Liaoning3-story small household elevatorProduct Library

2023-08-12 13:23:35

Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.The call button on each floor is no longer working, and the call is cut off.Liaoning,The elevator suddenly descends to the bottom floor and resumes normal operation: After the elevator is powered off and reconnected, the leveling reference position needs to be re determined.If the elevator is in a downward direction, immediately close the door and return to the first floor station, and automatically open the elevator door.Naucalpan,The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.Measurement of elevator and escalator shafts (III)Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.


Liaoning3-story small household elevatorProduct Library



Electrical components are roughly divided into screens, electrical switches for each safety circuit, etc. It is the brain of the elevator and the central nervous system of the elevator. The movement, operation, and door opening and closing of the elevator are all controlled by it, so it must be treated as a top priority in daily maintenance work. Do not short circuit the elevator circuit inside the screen during work. When the elevator door system malfunctions, someone shorts the elevator door for convenience in order to find the fault. This is very dangerous, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward, the elevator happens to run up or down to this point, and the hall door is shorted, the elevator cannot stop, so an accident is highly likely to occur. So in our daily maintenance work,LiaoningStage boom elevator, we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover, after maintenance or urgent repairs are completed, we must promptly remove the short-circuit wire. Professional household elevator manufacturer, with a large quantity and excellent quality at a reasonable price. It is fire-resistant, high-temperature resistant, sturdy and durable, safe and reliableThese phenomena are not elevator malfunctions. When the elevator is fully loaded, the elevator does not stop: to avoid overloading, the elevator car no longer responds to the next station's outbound call.There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.Statistics,The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft such as the size of the machine room, floor height,LiaoningVertical barrier free elevator price,LiaoningAluminum alloy mobile lifting platform, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door the parking lot stops. During this process, mainly the height of the floor, and special attention should be paid to moving parts such as counterweights and wire ropes).The front room of the fire elevator is equipped with Class B fireproof doors or fireproof rolling shutters with stopping function.Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.


Liaoning3-story small household elevatorProduct Library



In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.Product line, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Liaoning,There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.


404 Not Found

404 Not Found


nginx

Related articles

New CityHubei hydraulic lifting platformWhat bad methods should be prevented

New CityHubei hydraulic lifting platformWhat bad methods should be prevented

Because many customers have reported that after buying the elevator and using it, and there are vari...

Boya Hotel800 KVA oil type transformerHow to choose the one that suits you according to the actual situation

Boya Hotel800 KVA oil type transformerHow to choose the one that suits you according to the actual situation

Falling foreign matters and piercingThe insulating layer in the middle of the silicon steel plate is...

Lv LiangElectric elevator lifting 10 metersIndustry price policy

Lv LiangElectric elevator lifting 10 metersIndustry price policy

The safety distance between the outer edge of the upper part of the landing door and the moving part...

KilkennyLarge tonnage hydraulic lifting platformManufacturing process analysis

KilkennyLarge tonnage hydraulic lifting platformManufacturing process analysis

KilkennyElectric hydraulic pressure of lifting platform,The design of the power unit is good. Most o...

PingshanAluminum alloy single column lifting platformHow to save

PingshanAluminum alloy single column lifting platformHow to save

The cleaning oil for the hydraulic system must use hydraulic oil of the same brand as the system use...

VicenzaElectric small hydraulic lifting platformDevelopment Quotes

VicenzaElectric small hydraulic lifting platformDevelopment Quotes

The elevator has strong controllability, simple operation, and high accuracy, which can meet differe...

评论列表

605HP153695373
2023-08-12 15:23:23

Liaoning3-story small household elevator I received it, the seller delivered the goods very quickly, the logistics is also very good, the customer service attitude is excellent, very patient, giving people a kind of intimacy, and I really like it. There are also exquisite packaging and high-end atmosphere. It can be seen that the merchants are very careful. Liaoning3-story small household elevator It's really good, it matches the picture, there is no difference, it is really good value for money.

409HP184720764
2023-08-12 14:41:24

Feels of value for money, service attitude is very good, Liaoning3-story small household elevator workmanship is very good, nothing fussy, all five points

709HP180518493
2023-08-12 13:28:43

Since the last time I bought your Liaoning3-story small household elevator, this new model has indeed met the standard and is very good, giving you a good comment.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。