rare genuine product. TarangaSeamless hot dip galvanized pipe I'm very satisfied with it. The boss has a good personality, awesome. Not bad. The quality is good. The speed is also fast. Really good!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。