Smalyavichy160KV oil immersed transformerSurface structure and processing technology

2023-05-07 02:04:59

Oil leakage of cast iron partsThe power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by %.Smalyavichy,A kind of power engineering equipment that converts the working voltage and current according to the basic law of magnetic effect of current. In the whole process of power transmission and transformation of power engineering, it is necessary to carry out voltage transformation and blood pressure reduction according to the transformer to reduce the loss of electromagnetic energy in the whole process. Therefore, which is converted into bottom voltage electromagnetic energy through transformer.For kVA power engineering transformer plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.Batgrām,The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, resulting in four wiring groups: & ldquo; y, Y & rdquo;, & ldquo; D, Y & rdquo;,SmalyavichyHow to select power transformer, & ldquo; y, D & rdquo;. In China, only & ldquo; y,SmalyavichyWhich is a good oil immersed power transformer, Y & rdquo; and & ldquo; y, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line, it will not be upgraded. All marks show that with neutral line, it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn wiring group, when UAB and UAB overlap, the minute hand points to . & ldquo; & rdquo; in the new wiring group, it is indicated by & ldquo; & rdquo.For no-load impulse closing of transformer, pay attention to the following matters:


Smalyavichy160KV oil immersed transformerSurface structure and processing technology



When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.Hand touch method for transformer inspectionAvoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.Good reputation,For example, in the s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances office and other electrical equipment.When the transformer is out of phase, there is still no sound when the second phase is sent if the second phase is blocked, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.


Smalyavichy160KV oil immersed transformerSurface structure and processing technology



Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, so as to ensure the reliable and stable operation of machinery and equipment.Equipment maintenance,Oil leakage of heat pipe radiatorAccurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.Smalyavichy,(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.Operation of oil immersed transformerAfter hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

404 Not Found

404 Not Found


nginx

Related articles

San Severo Huangshi boarding bridgeCommodity market has a greater impact

San Severo Huangshi boarding bridgeCommodity market has a greater impact

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not work...

Chang'anIndoor small lifting platformLow-cost features

Chang'anIndoor small lifting platformLow-cost features

The selection of surgical parameters is crucial in the process of setting, taking into account these...

Kanthal Box type transformer roomThe pros and cons and how to improve the quality

Kanthal Box type transformer roomThe pros and cons and how to improve the quality

Kanthal Dry type scb10 transformer,When oil samples are used, the safety and fire safety technical s...

HeidelbergPlatform hydraulic liftingWhat are the characteristics of use?

HeidelbergPlatform hydraulic liftingWhat are the characteristics of use?

The equipment operation is very simple, just press the operation button, and the height adjustment b...

ArxanDouble mast aluminum alloy lifting frameThe main reason for the question

ArxanDouble mast aluminum alloy lifting frameThe main reason for the question

Multi mast aluminum alloy lifting platform: the whole platform is refined by high-strength aluminum...

LuchengMobile lifting platform hydraulicIntroduction to the selection skills of homework methods

LuchengMobile lifting platform hydraulicIntroduction to the selection skills of homework methods

How to maintain the elevator when it is not in use? If the elevator is placed in the warehouse, its...

评论列表

35HP162657470
2023-05-07 10:08:56

After looking for the Smalyavichy160KV oil immersed transformer from your family for a long time, I mustered up the courage and the quality of the inspection was very good.

409HP184720764
2023-05-07 10:43:02

Smalyavichy160KV oil immersed transformerVery good, very supportive, very good quality, exactly the same as described by the seller, and the price is cheap

570HP155642700
2023-05-07 10:29:15

The packaging Smalyavichy160KV oil immersed transformer looks very good, the packaging is very careful, I believe the goods must be very good, thank you! Good value, huh, come again next time.

263HP145816628
2023-05-07 09:09:50

Smalyavichy160KV oil immersed transformerHow much is it, can I transfer the goods?

122HP117294921
2023-05-07 10:25:34

Your company Smalyavichy160KV oil immersed transformer has a very good service attitude, thank you, and like you.

709HP180518493
2023-05-07 10:27:19

After my personal experience, the reputation of this store is quite good. Smalyavichy160KV oil immersed transformer The quality is more like a diamond. Thank you so much!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。