QuebecSmall conduit supportWhat are the external factors affecting processing

2023-01-31 04:07:02
965HP113924865Building materials171

Answer: it varies according to the model and elasticity of the grouting pipe,QuebecAdvance small conduit for tunnel, and its internal pressure can reach bar or more.In limestone area, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, The installation will not affect the characteristics of the building grouting pipe; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; If there is no leakage, grouting is not allowed. The embedded grouting pipe system is used for permanent sealing of construction joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. Various materials such as cement slurry, polymer slurry and polyurethane chemical slurry can be injected. When water penetrates into the joint, the joint can be sealed by injecting slurry into the PVC port or spring skeleton port set on the surface. The proper grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm,QuebecSeamless small conduit, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.Richmond, The cooperation Specification between the saddle profile on the horseshoe of the grouting pipe and the core is too low. When the outer mold and the horseshoe surface are fitted together, the gap is larger than the thickness of the pipe wall, that is, there is an active gap. Therefore, the Chengdu grouting pipe manufacturer kneads the pipe wall to form an 'eight' shaped wrinkle.Causes of wrinkling: the blanking specification of pipe joint is too long.The glass fiber grouting pipe has the characteristics of easy construction, high temperature resistance, corrosion resistance, low elongation, high elastic modulus, no long-term creep, meeting the requirements of environmental protection, and has high tensile strength in the transverse and longitudinal directions. The strength to weight ratio of glass fiber is larger than that of steel, and the tensile strength can reach kn / m, which provides sufficient strength to prevent reflection cracks. When it breaks, its elongation is less than %, it has high deformation resistance and good compatibility with asphalt mixture.


QuebecSmall conduit supportWhat are the external factors affecting processing



In the process of using the acoustic pipe, it is necessary to have a detailed understanding of its installation method, so that it can be used normally and improve the application quality of the grouting pipe. In the process of installing Jiangsu acoustic measuring tube, we should pay attention to the orientation of the installation hole. As long as the device is installed in a correct hole, the Jiangsu acoustic tube can be used normally in the process of application, the resistance of Jiangsu acoustic pipe will appear in the process of application, resulting in its damage. There is a great relationship between the accuracy of the hole and the quality after construction. In the process of construction, it is necessary to use the device according to the planned paper so that it can be used normally and improve the quality of use.In the process of application, because there will be many Jiangsu acoustic measurement pipes in the process of construction. In this way, the phenomenon of uneven stress will be formed. In the process of application, the phenomena of conflict and unusable will be formed. In order to prevent the phenomenon of surrounding each other, it is necessary to pay attention to the method of the device in the process of the device, so that it can be used normally. The grouting pipe manufacturer introduced that the product quality of the grouting pipe is relatively stable and when the mold is finalized, it is not easy to show defects. Most of the defects of the grouting pipe appeared in the trial production period, and most of them were formed due to the unreasonable planning structure of the mold. The grouting pipe manufacturer will briefly introduce the treatment methods of defects as follows: wrinkle appearance and treatment methods. The so-called wrinkle refers to that there is a convex edge on the circular arc surface of the grouting pipe, and there is a concave appearance on the adjacent side. This kind of wrinkle is mostly in the shape of sharp ridges, some of which are straight to the nozzle, in the shape of 'eight'. Chengdu grouting pipe manufacturers mostly occur on the inner arc surface, and some occur on the outer arc surface.architectural engineering; Grouting technology can be divided into static pressure grouting and high-pressure jet grouting. However, according to the action mechanism of the slurry on the soil, the geological conditions, the grouting pressure, the movement form of the slurry and the alternative ways, the grouting technology can be divided into four categories: penetration grouting, split grouting, compaction grouting and jet grouting.The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better.Encyclopedic knowledge,?Welding is strictly prohibited during use, because the strength of the welding point is much lower than that of the steel itself, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter. The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality, but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, you should explain it in detail to the manufacturer in the order. After the two pipes are connected by using the deformation of the grouting pipe, the kneading part of the joint is large at both ends and small in the center, so that the joint is stuck at one time, avoiding the possibility of loose union. The grouting pipe has proper,QuebecAdvance small conduit and pipe shed, stable and excellent s in terms of tensile pull-out and torque resistance, and the protrusion is circular arc with small protrusion, which is useful to avoid collision with conduits, vibrators, etc.


