MonteplataApplication of oil immersed transformerAdapt to changes in industry load

2022-06-19 13:48:35
the transformer shall be placed for h

Fault judgment of power transformerBefore no-load impulse closing, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.Monteplata,Transformer manufacturers generally adopt IP protective casing, which can avoid the entry of solid dirt with a diameter of more than mm, rats, snakes, cats, birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure, and provide a safe natural barrier for the energized part. If the transformer equipment must be outdoors, IP protective casing can be adopted, which can avoid being equally divided with the above IP protective effects However, IP casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.The flange surface is uneven the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.Overijse,The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.The key reason for oil leakage is that there are defects in cast iron partsOil leakage of porcelain pot and laminated glass oil level gauge


MonteplataApplication of oil immersed transformerAdapt to changes in industry load



When the manufacturer of the power transformer samples from the automobile oil tank,MonteplataStructural composition of oil immersed transformer, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation, offset, cracking, loosening, ignition smoke, oil leakage, short-circuit fault marks hanging of dirty things, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.What about oil immersed transformer fire?Manufacturing cost,When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.


MonteplataApplication of oil immersed transformerAdapt to changes in industry load



In the case of dry-type transformer operation, and some even cause noise, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.quality index,MonteplataPower supply transformer S11,The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.The dry-type transformer used for power plant voltage transformation is different from the oil transformer. It is strictly prohibited to lead the way at the bottom voltage side to prevent the insulation layer of the dry-type transformer from penetrating due to overvoltage caused by overvoltage at the power grid side or lightning stroke on the line.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Monteplata,The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.When sampling in bulk gasoline barrels, samples shall be selected according to % of the number of gasoline barrels,MonteplataTransformer Daquan, but not less than barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to % of the total number of barrels (bottles).The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

404 Not Found

404 Not Found


nginx

Related articles

MonteplataApplication of oil immersed transformerApplicable scope

MonteplataApplication of oil immersed transformerApplicable scope

The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the...

评论列表

466HP159575805
2022-06-19 14:14:37

Finally got MonteplataApplication of oil immersed transformer So happy that! The workmanship is great.

35HP162657470
2022-06-19 15:37:20

MonteplataApplication of oil immersed transformer The quality is very good, I bought it for the second time, the goods are good, the boss is very good

984HP143755493
2022-06-19 14:35:23

Haha, I like it very much, like and cheer for the boss MonteplataApplication of oil immersed transformer

570HP155642700
2022-06-19 14:05:19

MonteplataApplication of oil immersed transformer The price is very high, and the quality is very good if you can buy it at such a price.

263HP145816628
2022-06-19 14:34:02

Haha, MonteplataApplication of oil immersed transformer received! It's too late to confirm, sorry, the boss is very fashionable!

122HP117294921
2022-06-19 14:57:16

MonteplataApplication of oil immersed transformer It’s really good, how long does it take to arrive after the departure?

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。