NancyBarrier free vertical lifting platformMaintenance method

2024-02-24 00:47:16

Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.Nancy,If there is a reserved shaft in the villa residential area, the appropriate car model can be selected by comparing the width and depth of the elevator car based on the size, width, and depth of the shaft. If there is no reserved shaft, you can first choose the model of the elevator and create a new shaft based on the required reserved size space for different models.Maintenance of elevator hall doors and car doors. Elevator malfunctions usually occur on the elevator hall and car doors so attention should be paid to the maintenance of the hall and car doors. One is to refuel the fuel on the upper sill of the door and keep it in good condition, so that the elevator will not make unpleasant noises during operation and the opening of the door. Pay attention to the inspection of the safety contact plate or light curtain type contact plate switch wire of the elevator, as the frequency of opening and closing the door in the elevator is high, which can cause damage to the switch wire. This requires maintenance personnel to inspect it every time they work, try to obtain relevant data outside the shaftThe shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, and special attention should be paid to moving parts such as counterweights and wire ropes).The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder, strictly speaking, the lifting height of a ladder is the vertical distance between the finished ground at the upper and lower support beams. When using the suspension line method to measure, attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.If the elevator is already on the first floor, immediately open the elevator door and enter the firefighter's dedicated state.


NancyBarrier free vertical lifting platformMaintenance method



If the elevator is already on the first floor, immediately open the elevator door and enter the firefighter's dedicated state.Aircraft weighing tens or hundreds of tons in the elevator hangar are vertically lifted onto the airport runwayThe shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).Safety production,The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder, strictly speaking, the lifting height of a ladder is the vertical distance between the finished ground at the upper and lower support beams. When using the suspension line method to measure, attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use,NancyHome mini elevator Small home elevator, try to obtain relevant data outside the shaft, such as the size of the machine room,NancyHome elevator villa self built house, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).


NancyBarrier free vertical lifting platformMaintenance method



There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.Job description,b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.As elevator people, let's talk about elevator and elevator safety knowledge: The elevators we currently use include box type passenger elevators, escalators, and dedicated cargo elevators. Dedicated cargo elevators are installed due to special needs, and we don't use many of them. Now, let's take a look at the safety knowledge of box type passenger elevators and escalators: When we take escalators, Be sure to follow the safety instructions when riding on the elevator. Do not crowd or play around, hold onto the elevator firmly, and avoid getting them caught up.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.Nancy,Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.To implement the arrangement of escalators and provide feedback,NancyRear flip hydraulic plate flipper, in order to determine the configuration of certain shared devices, the order of shipment, and the alignment of handrail turns during continuous arrangement.


404 Not Found

404 Not Found


nginx

Related articles

CroatiaDifference between box transformer and transformerWhat are the advantages of the product

CroatiaDifference between box transformer and transformerWhat are the advantages of the product

Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-si...

AlvardenAll electric aluminum alloy elevatorHow does it play a practical role

AlvardenAll electric aluminum alloy elevatorHow does it play a practical role

Introduction to aluminum alloy elevator: Aluminum alloy elevator is a fixed transportation equipment...

AkoyapaHow to select power transformerIndustry causes substantial damage

AkoyapaHow to select power transformerIndustry causes substantial damage

What is the important role of power transformerIf the oil immersed transformer is burned by the cove...

MonsOil immersed box transformerApplication processing method

MonsOil immersed box transformerApplication processing method

The flange surface is uneven the tightening bolts are loose, so that the bolts are not tightened wel...

MarseilleHigh overload capacity distribution transformerWhat needs to be checked before equipment inspection operation

MarseilleHigh overload capacity distribution transformerWhat needs to be checked before equipment inspection operation

It includes the performance and main uses of insulating layer materials, component manufacturing pro...

Cannes Scissor fork platform lifting platformAffordable National Hot Sale

Cannes Scissor fork platform lifting platformAffordable National Hot Sale

The simple approach is to tie two ladders, with the top tightly wrapped and the bottom connected by...

评论列表

695HP135175170
2024-02-24 08:21:22

Haha, I like it very much, like and cheer for the boss NancyBarrier free vertical lifting platform

323HP155335083
2024-02-24 09:40:09

The level of the seller MM is very high, and the people are very patient. I saw a lot of NancyBarrier free vertical lifting platform, but I feel that you have the strength and bought yours. I didn’t expect it to be like this. Sellers like this are already online Rarely. I have asked a lot of sellers, but they can't do it, seller MM has done it. And the price is low. I am really happy.

535HP136858825
2024-02-24 09:36:17

Finally got NancyBarrier free vertical lifting platform So happy that! The workmanship is great.

263HP145816628
2024-02-24 08:29:23

The first online purchase NancyBarrier free vertical lifting platform. I use my personal experience to tell everyone that your service attitude is very good. The quality of the goods is also very good. I like you!

709HP180518493
2024-02-24 09:10:34

Brother, with your support, this new model NancyBarrier free vertical lifting platform is indeed up to standard and very good.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。