Joint stockGrouting anchorConstruction specification for reconstruction project

2024-02-02 08:32:21
965HP113924865Building materials61

A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning,Joint stockGrouting small conduit and advance anchor rod, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough. The cooperation Specification between the saddle profile on the horseshoe of the grouting pipe and the core is too low. When the outer mold and the horseshoe surface are fitted together, the gap is larger than the thickness of the pipe wall, there is an active gap. Therefore, the Chengdu grouting pipe manufacturer kneads the pipe wall to form an 'eight' shaped wrinkle.Joint stock, Verify the water permeability of the rock stratum according to the measured water absorption of the borehole to determine the grouting pressure and flow and determine the grouting slurry and its initial concentration.?Bani Khallad,Can the stretching speed of grouting pipe be defined? The grouting pipe is used to pad the bottom of the horseshoe,Joint stockPrice of advanced small conduit, change the cooperation specification of the mold, and adjust the cooperation space between the lower tire and the horseshoe.The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass.


Joint stockGrouting anchorConstruction specification for reconstruction project



Before the installation of the grouting pipe, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, the top surface of the steel beam of the grouting pipe shall be adjusted according to the longitudinal, transverse slope and elevation to be -mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation. It has good flexibility. The pipes can be coiled when they are produced, easily bypass obstacles, and is convenient for construction.Manufacturing cost,The grouting pipe at the tensioning end has good anchoring energy and self anchoring energy. Grouting pipe is generally used for tensioning. The grouting pipe at the tensioning end is composed of four parts: clip, anchor plate, anchor base plate and spiral reinforcement. The clip is the key part of the anchoring system. It is two-piece and made of high-quality alloy steel.The longitudinal overlapping width of grouting pipe and grouting pipe shall not be less than cm, and the transverse overlapping width shall not be less than cm. The former shall be placed on the latter according to the asphalt paving direction. After laying the glass fiber grouting pipe, fix the glass fiber grouting pipe with high-quality cement nails and fixed iron sheets with a size of mm mm and a thickness of .mm. The fixed spacing can be determined according to the actual construction situation.The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?


Joint stockGrouting anchorConstruction specification for reconstruction project



It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.Discount,The longitudinal overlapping width of grouting pipe and grouting pipe shall not be less than cm, and the transverse overlapping width shall not be less than cm. The former shall be placed on the latter according to the asphalt paving direction. After laying the glass fiber grouting pipe, fix the glass fiber grouting pipe with high-quality cement nails and fixed iron sheets with a size of mm, mm and a thickness of .mm. The fixed spacing can be determined according to the actual construction situation.The repetitive grouting pipe can be reused for many times,Joint stockLeading small conduit manufacturer, and the core and outer wall of the pipe need to be cleaned after each use. Advantages of grouting pipe grouting pipe is an embedded grouting pipe system, which is used for permanent sealing of construction joints, cold joints, pipe seepage joints, and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water penetrates into the joint, it can be sealed by injecting slurry into the PVC port set on the surface. The proper grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceJoint stockThe following aspects shall be paid attention to during the construction of grouting pipe: when the construction personnel are binding reinforcement and erecting formwork, reliable fixation measures must be taken for the buried grouting pipe to avoid displacement during concrete pouring and ensure the correct position of the grouting pipe in the concrete. When fixing the grouting pipe, and the body part shall not be damaged. The grouting pipe shall be fixed according to the construction specifications required by the design. The common fixing methods are: using additional reinforcement; Fixed with special fixtures; Fix with lead wire and formwork. No matter what fixing method is adopted, the grouting pipe must be positioned accurately, without damaging the effective part of the grouting pipe, so as to facilitate concrete pouring and tamping. During the construction of the grouting pipe, there are many sharp stones and sharp edged reinforcement in the concrete, so when pouring, vibrating and positioning the grouting pipe, attention should be paid to the impact force of pouring and vibrating, so as to avoid piercing the grouting pipe due to excessive force.?The grouting pipe diffuses the load on it. When the reinforced soil is loaded the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil greatly improving the bearing capacity of the soil.How heavy is a grouting pipe?


404 Not Found

404 Not Found


nginx

Related articles

Joint stockGrouting anchorConstruction specification for reconstruction project

Joint stockGrouting anchorConstruction specification for reconstruction project

The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding defo...

评论列表

275HP127226562
2024-02-02 10:00:06

Yes, the top one, honest Joint stockGrouting anchor seller. I have come to buy it a few times, and the service to old customers is very attentive, and I will come often in the future!

750HP120486450
2024-02-02 10:31:36

Joint stockGrouting anchorVery good, very supportive, very good quality, exactly the same as described by the seller, and the price is cheap

224HP159430236
2024-02-02 09:13:40

Cooperation with you is really good, Joint stockGrouting anchor good quality, come to our company again if you have time.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。