CarolinaPower transformer parametersColor matching skills

2022-11-19 00:20:52

Dry type transformer factory(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.Carolina,Under normal conditions, if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.Difference between dry-type transformer and oil immersed transformer:Shenyang,If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.For no-load impulse closing of transformer, pay attention to the following matters:


CarolinaPower transformer parametersColor matching skills



If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl,Carolina3150 power transformer, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Under normal conditions, different oil-based oils cannot be mixed. Under special circumstances, if it is necessary to use new oil of different grades, and then the oil mixing test should be carried out.The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe and between the electromagnetic coil and the tap changer.Where can I find it?,The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation,CarolinaPicture of dry-type transformer grounding wire, maintenance and transportation,CarolinaDistribution transformer plant, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.What is the wavelength of oil immersed transformer?Difference between dry-type transformer and oil immersed transformer:


CarolinaPower transformer parametersColor matching skills



If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Service firstAvoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports, tunnel construction, chemical enterprises and factories.Carolina,In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuitOil leakage of bolt or pipe external thread(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.

404 Not Found

404 Not Found


nginx

Related articles

CarolinaPower transformer parametersHow to take measures for large-scale enterprises

CarolinaPower transformer parametersHow to take measures for large-scale enterprises

After the test, connect the data signal contact of the automobile relay with the alarm circuit, the...

评论列表

409HP184720764
2022-11-19 08:22:56

CarolinaPower transformer parameters Delivery is really fast, too efficient, the product has been received, give you a good comment.

984HP143755493
2022-11-19 08:39:27

CarolinaPower transformer parameters I received it, the seller delivered the goods very quickly, the logistics is also very good, the customer service attitude is excellent, very patient, giving people a kind of intimacy, and I really like it. There are also exquisite packaging and high-end atmosphere. It can be seen that the merchants are very careful. CarolinaPower transformer parameters It's really good, it matches the picture, there is no difference, it is really good value for money.

263HP145816628
2022-11-19 08:05:08

The delivery speed is very fast, give your company a thumbs up

122HP117294921
2022-11-19 09:16:02

Every time I receive the goods is very pleasant, but as long as I think of evaluating it, my head is big. Fortunately, a omnipotent friend recommended your home CarolinaPower transformer parameters, the price is good, the quality is good, the delivery is good, and the boss is good.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。