Isili murinoTransformer distribution roomMain functions and advantages
2024-03-02 00:14:45If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch,Isili murinoTechnical parameters of scb10 dry type transformer, then lower the bell cover anchor bolt of the large cover, and count the spacing and specifications for easy reinstallation. At the same time wear round steel from top to bottom in the surrounding screw holes, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.When sampling in bulk gasoline barrels, samples shall be selected according to % of the number of gasoline barrels, but not less than barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to % of the total number of barrels (bottles).Isili murino,The selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than kV, class H dry-type transformers shall be used. If the standard impulse level of power load exceeds kV, epoxy resin adhesive shall be used to pour dry-type transformers.The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.GeorgievkaInsulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.In the whole process of transmitting electromagnetic energy in the power supply system,Isili murinoPrinciple of power transformer, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.
When the new oil filled by the power transformer and the oil sample that has just been considered are used the oil sample can be used only after sufficient standing.The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate, and then the iron loss is considered and the copper loss is ignored. In fact, for a certain load, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer, so it consumes electromagnetic energy.When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover,Isili murinoDry type power transformer 1250kva, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb and loosen your thumb to make the oil enter the pipe,Customer first,When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.
During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.technical service,If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).There is a magnetic induction line crossing in the transformer core, it is called vortex. The existence of vortex makes the transformer core hot and consumes kinetic energy. This kind of loss is called vortex loss.Careless maintenance and insulation damageIsili murino,The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.After no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.