Santa Maria Chi malvacan25hollow grouting anchor bolt manufacturerMaintenance analysis of

2024-03-20 01:30:48
965HP113924865Building materials62

Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time,Santa Maria Chi malvacan32lead small conduit, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. We&#;d better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.In limestone area, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.Santa Maria Chi malvacan, Curing The concrete components shall be covered and moisture cured within h after pouring. The time of concrete curing by watering shall not be less than days for the concrete mixed with Portland cement ordinary portland cement or slag Portland cement; For the concrete mixed with retarded admixture or with impermeability requirements, it shall not be less than degrees. The cured concrete shall be covered with plastic cloth, and all exposed surfaces shall be tightly covered, and condensed water shall be kept in the plastic cloth.It is necessary to comprehensively consider the selection and configuration of grouting pipes, because there are many types of expansion joints and correct selection is very important. Only in this way can the design of the piping system be safe, reasonable, reliable and economical.?Udine, The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold, the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall. The small editor of the grouting pipe reminds everyone that there should be no rust, water and other impurities when using the prestressed machinery. The working clip can be used after removing the foam in the packing box, and the grouting pipe should be properly kept. However, when the prestressed tendon is long and the grouting pipe needs to be tensioned repeatedly, it is suggested that a small amount of lubricant (e.g. anchor pulling spirit) be applied to the tapered hole of the anchor plate by the prestressed machine, which is not only conducive to the follow-up and anchor pulling of the working clip, but also conducive to the multiple grouting of the grouting pipe; Apply lubricant on the outer surface of the tool clip and the inner and outer surfaces of the taper hole of the anchor plate before use, and regularly remove the debris on the clip surface to make the anchor flexible. However, when the clip is cracked or the tooth surface is damaged, it needs to be replaced and can not be used again.The arrangement of the strain gauge shall be installed before the prestressing force is applied, and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.


Santa Maria Chi malvacan25hollow grouting anchor bolt manufacturerMaintenance analysis of



A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning,Santa Maria Chi malvacanmanufacturer of composite anchor rod, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.Four advantages of establishing a good cooperative relationship with customers: Professional production equipment and testing facilities ensure the quality of the supplied grouting pipes.The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?Fair price, the axis deviation shall be ≤ cm, and the bearing capacity of the support joint shall meet the design requirements. When connecting the grouting pipes, bolts must be installed symmetrically and tightened in sequence. Meanwhile, in order to prevent excessive deflection of the grouting pipes when axial force is applied, the deflection must be corrected to the horizontal before axial force is applied.How heavy is a grouting pipe?General treatment method: first, yze what causes the pipe blockage. For the pipe blockage of hard objects, you can poke with steel bars according to the depth, or bind a slightly thicker steel bar with steel wire rope. For the pipe blockage of soft objects, you can use the air compressor pipe to open the air compressor for blowing. Be sure to note that the water in the pipe may rush up like a fountain to pour water all over you! If it is slurry leakage and pipe plugging there is no way to open it. We can only communicate with the testing personnel to change a testing method, such as low strain and core drilling method! Other uses of the grouting pipe: in addition to being used as a detection channel and replacing part of the reinforcement section, the grouting pipe can also be used as a pipe for grouting at the bottom of the pile. Experiments have proved that the bearing capacity of the cast-in-place pile treated with the grouting at the bottom of the pile can be greatly improved. At the same time, the grouting pipe can also be used as a channel for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch through the pipe at the defective part to be grouted. Grouting pipe is specialized in the production of grouting pipe (ultrasonic detection pipe) for bridge pile foundation inspection. The product conforms to the industrial standard steel thin-walled grouting pipe for concrete cast-in-place pile and its use requirements (JT / T -, which was tried out by the Ministry of communications of the people&#;s Republic of China on April , It can not only meet the requirements of the standard, but also greatly improve each index, and obtain the inspection report of Hebei Road and Bridge Inspection Center.


