TampicoGrouting pipeEffect of insoluble carbide on quality
2023-09-07 02:59:18Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method double liquid silicification method, the common disadvantages of grouting pipe grouting method, flower pipe grouting method and drill pipe grouting method are that it is easy to emit slurry along the pipe wall and the grouting layering effect is poor. These disadvantages are particularly prominent when using slurry with good fluidity and long initial setting time; The utility model has the advantages of simple equipment and process good flexibility, fast construction speed, and is more suitable for situations requiring rapid response.According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe, steel flower pipe, advance small conduit, high-pressure grouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities, and determine the grouting slurry and its initial concentration.TampicoGrouting pipeEffect of insoluble carbide on quality,TampicoSeamless pipe,2023-09-0702:59:18● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.The grouting mechanism includes filling grouting, infiltration grouting,TampicoSteel pipe, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.
The secondary grouting pipe can only be grouted once and cannot be reused.After the grouting hole is drilled, install and lower the grouting pipe, grout stop plug, mixer and other facilities in the hole.Tampico,Potiskum,Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.