PasadeshkPrice list of 250kVA box type transformerContainer volume calculation method

2023-03-02 12:20:27

The method and whole process of taking oil sample of power transformer are as follows:Power transformer plantPasadeshk,According to statistics, to occupy the main global technical position the transformer industry depends on two key data, China has been a powerful country in the production, manufacturing and application of dry-type transformers all over the world, but it is not a big country.Sound in case of phase failureFort sekhbeh,Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined,PasadeshkRequirements for oil immersed transformer room, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.Solenoid insulation deterioration


PasadeshkPrice list of 250kVA box type transformerContainer volume calculation method



Oil leakage at electric welding positionIn order to promote the use of energy-saving transformers, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as , providing subsidies of - yuan / KVA for energy-saving transformers.The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, the output capacity can be increased by %.Quality inspection report,PasadeshkDistribution transformer maintenance,Oil leakage of cast iron partsOn load commissioning:Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.


PasadeshkPrice list of 250kVA box type transformerContainer volume calculation method



Oil leakage at looper flangeHonest service,Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.The proper selection of Anhui dry-type transformer has a key effect on improving the safety and smooth operation of power system software. In the above original text,Pasadeshk20kV power transformer, we have already mastered the structure and characteristics of dry-type transformer. In this part, we will describe how to select dry-type transformer according to the load characteristics and application environment of dry-type transformer.Power transformer manufacturerPasadeshk,(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.Noise pollution control and prevention measures of dry-type transformerAvoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes

404 Not Found

404 Not Found


nginx

Related articles

PasadeshkPrice list of 250kVA box type transformerSelection of standard parts

PasadeshkPrice list of 250kVA box type transformerSelection of standard parts

which also ensures the rated voltage of kV; Oil immersed transformers are generally suitable for di...

评论列表

466HP159575805
2023-03-02 14:07:15

The quality is very good, exactly the same as the seller’s description, very satisfied, really like it, completely exceeding expectations, the delivery speed is very fast, the packaging is very careful and strict, the logistics company’s service attitude is very good, the delivery speed is very fast, and I am very satisfied One time shopping.

416HP186602172
2023-03-02 14:18:44

Cooperation with you is really good, PasadeshkPrice list of 250kVA box type transformer good quality, come to our company again if you have time.

35HP162657470
2023-03-02 12:25:26

PasadeshkPrice list of 250kVA box type transformer It’s really good, how long does it take to arrive after the departure?

409HP184720764
2023-03-02 14:04:09

PasadeshkPrice list of 250kVA box type transformer The quality is not bad, and the goods are delivered in time. I recommend you to buy it next time.

122HP117294921
2023-03-02 13:45:44

I’ve been too busy lately, it’s too late to confirm, PasadeshkPrice list of 250kVA box type transformer is very good, like the boss.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。