TravnikSeamless pipeWhat is the reason for this trend

2024-04-21 02:51:32
263HP145816628Electronic Component53

The secondary grouting pipe can only be grouted once and cannot be reused.Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, grouting pipe factory,TravnikSteel pipe, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, strengthen and correct the deflection of buildings.

TravnikSeamless pipeWhat is the reason for this trend


The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.TravnikSeamless pipeWhat is the reason for this trend,2024-04-2102:51:31The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method,TravnikSeamless pipe,TravnikGrouting pipe, alkali solution method, high chemical grouting method and cement grouting method.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

TravnikSeamless pipeWhat is the reason for this trend


Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.According to the sequence of sectional construction along the stratum depth, grouting can be divided into sectional downward sectional upward and sub full depth grouting. The segmented downward type is to start from the ground, drill section holes from top to bottom and inject section slurry. After each injection section, continue to extend the drilling and grouting, so as to alternately carry out until the designed final grouting depth, and then carry out re grouting from bottom to top; The sectional upward pattern is that the grouting hole is drilled to the final grouting depth at one time. All kinds of grouting pipes, steel flower pipes, advance small conduits, high-pressure grouting pipes, pipe shed pipes and the formal qualification of grouting pipe factory are welcome to inquire by telephone and sincerely invite cooperation! Grout stop shall be used for bottom-up sectional grouting; The secondary full depth grouting method is to drill the grouting hole to the final grouting depth, and then conduct secondary grouting for the full depth.Travnik,Acola,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method double liquid silicification method, aerated silicification method and electric double liquid silicification method.

404 Not Found

404 Not Found


nginx

Related articles

GuadalupePrecision tubePrices fell slightly and sales were sluggish

GuadalupePrecision tubePrices fell slightly and sales were sluggish

Special slings shall be used for the lifting of horizontal members such as laminated plates,Guadalup...

VarnaSteel pipeThe overall price remains weak and the local consolidation fluctuates

VarnaSteel pipeThe overall price remains weak and the local consolidation fluctuates

The secondary grouting pipe can only be grouted once and cannot be reused.The secondary grouting pip...

San Juan de la maguanaPrecision tubeThe product counter attack rose by 100 yuan, and the rising opportunity is coming

San Juan de la maguanaPrecision tubeThe product counter attack rose by 100 yuan, and the rising opportunity is coming

The secondary grouting pipe can only be grouted once and cannot be reused.● features: the grouting p...

RichmondGrouting pipeThe rise is weak, and the market is weak in the off-season

RichmondGrouting pipeThe rise is weak, and the market is weak in the off-season

● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter t...

LevisSeamless pipeDetection is

LevisSeamless pipeDetection is

The secondary grouting pipe can only be grouted once and cannot be reused.Process flow: drill in pla...

Jack MelGrouting pipeResource shortage and strong price shock

Jack MelGrouting pipeResource shortage and strong price shock

qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grout...

评论列表

263HP148803710
2024-04-21 10:46:57

I didn’t expect online shopping to be so interesting. Under the guidance of the seller, I finally learned online TravnikSeamless pipe, thank you!

161HP196399230
2024-04-21 10:11:54

After receiving the goods, I feel that the quality TravnikSeamless pipe is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics company’s service attitude is very good, and the delivery speed is very fast. In general, this This is a very satisfying purchase, thank you to the seller.

709HP180518493
2024-04-21 10:14:35

TravnikSeamless pipeHow much is it and how can I sell it?

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。