IstapalukaSeamless pipeThe decline is difficult to stop, and the price is close to the manufacturer's bottom line
2023-09-01 03:26:58Water pressure test water pressure test is that the grouting pump injects clean water into the grouting section, and its main purpose is to check the slurry stop effect of the slurry stop pipe head, especially the slurry stop plug.The grouting equipment, grouting pump and the lowered grouting pipe are connected for grouting, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section, move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.IstapalukaSeamless pipeThe decline is difficult to stop,IstapalukaSteel pipe, and the price is close to the manufacturer's bottom line,2023-09-0103:26:57The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.
● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe steel flower pipe, advance small conduit high-pressure grouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities, and determine the grouting slurry and its initial concentration.Istapaluka,Malabo