QuebecSmall conduit supportWhat are the external factors affecting processing



When the grouting pipe is laid, it shall be kept flat and tight without wrinkling, so that the grouting pipe has effective tension. After laying, it shall be rolled again with a clean steel wheel roller. Most urban roads use glass fiber grouting pipes with self-adhesive. The diameter of the glass fiber grouting pipe is . ~ times of the maximum particle size of the asphalt concrete surface aggregate. The ultimate tensile strength should be greater than kN / m, so as to give play to the anti reflection crack performance of the glass fiber grouting pipe. It can also ensure the shear resistance and adhesive force of the adhesive layer of the glass fiber grouting pipe.Promise and keep promise Low cost, fast time, no loss, free from climate and place constraints.Development trend editor since the advent of Portland cement in , cement grouting has been the main grouting method in engineering. However, ordinary cement can only be filled with sand gravel or pores with a diameter greater than . ~ .mm due to its coarse particles. Therefore, improving the fineness of cement particles has become the main way to improve the groutability of cement slurry. Some countries have developed a kind of ultra-fine cement which can pour fine sand with permeability coefficient of - ~ -cm / s and micro cracks in rocks. It is a promising granular grouting material. Propionate is a kind of water-soluble polymer chemical slurry, whose viscosity is close to that of water. It is widely used in anti-seepage grouting and dynamic water plugging of fine rock cracks and medium fine sand layers. However this kind of pulp material is toxic and pollutes the air and groundwater, so most of them have stopped production and use. In , AC slurry was developed in the United States, and in , ac-ms slurry was developed in China. The toxicity of this kind of slurry is very small (only % of the toxicity of propionate). It is an ideal anti-seepage slurry. The non alkaline silicate slurry developed in Japan has no alkaline pollution to groundwater, low viscosity, high gel strength, good durability and does not change the pH value of groundwater. [] Grouting method is divided into ceramic process grouting and construction engineering grouting. Ceramic process grouting is the process of using the prepared mud injection in ceramic production. Construction engineering is to use appropriate methods to inject some curable grout into the cracks or pores of the rock and soil foundation and to improve its physical and mechanical properties through replacement, filling, size and specification. Seepage prevention Water plugging The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?Quebec,The grouting pipe with the grouting pipe as the core flexible element can be compensated in the axial, lateral and angular directions on the pipeline. From the perspective of its performance, the internal pressure grouting pipe can be displaced in three directions, but because it is limited by casing and other accessories, it can often only be displaced in the axial direction. Therefore, the user needs to indicate the displacement in several directions when selecting and ordering, so as to select correctly. The working principle of the grouting pipe is to use its own elastic deformation to compensate the axial, angular, mechanical deformation and various mechanical vibrations. The compensation has the s of sealing, pressure resistance, temperature resistance, corrosion resistance, impact resistance, vibration reduction and noise reduction, which can reduce the deformation of the pipe and improve the service life of the pipe.It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in ChinaIt is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint and the deviation shall not exceed mm. Meanwhile, the top surface of its steel beam shall be adjusted according to the longitudinal the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation.


404 Not Found

404 Not Found


nginx

Related articles

QuebecSmall conduit supportWhat are the external factors affecting processing

QuebecSmall conduit supportWhat are the external factors affecting processing

The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shape...

评论列表

965HP113924865
2023-01-31 11:54:16

Ask, can I send QuebecSmall conduit support specific specifications, let me call you guys.

409HP184720764
2023-01-31 12:35:46

QuebecSmall conduit support The goods have arrived, much better than what you see in the picture!

122HP117294921
2023-01-31 12:08:01

Feels of value for money, service attitude is very good, QuebecSmall conduit support workmanship is very good, nothing fussy, all five points

256HP158312377
2023-01-31 11:17:34

Haha, I like it very much, like and cheer for the boss QuebecSmall conduit support

632HP195506591
2023-01-31 12:48:07

After receiving the goods, I feel that the quality QuebecSmall conduit support is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics company’s service attitude is very good, and the delivery speed is very fast. In general, this This is a very satisfying purchase, thank you to the seller.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。