Santa Maria Chi malvacan25hollow grouting anchor bolt manufacturerMaintenance analysis of



The overhead type is a special rack installed at the bottom of the driving head and connected with the wellhead tensioning equipment.average method,At the same time, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics,Santa Maria Chi malvacanGrouting anchor, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.Features of grouting pipe: Simple installation, complete supply; The grouting pipe can be cut at the construction site according to the actual required length of the joint (it is recommended that the longest grouting outlet length should not exceed m); No special installation equipment is required; Grouting time can be arbitrarily selected; When the inner grouting is performed under pressure, the slurry in the grouting pipe can keep filling the whole pipe evenly; The system allows grouting at relatively low pressure; The installation will not affect the characteristics of the building grouting pipe itself; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; If there is no leakage, grouting can be omitted.If any crack is found, otherwise, when the joint is deformed and subjected to water pressure, the ability of the grouting pipe to resist external forces will be greatly reduced. When positioning the grouting pipe, it must be kept flat at the interface, and the grouting pipe must not be allowed to roll or kink. If it is found that there is no twist, it should be adjusted in time. When casting and fixing the grouting pipe, the deviation of the grouting pipe shall be prevented so as not to shorten one side and affect the water stop effect. When pouring and tamping the concrete, it must be vibrated sufficiently to prevent the poor combination of the grouting pipe and the concrete from affecting the water stop effect. The grouting pipe joint must be well bonded. If the construction site conditions are available, the method of hot vulcanization connection can be used.?Santa Maria Chi malvacan,It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation. It has good flexibility. The pipes can be coiled when they are produced, so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain easily bypass obstacles, and is convenient for construction. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.


404 Not Found

404 Not Found


nginx

Related articles

burnaby Expanded shell hollow grouting anchor manufacturerGood performance

burnaby Expanded shell hollow grouting anchor manufacturerGood performance

It is applicable to the laying of buried pipes in gas pipeline projects, and is not applicable to t...

Luxembourg444 stainless steel sheetWhat are the industry advantages of

Luxembourg444 stainless steel sheetWhat are the industry advantages of

Stainless steel belt stainless steel belt is simply ultra-thin and stainless stainless steel pipe wi...

FajadoHow much is the quoted price of I-beam per tonAnalysis of new growth points

FajadoHow much is the quoted price of I-beam per tonAnalysis of new growth points

The defects can be removed by grinding with sand wheel, but the remaining wall thickness must be wi...

UruapanWood floor maintenanceRequirements for equipment

UruapanWood floor maintenanceRequirements for equipment

About strengthening the floor.Advantages: it is warm for many days and cool in summer. Of course,Ur...

Portland310S stainless steel welded pipeLarge room for industry's annual output value improvement

Portland310S stainless steel welded pipeLarge room for industry's annual output value improvement

Argon shall conform to the rules of national specifications and argon with purity of % shall be sele...

Molo jacino40 thick galvanized square pipeApplicable manuals and methods for installation

Molo jacino40 thick galvanized square pipeApplicable manuals and methods for installation

According to metallographic classification, the annealed state of square tube: A. hypoeutectoid stee...

评论列表

530HP141750488
2024-03-20 10:28:44

My colleagues like it very much. Come again next time. It's a rare genuine product. Santa Maria Chi malvacan25hollow grouting anchor bolt manufacturer I'm very satisfied with it. The boss has a good personality, awesome. Not bad. The quality is good. The speed is also fast. Really good!

914HP134131469
2024-03-20 10:16:31

Just received the goods, very good, Santa Maria Chi malvacan25hollow grouting anchor bolt manufacturer great value for money! ! Come in the future!

323HP155335083
2024-03-20 10:00:21

Finally got Santa Maria Chi malvacan25hollow grouting anchor bolt manufacturer So happy that! The workmanship is great.

535HP136858825
2024-03-20 09:11:37

Haha, Santa Maria Chi malvacan25hollow grouting anchor bolt manufacturer received! It's too late to confirm, sorry, the boss is very fashionable!

122HP117294921
2024-03-20 09:35:20

One word! ! value! ! ! The service attitude is really good, Santa Maria Chi malvacan25hollow grouting anchor bolt manufacturer delivery is fast. The quality of the goods is also quite good. I like it so much, thank you.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。