PataraTransformer variable frequency power supplyWhat homework should be done in daily inspection
2022-05-01 10:36:30During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.Difference between dry-type transformer and oil immersed transformer:Patara,Under normal conditions different oil-based oils cannot be mixed. Under special circumstances, if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding,Manufacturing process and steps of dry-type transformerCaused by sand holes and cracks. For crack leakage,Patara1600KVA box transformer price, drilling stop hole is a good way to remove in-situ stress and prevent widening.Oil leakage at electric welding position
The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered coupled with the constraints of factors such as low threshold in the field, uneven companies, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.Welcome calls ,The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:Dry type transformer manufacturerThe project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.
The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding,Patara4000 dry type transformer size, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.safety requirements ,PataraTransformer distribution room,What is the wavelength of oil immersed transformer?The selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than kV, class H dry-type transformers shall be used. If the standard impulse level of power load exceeds kV, epoxy resin adhesive shall be used to pour dry-type transformers.According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.Patara,The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.Difference between dry-type transformer and oil immersed transformer:Before no-load impulse closing, the transformer shall be placed for h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.