Gu YeElevating platform stageThe question temperature plays an important role

2023-10-04 22:10:39

The front room of the fire elevator is equipped with Class B fireproof doors or fireproof rolling shutters with stopping function.The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.Gu Ye,When encountering abnormal elevator operation,Gu YeHydraulic stage elevator, you can call the repair hotline to consult with the maintenance personnel or inform the service center to handle it. Do not take unauthorized measures to avoid causing greater harm to the elevator or even causing casualties.Measure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.Punjab,Please note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.Measurement of elevator and escalator shafts (III)Measure the length, width, and depth of the pit (if any) and observe whether there are grooves and embedded parts at the support beam.


Gu YeElevating platform stageThe question temperature plays an important role



If the elevator is already on the first floor, immediately open the elevator door and enter the firefighter's dedicated state.Home elevators are different from public spaces, such as professional home elevators, villa home elevators, home elevator manufacturers, small home elevators, and other special products. Old brands have advantages in price and guaranteed quality. Considering the limited installation space, lack of dedicated hoistways, and small lifting height, the design pursues simplicity and miniaturization, and the existence of computer rooms is not necessary. Long term promotion of home elevator manufacturers, old brands, price advantages, and the call is cut off.quality index,Please note that there should be a space of over mm left on both sides of the escalator, there is no restriction between the two escalators.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab,Gu YeSmall household micro elevator, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.The door closing button has no self maintenance function. During the designated maintenance period, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.


Gu YeElevating platform stageThe question temperature plays an important role



b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Job description,Measure the length,Gu YeFully automatic hydraulic tipping machine hopper, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.Household elevators must be regularly maintained to confirm their safety and whether they can continue to operate, while also repairing any faults and hidden dangers found.The mechanical components of the elevator's traction machine require oil. There are two scales on the outer cover of the traction machine. Open the oil nozzle to check that the oil should be in the middle of the two scales. If the oil is lower than the lower scale, it means that the traction machine should be refueled. If not refueled, the elevator will not operate well for a long time, leading to the burning of the elevator traction machine and motor. After the elevator has been running for a long time, the oil should be replaced in a timely manner to keep the traction machine clean and in good condition.Gu YeAttention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.


Related articles

Gu YeElevating platform stageAnalysis of the characteristics of materials used

Gu YeElevating platform stageAnalysis of the characteristics of materials used

The mechanical components of the elevator's traction machine require oil. There are two scales on th...

评论列表

881HP198728332
2023-10-05 07:00:55

Haha, Gu YeElevating platform stage received! It's too late to confirm, sorry, the boss is very fashionable!

275HP127226562
2023-10-04 23:29:38

I have almost never seriously evaluated it before. I bought yours Gu YeElevating platform stage and will visit it next time. It is so convenient that I can’t stop at all. It’s a genuine product with fast logistics. I like it for you.

605HP153695373
2023-10-04 23:46:03

Gu YeElevating platform stage Very good, good quality and low price, express delivery is also fast, and inspection is also very standard.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。