DongzhouElectric high-altitude elevatorMainstay of manufacturing
2023-08-19 19:10:44Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.Dongzhou,High altitude operations and maintenance in areas such as repair, logistics, electricity transportation, petroleum, hotel, sports center, mining, and enterprise. The lifting system of the lifting platform is driven by hydraulic pressure, also known as hydraulic liftingProtective measures should comply with regulatory requirements.Baranoa,The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.When applying a normal force of N to any position on either side of the door using a rigid mm square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding mm; After the test, it worked normally.Horizontal lead screw mechanical electricity
Secondly, for the replacement of hydraulic oil on the lifting platform it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered to times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space and ensure that the lifting platform can be lifted to the rated lifting height.The cargo is .m.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.Service first,During the use period the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.Then,DongzhouThree wheel electric elevator, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.
Work is essential, and the main protective accessories include safety belts, protective covers,DongzhouElectric lifting platform 2 meters, platforms and stairs, etc.production,Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.The noise of aluminum alloy electric elevators during operation is relatively low. If the noise is high, it is abnormal. Therefore, it is necessary to do a good job in troubleshooting, find the cause in a timely manner, reduce noise pollution,DongzhouHand push electric elevator, and reduce dangerous accidentsThe angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.Dongzhou,Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.The verticality of the guide rail frame should meet the requirements of the specifications.The bearing capacity of the ground under the concrete foundation plate should be greater than .Mpa.